Home / Browse projects / Mumbai Suburban, Maharashtra / 86 CENTRAL A

Registration lapsed Litigation declared Commercial project

86 CENTRAL A

By Sri Sai Nidhi Realtors Private Limited

RG-MH-02901 · RERA P51800021290 · Last updated on MahaRERA portal: 22 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
6 of 11Construction stages donefurthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

86 CENTRAL A is a Commercial project by Sri Sai Nidhi Realtors Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021290 on 21 Jun 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • Name86 CENTRAL A
  • TypeCommercial
  • Location
    • Link Road
    • Ghatkopar West
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • RERA no.P51800021290
  • ReraGenie IDRG-MH-02901

Builder

  • NameSri Sai Nidhi Realtors Private Limited
  • Entity typeCompany
  • CINU45200MH2006PTC161449
  • DirectorsJatin Mehta, Darshan Dhami
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredJun 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Jun 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed151 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
86 CENTRAL ANA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

86 CENTRAL A: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 22 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area399 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5880.0
Proposed, not sanctioned5,880 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLot No D 19, Veer Building, Dattatray Road, Santacruz West, Mumbai 400054

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishwas Jivraj Satodia
ArchitectVishwas Satodia
EngineerRamesh Balayya Rapelli
EngineerJai Prakash Mishra
EngineerRamesh B Rapeli
Chartered AccountantSawant & Kadrekar LLP
Chartered AccountantTolia & Associates
Chartered AccountantSawant and Kadrekar
Chartered AccountantTOLIA AND ASSOCIATES
Chartered AccountantJW AND ASSOCIATES
Chartered AccountantRakesh Shah & Assocaites
PartnerRole in project
Sri Sai Nidhi Realtors Private Limited-

Litigation declared1

CaseCourtStatus
3109/2018High Court of BombayOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2025 03 31.pdf22 Apr 2025
Other - TechnicalFile: 2025 04 09 - Part OC - 86 Central A.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2025 12 31.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2024 12 31.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2024 12 31.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2024 12 31 - 86 Central A.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2024 12 31.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2024 09 30.pdf13 Dec 2024
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2024 09 30.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2024 09 30 - 86 Central A.PDF16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2024 09 30.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2024 06 30.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Form 3 - 86 Central A - sold-unsold.pdf12 Aug 2024
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2024 06 30.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 86 Central A - FY 2023-24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2024 06 30.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2024 03 31.pdf18 Jun 2024
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2023 12 31_Revised 1.PDF9 May 2024
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2023 12 31_Revised-Again.PDF9 May 2024
Certificates of CA (Form 3)File: Form 3 - 86 Central A - 2023 12 31_Revised.PDF7 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC with Receipt.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 86 Central A - FY 2020-21.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 86 Central A - FY 2021-22.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 86 Central A - FY 2022-23.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 86 Central A - FY 2023-24.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2024 03 31.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2019 06 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2019 09 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2019 12 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2020 03 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2020 06 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2020 09 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2020 12 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2021 03 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2021 06 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2021 09 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2021 12 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2022 03 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2022 06 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2022 09 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2022 12 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2023 03 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2023 06 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2023 09 30.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2023 12 31.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory - 2024 03 31.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 86 Central A - FY 2020-21.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 86 Central A - FY 2021-22.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 86 Central A - FY 2022-23.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2021 09 30.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2021 12 31.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2022 03 31.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2022 06 30.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2022 09 30.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2022 12 31.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2023 03 31.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2023 06 30.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2023 09 30.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2023 12 31.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 86 Central A - 2024 03 31.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 86a 09 2022.pdf8 Apr 2024
Certificates of CA (Form 3)File: Form-3 - 86 Crystal A - 31 12 2023.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 86 Crystal A - 31 12 2023.pdf5 Apr 2024
Certificates of CA (Form 3)File: Form-3 - 86 Crystal A - 30 09 2023.pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 86 Crystal A 2019-20.pdf3 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 - 86 Crystal A - 2020-21 - Final.pdf3 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 - 86 Crystal A - 2021-22 - Final.pdf3 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 - 86 Crystal A - 2022-23 - Final.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2023 09.pdf9 Nov 2023
Proforma of Agreement for saleFile: Proforma - Agreement for sale - SSN 86CentralA.pdf26 Sep 2023
Layout approvalFile: SSN- 86C-Layout.pdf11 Sep 2023
Copy of Layout Approval (in case of layout)File: SSN- 86C-Layout.pdf11 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: SSN -86C-Full CC.pdf11 Sep 2023
Declaration about Commencement CertificateFile: SSN- 86C-CC declaration.pdf11 Sep 2023
Disclosure of sold/ booked inventoryFile: SSNRPL - sold unsold as on date.pdf11 Sep 2023
Certificates of CA (Form 3)File: Form 3 - 86 Central A - June 23.pdf5 Sep 2023
Certificates of CA (Form 3)File: Form 3 - 86 Central A - March 23.pdf5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Central A - 2023 06.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 86 Crystal A - March 2023.pdf3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 86 CENTRAL A DEC 2022.pdf11 Feb 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 86 CENTRAL A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar West6,700+ in Mumbai Suburban

Builder: Sri Sai Nidhi Realtors Private Limited

Sri Sai Nidhi Realtors Private Limited has 3 registrations on MahaRERA, including 86 CENTRAL A and Crystal Palladian 207. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that 86 CENTRAL A shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 86 CENTRAL A is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 86 CENTRAL A?

The registered promoter entity is Sri Sai Nidhi Realtors Private Limited, a company as per the filing. Its CIN U45200MH2006PTC161449 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 86 CENTRAL A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 86 CENTRAL A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 86 CENTRAL A?

The professionals named in the filing: Architect: Vishwas Jivraj Satodia; Architect: Vishwas Satodia; Engineer: Ramesh Balayya Rapelli; Engineer: Jai Prakash Mishra; Engineer: Ramesh B Rapeli; Chartered Accountant: Sawant & Kadrekar LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 86 CENTRAL A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 86 CENTRAL A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 86 CENTRAL A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.