ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / 4Anaika

Completed No litigation declared Residential / Group Housing project

4Anaika

By ARIHANT SUPERSTRUCTURES LIMITED

RG-MH-15664 · RERA P52000022982 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
12 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 98%
2Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

4Anaika is a Residential / Group Housing project by ARIHANT SUPERSTRUCTURES LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000022982 on 8 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2027. 2 complaints are on record with the regulator.

At a glance

Project

  • Name4Anaika
  • TypeResidential / Group Housing
  • Location
    • Koyna Velhe
    • Raigarh
    • Koyana Velhe
    • Panvel
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000022982
  • ReraGenie IDRG-MH-15664

Builder

  • NameARIHANT SUPERSTRUCTURES LIMITED
  • Entity typeCompany
  • CINL51900MH1983PLC029643
  • GSTIN27AABCS1848L1Z2
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations13 more →
  • Completed5 of 14

Key dates

this monthRegisteredNov 2019PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Nov 2019
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NNA110000
ONA110000
PNA110000
QNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 98%.

N71%
ActivityProgress
Excavation100%
Basement (if any)98%
Podiums (if any)0%
Plinth98%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises49%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
O67%
ActivityProgress
Excavation100%
Basement (if any)98%
Podiums (if any)0%
Plinth98%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises51%
Sanitary Fittings within the flats / premises38%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11%
P62%
ActivityProgress
Excavation100%
Basement (if any)98%
Podiums (if any)0%
Plinth98%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.32%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Q71%
ActivityProgress
Excavation100%
Basement (if any)98%
Podiums (if any)0%
Plinth98%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises43%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.89%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Closed/Covered128
BuildingClosed/CoveredTotal
N3131
O3737
P3232
Q2828

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,740 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13136.0
Proposed, not sanctioned11,381 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17, VARDHMAN MARKET CO-OPERATIVE PREMISES, VASHI, NAVI MUMBAI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN K AWHALE
ArchitectYogita Bhandarkar
EngineerSAURABH PUROHIT
EngineerKaleem Sayyad
Chartered AccountantJwala Gupta
PartnerRole in project
ARIHANT SUPERSTRUCTURES LIMITED-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000429030Krishna Kumar JhaShri Ashok Chhachhar10/04/2024
CC12502390Nitin Rajendra DhandoreARIHANT SUPERSTRUCTURES LIMITED14/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2023

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER.pdf12 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: 4ANAIKA - FORM 4.PDF12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 _ 4 ANAIKA 310322 dsc.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 _ 4 ANAIKA 300922 dsc.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Arihant_4Anaika_Form _2019-20.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Arihant_4Anaika_Form _2021-22.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERA4ANAIKAMARCH2021.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERA4ANAIKA211221.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERA4ANAIKAMARCH22.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERA4ANAIKAJUNE22.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERA4ANAIKADEC22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4ANAIKA30062022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4ANAIKA30092022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 4ANAIKA21122021.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM24ANAIKA31032020.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM24ANAIKA31032021.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM24ANAIKA31032022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM24ANAIKA31122021.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM24ANAIKA31122022.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2022.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Anaika.pdf22 Feb 2022
Layout approvalFile: Revised Layout Plan_Increase in slab.pdf10 Jul 2021
Building plan approvalFile: 2.pdf10 Jul 2021
Building plan approvalFile: 3.pdf10 Jul 2021
Building plan approvalFile: 4.pdf10 Jul 2021
Building plan approvalFile: 5.pdf10 Jul 2021
Building plan approvalFile: 6.pdf10 Jul 2021
Building plan approvalFile: 7.pdf10 Jul 2021
Building plan approvalFile: 8.pdf10 Jul 2021
Building plan approvalFile: 9.pdf10 Jul 2021
Building plan approvalFile: 10.pdf10 Jul 2021
Building plan approvalFile: 11.pdf10 Jul 2021
Building plan approvalFile: 12.pdf10 Jul 2021
Copy of Layout Approval (in case of layout)File: Revised Layout Plan_Increase in slab.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf10 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf10 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_4 Anaika_050721_RERA.pdf10 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_4 Anaika_RERA.pdf10 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_4Anaika.pdf12 Jan 2021
Layout approvalFile: Layout Plan_4Anaika.pdf8 Jan 2021
Building plan approvalFile: Building Plan_4Anaika.pdf8 Jan 2021
Copy of the legal title reportFile: New Title Certificate_4Anaika.pdf8 Jan 2021
Copy of Layout Approval (in case of layout)File: Layout Plan_4Anaika.pdf8 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_4Anaika.pdf8 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate_4Anaika (1).pdf8 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_4Anaika.pdf8 Jan 2021
Proforma of Allotment letterFile: Updated Agreement for Sale_4Anaika_080121.pdf8 Jan 2021
Declaration in FORM BFile: RevisedCC_4Anaika.pdf8 Jun 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_4Anaika.pdf8 Jun 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plinth Completion Certificate_4Anaika.pdf26 May 2020
OtherFile: Intimation to mahaRERA_ASL_Lockdown.pdf1 Apr 2020
PAN CardFile: PAN Card_ASL.pdf31 Oct 2019
Proforma of Allotment letterFile: Agreement for Sale_4 Anaika.pdf19 Oct 2019
Building plan approvalFile: Club House.pdf16 Oct 2019
Copy of the legal title reportFile: Title Certificate Surevey No 37.PDF16 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Club House.pdf16 Oct 2019
Declaration in FORM BFile: Affidavit in Fom B_Sameer Golapkar.pdf16 Oct 2019
Proforma of Allotment letterFile: Performa of the allotement letter_4Anaika.pdf16 Oct 2019
Layout approvalFile: Layout Plan_4 Anaika.pdf15 Oct 2019
Building plan approvalFile: Building- N.pdf15 Oct 2019
Building plan approvalFile: Building- O.pdf15 Oct 2019
Building plan approvalFile: Building- P.pdf15 Oct 2019
Details of encumbrancesFile: Declaration of Encumberance_4Anaika.PDF15 Oct 2019
Copy of Layout Approval (in case of layout)File: Layout Plan_4 Anaika.pdf15 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Building- N.pdf15 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Building- O.pdf15 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Building- P.pdf15 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: CC_4Anaika.pdf15 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_4Anaika.pdf15 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_4Anaika.pdf15 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_4Anaika.pdf15 Oct 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 4Anaika on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Raigarh5,900+ in Raigarh

2 km4AnaikaCompleted 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: ARIHANT SUPERSTRUCTURES LIMITED

ARIHANT SUPERSTRUCTURES LIMITED has 14 registrations on MahaRERA, including ARIHANT ARSHIYA PHASE II and ARIHANT ARSHIYA PHASE III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if 4Anaika is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 4Anaika?

The registered promoter entity is ARIHANT SUPERSTRUCTURES LIMITED, a company as per the filing. Its CIN L51900MH1983PLC029643 and GSTIN 27AABCS1848L1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 4Anaika?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 4Anaika?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 4Anaika?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 4Anaika?

The professionals named in the filing: Architect: KIRAN K AWHALE; Architect: Yogita Bhandarkar; Engineer: SAURABH PUROHIT; Engineer: Kaleem Sayyad; Chartered Accountant: Jwala Gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 4Anaika?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 4Anaika. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 4Anaika to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.