Home / Browse projects / Raigarh, Maharashtra / A Alibaug - Phase 2

Completed No litigation declared Plotted project

A Alibaug - Phase 2

By HOABL Landbuild Private Limited

RG-MH-06333 · RERA P52000052368 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
27 of 100Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

A Alibaug - Phase 2 is a Plotted project by HOABL Landbuild Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000052368 on 21 Aug 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. 73 of the 100 units on this registration are recorded sold or booked.

At a glance

Project

  • NameA Alibaug - Phase 2
  • TypePlotted
  • Location
    • Munawali Chondhi - Karlekar road
    • Munawali
    • Alibag
    • Raigarh
    • 402201
  • Pincode402201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052368
  • ReraGenie IDRG-MH-06333

Builder

  • NameHOABL Landbuild Private Limited
  • Entity typeCompany
  • CINU70109MH2021PTC373418
  • GSTIN27AAICV4566D1Z4
  • DirectorsSagar Gawde, Rakesh Ramdas Gupta
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2023PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Aug 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed111 files

Current status

73%73 of 100 units booked
41.2%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area58,517 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityNagar Rachana and Mulya Nirdharan Vibhag, Raigad, Alibag

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchN M JOSHI MARG BRANCH
Estimated costRs 41.95 cr
Cost incurredRs 17.27 cr
Work done41.16%
BuildingWingEstimatedIncurred
-NARs 41.95 crRs 17.27 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSubodh Mestry
EngineerAkil Ahmad
Chartered AccountantChirag Sarvaiya
Chartered AccountantU S MISHRA AND ASSOCIATES
Chartered AccountantMahadev Sawant & Co
PartnerRole in project
HOABL Landbuild Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 May 2026

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Signed_Form 2A_Allibaug Ph2.pdf26 Jun 2026
Completion CertificateFile: Email from Tehsildar office to MahaRERA-dated 25 May 2026.pdf27 May 2026
Completion CertificateFile: Alibag - Munawali - Completion certificate.pdf7 May 2026
Withdrawal Update Form 1File: Architect Certificate - Alibaug P2 Signed.pdf17 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate - A Alibaug P2_Signed.pdf17 Apr 2026
Withdrawal Update Form 3File: CA Certificate - Alibaug P2_Signed.pdf17 Apr 2026
Withdrawal Update Form 1File: A Alibaug P2 - Architect Certificate.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate_A Alibaug_P-2_Signed.pdf20 Jan 2026
Withdrawal Update Form 1File: A Alibaug P2 - Architect Certificate.pdf20 Jan 2026
Withdrawal Update Form 2File: A Alibaug P2 - Engineer Certificate.pdf20 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate_A Alibaug_P-2_Signed.pdf20 Jan 2026
Withdrawal Update Form 2File: A Alibaug P2 - Engineer Certificate.pdf20 Jan 2026
Withdrawal Update Form 3File: A Alibaug P2 - CA Certificate.pdf20 Jan 2026
Withdrawal Update Form 3File: CA Certificate_A Alibaug-P2_Signed.pdf20 Jan 2026
Withdrawal Update Form 3File: A Alibaug P2 - CA Certificate.pdf20 Jan 2026
Withdrawal Update Form 1File: AC - Au0027 Alibaug Phase 2.pdf28 Oct 2025
Withdrawal Update Form 2File: EC - Au0027 Alibaug Phase 2.pdf28 Oct 2025
Withdrawal Update Form 3File: CA - A Alibaug P2.pdf28 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_A Alibaug P2 - 2024-25.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: A' Alibaug P1.pdf30 Jun 2025
Form 1File: A' Alibaug P2 - Architect Certificate.pdf23 Jun 2025
Form 2File: A' Alibaug P2 - Engineer Certificate.pdf23 Jun 2025
Form 3File: A' Alibaug Phase 2 -P52000052368-CA certificate.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- A Alibaug Phase 2-signed.pdf23 Jun 2025
Form 1File: AR_alibag 2.pdf23 Jun 2025
Form 2File: ER ALIBAUG 2.pdf23 Jun 2025
Form 3File: HOABL Arcade-PHASE-2.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- A Alibaug Phase 2.pdf23 Jun 2025
Form 1File: A' Alibaug Phase 2 - Architect Certificate.pdf23 Jun 2025
Form 2File: A' Alibaug Phase 2 - Engineer Certificate.pdf23 Jun 2025
Form 3File: A' Alibaug Phase 2 - CA Certificate.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- A Alibaug Phase 2_signed.pdf23 Jun 2025
Form 1File: A Alibaug - Phase 2 - Architect certificate.pdf23 Jun 2025
Form 2File: A Alibaug - Phase 2 - Engineer certificate.pdf23 Jun 2025
Form 3File: A Alibaug - Phase 2 - CA certificate.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - A Alibaug Phase 2.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A' Alibaug P2 - Architect Certificate.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A' Alibaug P2 - Engineer Certificate.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- A Alibaug Phase 2-signed.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR_Alibag 1.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR_alibag 2.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HOABL Arcade-PHASE-2.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER_ALIBAUG 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER ALIBAUG 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- A Alibaug Phase 2.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A' Alibaug Phase 2 - Architect Certificate.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A' Alibaug Phase 2 - CA Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A' Alibaug Phase 2 - Engineer Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- A Alibaug Phase 2_signed.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 16 A' Alibaug Phase 2_Form 5_promoter signed.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5_A Alibaug_Phase 2_signed.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A Alibaug - Phase 2 - Architect certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A Alibaug - Phase 2 - Engineer certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - A Alibaug Phase 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A Alibaug - Phase 2 - CA certificate.pdf20 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Hoabl Arcade.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_A Alibaug Phase 2.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - A Alibaug - Phase 2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Alibaug P2 OND23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Alibaug P2 OND23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-‘A’ Alibaug Phase 2.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H_Arcade_P2.pdf20 Jan 2024
Proforma of Agreement for saleFile: Nov23_Draft AFS_RERA - A Alibaug - Phase 2.pdf29 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Nov23_Deviation Report - A Alibuag Phase 2.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A Alibaug Phase II Signed.pdf25 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for 70 Bank Account P2.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_Alibaug 2.pdf21 Oct 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrances - P-2.pdf18 Oct 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrances - P-2.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A Alibaug P2.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A Alibaug Phase II Signed.pdf17 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC-com.pdf16 Aug 2023
Other - TechnicalFile: Clarification Letter_16082023.pdf16 Aug 2023
Other - TechnicalFile: Munavali 01.pdf16 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Munawali NA Order - 11082023.pdf11 Aug 2023
Other - TechnicalFile: Munavali Sheet No 1.pdf11 Aug 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationStatusPromisedDelivered
Imperial Goa Phase 2Survey No. 20/1-A of Village Bainguinim , Taluka Tiswadi, District of North Goa, State of Goa , Tiswadi , North Goa , GoaCompletedJun 2025Jun 2024
Imperial Goa Phase 1Survey No 20 1 A of Village Bainguinim situated in Village Baiguinim Taluka Tiswadi , District of North Goa State of Goa, Tiswadi, North Goa.CompletedJun 2025Jun 2025

How this compares with Raigarh

73%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep A Alibaug - Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Munawali5,900+ in Raigarh

2 kmA Alibaug - Phase 2Completed 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: HOABL Landbuild Private Limited

HOABL Landbuild Private Limited has 2 registrations on MahaRERA, including 'A' Alibaug - Phase 1 and A Alibaug - Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if A Alibaug - Phase 2 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of A Alibaug - Phase 2?

The registered promoter entity is HOABL Landbuild Private Limited, a company as per the filing. Its CIN U70109MH2021PTC373418 and GSTIN 27AAICV4566D1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in A Alibaug - Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for A Alibaug - Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at A Alibaug - Phase 2?

The professionals named in the filing: Architect: Subodh Mestry; Engineer: Akil Ahmad; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: U S MISHRA AND ASSOCIATES; Chartered Accountant: Mahadev Sawant & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in A Alibaug - Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About A Alibaug - Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save A Alibaug - Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.