Home / Browse projects / Mumbai Suburban, Maharashtra / 78 East

Completed No litigation declared Residential / Group Housing project

78 East

By Advait Builders & Developers

RG-MH-68596 · RERA P51800034498 · Last updated on MahaRERA portal: 8 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

78 East is a Residential / Group Housing project by Advait Builders & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034498 on 11 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • Name78 East
  • TypeResidential / Group Housing
  • Location
    • Nehru Nagar
    • Kurla East
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • RERA no.P51800034498
  • ReraGenie IDRG-MH-68596

Builder

  • NameAdvait Builders & Developers
  • Entity typePartnership
  • PartnersAshish Umesh Sakhare, Shrikant Krishna Jambhulkar, Tushar Shrikrishna Khatu
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredApr 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Apr 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WingNA190000
B - WingNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A-Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B - Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50
BuildingClosed/CoveredTotal
A-Wing2525
B - Wing2525

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area837 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Nehru Nagar Rajanigandha CHS LTDKurlaMumbai Suburban

Approvals and building plan

Permissible FSI6615.31
Proposed, not sanctioned6,615 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 2 BPS PRATISHTHA DEVIDAYAL ROAD OPP T WARD MUNICIPAL OFFICE PANCH RASTA MULUND

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Advait Builders & Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Oct 2024

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 (36).pdf8 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full_OCC_Signed-78.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 78 EAST - FORM 1.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 78East as on 30-09-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on June 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 78East as on 30-06-2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 78 East as on March 2024.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 78 East as on March 2024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 78 East as on March 2024.pdf15 Apr 2024
Declaration about Commencement CertificateFile: Format D.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Architech Certifiacte.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Enginers Certificate.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Circular -29.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Format D.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certified_11zon.pdf23 Feb 2024
Building plan approvalFile: MYSCAN_20230701_0001 (1).pdf20 Feb 2024
Building plan approvalFile: MYSCAN_20230701_0002.pdf20 Feb 2024
Building plan approvalFile: MYSCAN_20230701_0003.pdf20 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230701_0001 (1).pdf20 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230701_0002.pdf20 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230701_0003.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 78East as on 31-12-2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 78 East as on Dec 2023.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- 78 EAST as on September 2023.pdf18 Nov 2023
Building plan approvalFile: IOD Approval.pdf1 Nov 2023
Building plan approvalFile: Page 1 to 4.pdf1 Nov 2023
Building plan approvalFile: Page 5.pdf1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Approval.pdf1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 1 to 4.pdf1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 5.pdf1 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on Sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on Sept 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 78East as on 30-09-2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 78 East Form 5 FY 2022-23.pdf22 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 78 East - Form 5 as on 2022-23.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- 78 East.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on June 2023.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 78 East as on 30-06-2023.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Circular -29.pdf19 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on 31-03-2023.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 78 East as on 31-03-2023.pdf16 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 78 East.pdf27 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 78 EAST-2.pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: Circular 29- 78 East.pdf9 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 78 East as on December 2022.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 78 East as on December 2022.pdf4 Feb 2023
Disclosure of sold/ booked inventoryFile: Circular 29 (78 East) Scan.pdf18 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 78 East- September 2022.pdf10 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 78 East as on September 2022_compressed.pdf10 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- 78 East.pdf14 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 78 East- June 2022.pdf20 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Final Form 3 78 East.pdf20 Sep 2022
Proforma of Allotment letterFile: Draft Agreement for Sale DTD 5th May 2022.pdf30 May 2022
Proforma of Allotment letterFile: Draft-Allotment Letter Dtd 5th May 2022.pdf30 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Further CC Bldg No 78.pdf7 Apr 2022
CERSAI detailsFile: 78 East.pdf7 Apr 2022
Copy of the legal title reportFile: TITLE REPORT IN RERA FORMAT - 78 East_compressed.pdf31 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Final Form 3 N N Rajnigandha CHSL.pdf31 Mar 2022
Details of encumbrancesFile: Encumbrance Letter To Whomsoever It May Concern.pdf30 Mar 2022
Declaration about Commencement CertificateFile: Circuler ( Commencement Certificate ).pdf30 Mar 2022
Declaration in FORM BFile: Form B, Undertaking Cum Declaration ( Developer).pdf30 Mar 2022
Proforma of Allotment letterFile: AFS-Redevelopment.pdf29 Mar 2022
Proforma of Allotment letterFile: Allotment Letter_Advait.pdf29 Mar 2022
Layout approvalFile: Plan 0001_rotated_compressed.pdf24 Mar 2022
Building plan approvalFile: ilovepdf_merged.pdf24 Mar 2022
Building plan approvalFile: ilovepdf_merged (1).pdf24 Mar 2022
PAN CardFile: Advait Builders Pancard.pdf24 Mar 2022
Copy of Layout Approval (in case of layout)File: Plan 0001_rotated_compressed.pdf24 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged.pdf24 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (1).pdf24 Mar 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 78 East on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla East6,700+ in Mumbai Suburban

Builder: Advait Builders & Developers

Advait Builders & Developers has 3 registrations on MahaRERA, including 78 East and Eternal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 78 East is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 78 East?

The registered promoter entity is Advait Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 78 East?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 78 East?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in 78 East?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 78 East. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 78 East to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.