44 NECTAR RESIDENCY
By JACKPOT DEALER PRIVATE LIMITED
RG-MH-33911 · RERA P50500056313 · Last updated on MahaRERA portal: 18 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
44 NECTAR RESIDENCY is a Residential / Group Housing project by JACKPOT DEALER PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500056313 on 25 May 2024. Possession is promised by 11 Feb 2029. 0 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- Name44 NECTAR RESIDENCY
- TypeResidential / Group Housing
- Location
- PLOT NO 44
- CITY SURVEY NO 461
- SHEET NO 09
- MOUZA AMBAZARI
- HOUSE NO 65/G/1
- WARD NO 73
- CIVIL STATION EXPANSION SCHEME
- DHARAMPETH EXTENSION
- SHIVAJI...
- Pincode440010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500056313
- ReraGenie IDRG-MH-33911
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 May 2024
- Promised completion11 Feb 2029
- Revised completionNone
- Buildings1 building record
- Documents filed61 files
Current status
Figures as on 18 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 44 NECTAR RESIDENCY | NA | 15 | 15 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 66%.
44 NECTAR RESIDENCY: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 66% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 33% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership18
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SURESH GAJANAN BENDRE | Nagpur (M Corp.) | Nagpur |
| PUSHPA WD/O KAMALAKAR BENDRE | Nagpur (M Corp.) | Nagpur |
| SANDHYA MANOJ TAMHANE | Nagpur (M Corp.) | Nagpur |
| VIJAY GAJANAN BENDRE | Nagpur (M Corp.) | Nagpur |
| RAMAKANT GOPALRAO MUJUMDAR | Nagpur (M Corp.) | Nagpur |
| INDRAYANI RAMAKANT MUJUMDAR | Nagpur (M Corp.) | Nagpur |
| APURVA RAMAKANT MUJUMDAR | Nagpur (M Corp.) | Nagpur |
| SARITA RATNAKAR BENDRE | Nagpur (M Corp.) | Nagpur |
| ANNIE THOMAS GEORGE WD/O BABU EAPEN GORGE | Nagpur (M Corp.) | Nagpur |
| CHERIAN GEORGE S/O BABU EAPEN GEORGE | Nagpur (M Corp.) | Nagpur |
| THOMAS BABU GEORGE CHERIAN S/O BABU EAPEN GEORGE | Nagpur (M Corp.) | Nagpur |
| SHAMRAO NATHUJI BARAPATRE | Nagpur (M Corp.) | Nagpur |
| MADHAVI SUBHASH SHEMBEKAR | Nagpur (M Corp.) | Nagpur |
| PRAKASH SHRIPAD SHEMBEKAR | Nagpur (M Corp.) | Nagpur |
| MUGDHA PRAKASH SHEMBEKAR | Nagpur (M Corp.) | Nagpur |
| NARENDRASINGH BHUVANSINGH NAGBHIRE | Nagpur (M Corp.) | Nagpur |
| VIJAY SADASHIV DESHPANDE | Nagpur (M Corp.) | Nagpur |
| DR SMITA VIJAY DESHPANDE | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 44 NECTAR RESIDENCY | NA | Rs 7.72 cr | Rs 2.91 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANKALP CREATIONS JAISWAL |
| Engineer | AAJ ENGINERS AND CONSULTANTS PVT LTD |
| Chartered Accountant | RANJEET MISHRA AND COMPANY MISHRA |
| Partner | Role in project |
|---|---|
| JACKPOT DEALER PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 11 Feb 2029
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate September 2025.pdf | 18 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate September 2025.pdf | 18 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate September 2025.pdf | 18 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate June 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate June 2025.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Updated C A Certificate.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: C A Certificate June 2025.pdf | 15 Nov 2025 |
| Form 1File: Architect Certificate.pdf | 17 May 2025 |
| Form 2File: Engineer Certificate.pdf | 17 May 2025 |
| Form 3File: C A Certificate.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold details.pdf | 17 May 2025 |
| Form 1File: Engineer Certificate.pdf | 17 May 2025 |
| Form 2File: Architect Certificate.pdf | 17 May 2025 |
| Form 3File: Sold Unsold details.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: C A Certificate.pdf | 17 May 2025 |
| Form 1File: Engineer Certificate.pdf | 17 May 2025 |
| Form 2File: Architect Certificate.pdf | 17 May 2025 |
| Form 3File: Sold Unsold details.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: C A Certificate.pdf | 17 May 2025 |
| Form 1File: Engineer Certificate.pdf | 17 May 2025 |
| Form 2File: Sold Unsold details.pdf | 17 May 2025 |
| Form 3File: Architect Certificate.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: C A Certificate.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 7 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 7 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Updated C A Certificate.pdf | 21 May 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration About Financial Encumbrances.pdf | 26 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Declaration About Financial Encumbrances.pdf | 26 Apr 2024 |
| Other - LegalFile: Annexure A Declaration Cum Undertaking.pdf | 26 Apr 2024 |
| Other - TechnicalFile: Annexure A Declaration Cum Undertaking.pdf | 26 Apr 2024 |
| Other - TechnicalFile: GetUserDocumentFileContent.pdf | 26 Apr 2024 |
| Copy of the legal title reportFile: Updated Title Search Report.pdf | 8 Apr 2024 |
| Other - LegalFile: Screen Shot of Mail Sent by Planning Authorities.pdf | 8 Apr 2024 |
| PAN CardFile: PAN Card of Company.pdf | 29 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration about Encumbrance and Litigation.pdf | 29 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Declaration about Encumbrance and Litigation.pdf | 29 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 29 Feb 2024 |
| Declaration in FORM BFile: Form B Rakeshkumar Pandey Jackpot Dealers.pdf | 29 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 29 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed.pdf | 29 Feb 2024 |
| CERSAI detailsFile: Underteking for Cresai.pdf | 29 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Rajesh Vasani.pdf | 29 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Kiran Vasani.pdf | 29 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank Account.pdf | 29 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: No Deviation Report to Allotment Letter.pdf | 29 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation Report of Agreement for Sale.pdf | 29 Feb 2024 |
| Layout approvalFile: Sanction Plan.pdf | 23 Feb 2024 |
| Building plan approvalFile: Sanction Plan.pdf | 23 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan.pdf | 23 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan.pdf | 23 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permission and Commencement Certificate.pdf | 23 Feb 2024 |
| Proforma of Agreement for saleFile: Model Form of Agreement.pdf | 23 Feb 2024 |
| Proforma of Allotment letterFile: Format of Allotment Letter.pdf | 23 Feb 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| NECTAR RESIDENCY - I | Deonagar Khamla Nagpur | 18 | Completed | Dec 2014 | Jul 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 44 NECTAR RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVAJI NAGAR2,800+ in Nagpur
Filed coordinates, straight-line distance. 82 registered projects within 2 km.
AADHAR NAGRI - II
S R INFRA
Metrocity-3
Metrocity Projects
KUKREJA WEST19
TAGSURE HOSPITALITY LLP
IMPERIAL GARDEN
Gaurav Agrawal
SHREERAM SKYLINE
CONCRETE DEVELOPERS
THE RHYTHM
RADHESANDESH REALTORS LLP
See every Nagpur project, with the district possession charts
Builder: JACKPOT DEALER PRIVATE LIMITED
JACKPOT DEALER PRIVATE LIMITED has 2 registrations on MahaRERA, including NECTAR RESIDENCY-II and 44 NECTAR RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if 44 NECTAR RESIDENCY is delayed beyond 11 Feb 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 44 NECTAR RESIDENCY?
The registered promoter entity is JACKPOT DEALER PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 44 NECTAR RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 44 NECTAR RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 44 NECTAR RESIDENCY?
The professionals named in the filing: Architect: SANKALP CREATIONS JAISWAL; Engineer: AAJ ENGINERS AND CONSULTANTS PVT LTD; Chartered Accountant: RANJEET MISHRA AND COMPANY MISHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 44 NECTAR RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.