Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Feb 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 66%
30 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

44 NECTAR RESIDENCY is a Residential / Group Housing project by JACKPOT DEALER PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500056313 on 25 May 2024. Possession is promised by 11 Feb 2029. 0 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • Name44 NECTAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 44
    • CITY SURVEY NO 461
    • SHEET NO 09
    • MOUZA AMBAZARI
    • HOUSE NO 65/G/1
    • WARD NO 73
    • CIVIL STATION EXPANSION SCHEME
    • DHARAMPETH EXTENSION
    • SHIVAJI...
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500056313
  • ReraGenie IDRG-MH-33911

Builder

  • NameJACKPOT DEALER PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsRajesh Amrutlal Vasani, Mrs Kiran Rajesh Vasani
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024PromisedFeb 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 May 2024
  • Promised completion11 Feb 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

0%0 of 30 units booked
37.7%Work done, per cost certificate

Figures as on 18 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
44 NECTAR RESIDENCYNA151530030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 66%.

44 NECTAR RESIDENCY: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Open Space28

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area836 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Nov 2025
LandownerVillageDistrict
SURESH GAJANAN BENDRENagpur (M Corp.)Nagpur
PUSHPA WD/O KAMALAKAR BENDRENagpur (M Corp.)Nagpur
SANDHYA MANOJ TAMHANENagpur (M Corp.)Nagpur
VIJAY GAJANAN BENDRENagpur (M Corp.)Nagpur
RAMAKANT GOPALRAO MUJUMDARNagpur (M Corp.)Nagpur
INDRAYANI RAMAKANT MUJUMDARNagpur (M Corp.)Nagpur
APURVA RAMAKANT MUJUMDARNagpur (M Corp.)Nagpur
SARITA RATNAKAR BENDRENagpur (M Corp.)Nagpur
ANNIE THOMAS GEORGE WD/O BABU EAPEN GORGENagpur (M Corp.)Nagpur
CHERIAN GEORGE S/O BABU EAPEN GEORGENagpur (M Corp.)Nagpur
THOMAS BABU GEORGE CHERIAN S/O BABU EAPEN GEORGENagpur (M Corp.)Nagpur
SHAMRAO NATHUJI BARAPATRENagpur (M Corp.)Nagpur
MADHAVI SUBHASH SHEMBEKARNagpur (M Corp.)Nagpur
PRAKASH SHRIPAD SHEMBEKARNagpur (M Corp.)Nagpur
MUGDHA PRAKASH SHEMBEKARNagpur (M Corp.)Nagpur
NARENDRASINGH BHUVANSINGH NAGBHIRENagpur (M Corp.)Nagpur
VIJAY SADASHIV DESHPANDENagpur (M Corp.)Nagpur
DR SMITA VIJAY DESHPANDENagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityTown PLanning Department, Nagpur Municipal Corporation
Permissible FSI3705.5
Proposed, not sanctioned3,706 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP AIR PORT CENTRE POINT, SOMALWADA, NAGPUR 440 025
Estimated costRs 7.72 cr
Cost incurredRs 2.91 cr
Work done37.71%
BuildingWingEstimatedIncurred
44 NECTAR RESIDENCYNARs 7.72 crRs 2.91 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKALP CREATIONS JAISWAL
EngineerAAJ ENGINERS AND CONSULTANTS PVT LTD
Chartered AccountantRANJEET MISHRA AND COMPANY MISHRA
PartnerRole in project
JACKPOT DEALER PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 11 Feb 2029

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate September 2025.pdf18 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate September 2025.pdf18 Dec 2025
Withdrawal Update Form 3File: CA Certificate September 2025.pdf18 Dec 2025
Withdrawal Update Form 1File: Architect Certificate.pdf15 Nov 2025
Withdrawal Update Form 1File: Architect Certificate.pdf15 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate June 2025.pdf15 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate June 2025.pdf15 Nov 2025
Withdrawal Update Form 3File: Updated C A Certificate.pdf15 Nov 2025
Withdrawal Update Form 3File: C A Certificate June 2025.pdf15 Nov 2025
Form 1File: Architect Certificate.pdf17 May 2025
Form 2File: Engineer Certificate.pdf17 May 2025
Form 3File: C A Certificate.pdf17 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold details.pdf17 May 2025
Form 1File: Engineer Certificate.pdf17 May 2025
Form 2File: Architect Certificate.pdf17 May 2025
Form 3File: Sold Unsold details.pdf17 May 2025
Disclosure of Sold and Booked InventoryFile: C A Certificate.pdf17 May 2025
Form 1File: Engineer Certificate.pdf17 May 2025
Form 2File: Architect Certificate.pdf17 May 2025
Form 3File: Sold Unsold details.pdf17 May 2025
Disclosure of Sold and Booked InventoryFile: C A Certificate.pdf17 May 2025
Form 1File: Engineer Certificate.pdf17 May 2025
Form 2File: Sold Unsold details.pdf17 May 2025
Form 3File: Architect Certificate.pdf17 May 2025
Disclosure of Sold and Booked InventoryFile: C A Certificate.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Updated C A Certificate.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: Declaration About Financial Encumbrances.pdf26 Apr 2024
Details of encumbrances concerned to LegalFile: Declaration About Financial Encumbrances.pdf26 Apr 2024
Other - LegalFile: Annexure A Declaration Cum Undertaking.pdf26 Apr 2024
Other - TechnicalFile: Annexure A Declaration Cum Undertaking.pdf26 Apr 2024
Other - TechnicalFile: GetUserDocumentFileContent.pdf26 Apr 2024
Copy of the legal title reportFile: Updated Title Search Report.pdf8 Apr 2024
Other - LegalFile: Screen Shot of Mail Sent by Planning Authorities.pdf8 Apr 2024
PAN CardFile: PAN Card of Company.pdf29 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration about Encumbrance and Litigation.pdf29 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration about Encumbrance and Litigation.pdf29 Feb 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf29 Feb 2024
Declaration in FORM BFile: Form B Rakeshkumar Pandey Jackpot Dealers.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed.pdf29 Feb 2024
CERSAI detailsFile: Underteking for Cresai.pdf29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Rajesh Vasani.pdf29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Kiran Vasani.pdf29 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank Account.pdf29 Feb 2024
Deviation Report with respect to Allotment letterFile: No Deviation Report to Allotment Letter.pdf29 Feb 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation Report of Agreement for Sale.pdf29 Feb 2024
Layout approvalFile: Sanction Plan.pdf23 Feb 2024
Building plan approvalFile: Sanction Plan.pdf23 Feb 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan.pdf23 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Building Permission and Commencement Certificate.pdf23 Feb 2024
Proforma of Agreement for saleFile: Model Form of Agreement.pdf23 Feb 2024
Proforma of Allotment letterFile: Format of Allotment Letter.pdf23 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NECTAR RESIDENCY - IDeonagar Khamla Nagpur18CompletedDec 2014Jul 2014

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 44 NECTAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI NAGAR2,800+ in Nagpur

2 km44 NECTAR RESIDENCYCompleted 29Lapsed / revoked 15Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: JACKPOT DEALER PRIVATE LIMITED

JACKPOT DEALER PRIVATE LIMITED has 2 registrations on MahaRERA, including NECTAR RESIDENCY-II and 44 NECTAR RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if 44 NECTAR RESIDENCY is delayed beyond 11 Feb 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 44 NECTAR RESIDENCY?

The registered promoter entity is JACKPOT DEALER PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 44 NECTAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 44 NECTAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 44 NECTAR RESIDENCY?

The professionals named in the filing: Architect: SANKALP CREATIONS JAISWAL; Engineer: AAJ ENGINERS AND CONSULTANTS PVT LTD; Chartered Accountant: RANJEET MISHRA AND COMPANY MISHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 44 NECTAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 44 NECTAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 44 NECTAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.