Home / Browse projects / 30 LITTLE GIBBS

Registered No litigation declared Residential / Group Housing project

30 LITTLE GIBBS

By SILA MALABAR HILL REAL ESTATE LLP

RG-MH-06935 · RERA P51900053421 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: .
Jun 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 30%
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

30 LITTLE GIBBS is a Residential / Group Housing project by SILA MALABAR HILL REAL ESTATE LLP in MALABAR, 400006, registered with MahaRERA as P51900053421 on 31 Oct 2023. Possession is promised by 30 Jun 2029.

At a glance

Project

  • Name30 LITTLE GIBBS
  • TypeResidential / Group Housing
  • Location
    • LITTLE GIBBS ROAD
    • MALABAR
    • 400006
  • Pincode400006
  • RERA no.P51900053421
  • ReraGenie IDRG-MH-06935

Builder

  • NameSILA MALABAR HILL REAL ESTATE LLP
  • Entity typePartnership
  • PartnerRUSHABH RAJESH VORA

Key dates

this monthRegisteredOct 2023PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2023
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
30 LITTLE GIBBSNA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 30%.

30 LITTLE GIBBS: 15% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities19

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Golf SimulatorYes0%
GymnasiumYes0%
Multipurpose loungeYes0%
SPAYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,102 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SOUBHAGYA PROPERTIESPRIVATE LIMITED-Mumbai City
GOODWILL PROPERTIES PRIVATE LIMITED-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6904.29
Proposed, not sanctioned6,904 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNYLOC HOUSE, DR ANNIE BESANT ROAD, HANUMAN NAGAR, WORLI-400030

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPANTHAKI ARCHITECTS
ArchitectDesign Group
EngineerSTERLING ENGINEERING CONSULTANTANCY SERVICE PVT LTD
EngineerSuresh Appa Patil
Chartered AccountantANAND YADAV
Chartered AccountantA.K. Yadav & Associates
PartnerRole in project
SILA MALABAR HILL REAL ESTATE LLP-

Litigation declared2

CaseCourtStatus
2104 of 2008/2008High Courtdisposssed off
5137-5138 of 2008/2008Supreme Courtdispossed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_30 LG_Q1 FY 26-27.pdf3 Aug 2026
Form 2File: Form 2_30 LG_Q1 FY 26-27.pdf3 Aug 2026
Form 3File: Form 3_ 30 Little Gibbs_Q1 FY 26-27.pdf3 Aug 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure as 30 June 26.pdf3 Aug 2026
Form 1File: Form-1_30 LG_Q4 FY 25-26.pdf27 Jul 2026
Form 2File: Form-2_30LG_Q4 FY 25-26.pdf27 Jul 2026
Form 3File: Form 3_ 30 Little Gibbs_Q4 FY 25-26_Signed.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_30 LG_Q4 FY 25-26.pdf27 Jul 2026
Form 1File: Form 1_30 LG_Q3 FY 25-26.pdf31 Mar 2026
Form 2File: FORM 2 - 30LG- Q3 25-26 A.pdf31 Mar 2026
Form 3File: Form 3_ 30 Little Gibbs_Q3 FY 25-26.pdf31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_30 LG_Q3 FY 25-26.pdf31 Mar 2026
Form 1File: Form 1_30 LG_Q2 FY 25-26.pdf3 Feb 2026
Form 2File: FORM 2 - 30LG - Q2 25-26.pdf3 Feb 2026
Form 3File: Form 3_ 30 Little Gibbs_Q2 FY 25-26.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Declaration as at 30 Sep 25.pdf3 Feb 2026
Form 5 (FY 2024-2025)File: Form_5_30 Little Gibbs_FY 24-25.pdf31 Jan 2026
Form 1File: 30 Little Gibbs -Form 1 -Q1_ FY 25-26.pdf16 Oct 2025
Form 2File: FORM 2_30LG_Q1 FY 25-26.pdf16 Oct 2025
Form 3File: Form 3_ 30 Little Gibbs_Q1 FY 25-26.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_30 LG_Q1 FY 25-26.pdf16 Oct 2025
Form 1File: 30 Little Gibbs -Form 1 Q-4-24-25.pdf17 Jun 2025
Form 2File: FORM 2 - 30LG - Q4 24-25.pdf17 Jun 2025
Form 3File: Form 3_ 30 Little Gibbs_Q4 FY 24-25.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_30 LG_Q4 FY 24-25.pdf17 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of QPRs_Q4 FY 24-25.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: Inventory Declaration as at 31 December 24.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 30LG - Q2 24-25.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 30LG - Q3 24-25.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ 30 Little Gibbs_Q3 FY 24-25.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 Little Gibbs -Form 1 Q-3-24-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 30LG - Q2 24-25.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 Little Gibbs -Form 1 Q-2-24-25-.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30 LG_Form 3_Q2_FY_24-25.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: 30 LG_Inventory Disclosure_Q2 FY 24-25.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_30 LG-FY-23-24.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 _30 LG_Q1 FY 24-25.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30 LITTLE GIBBS_FORM 3 _Q1 FY 24-25.pdf4 Nov 2024
Disclosure of sold/ booked inventoryFile: 30 LG_Inventory Declaration as at 30 June 24.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 LG - Form 1 - Q1 24-25.pdf20 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - 30 Little Gibbs_FY 2023-24.pdf6 Aug 2024
Home Buyer /Allottee Grievance Redressal CellFile: Appointment of redressal officer - 30 Little Gibbs.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30 LG Q4 FY 23-24.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 LG_Form 1 Q3 FY 23-24.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 LG - Form 1 Q4 FY 23-24.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: 30 LG_Inventory Declaration_Q4 FY 23-24.pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-30 LG RERA_Q4 FY 23-24.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 30LG - Q3 23-24.pdf6 Mar 2024
Disclosure of sold/ booked inventoryFile: 30 LG_Inventory declaration_Q3 FY 23-24.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_30 Little Gibbs_Q3 FY 23-24.pdf6 Mar 2024
Proforma of Agreement for saleFile: Draft AFS.pdf28 Oct 2023
Proforma of Allotment letterFile: Draft Allotment letter.pdf28 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf28 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report AFS reduced.pdf28 Oct 2023
Copy of the legal title reportFile: Legal Title Report -_Part1.pdf26 Oct 2023
Copy of the legal title reportFile: Legal Title Report -_Part2.pdf26 Oct 2023
Copy of the legal title reportFile: Legal Title Report -_Part3.pdf26 Oct 2023
Copy of the legal title reportFile: Legal Title Report -_Part4.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal 26_10_2023.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal 26_10_2023.pdf26 Oct 2023
Declaration in FORM BFile: Sila reduced.pdf26 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200284700275_For_Asset_Based_Search_26_10_2023_12_54_34_320.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Format A.pdf26 Oct 2023
Other - LegalFile: Deed of Conveyance-Jhaveri Mansion_Part1.pdf26 Oct 2023
Other - LegalFile: Deed of Conveyance-Jhaveri Mansion_Part2.pdf26 Oct 2023
Other - LegalFile: Deed of Conveyance-Jhaveri Mansion_Part3.pdf26 Oct 2023
Other - LegalFile: Deed of Conveyance-Jhaveri Mansion_Part4.pdf26 Oct 2023
Other - LegalFile: M k Pathare Conveyance.pdf26 Oct 2023
Other - LegalFile: MHADA LOI - Clubbing -24_03_2023.pdf26 Oct 2023
Other - LegalFile: MHADA LOI - M K Pathare 24_03_2023.pdf26 Oct 2023
Other - LegalFile: MHADA LOI - Jhaveri Mansion-11_05_2023.pdf26 Oct 2023
Other - LegalFile: MHADA NOC - M K Pathare -owner reduced.pdf26 Oct 2023
Other - LegalFile: Mhada Letter.pdf26 Oct 2023
Layout approvalFile: 30 little gibs approved plan Part1.pdf20 Oct 2023
Layout approvalFile: 30 little gibs approved plan Part2.pdf20 Oct 2023
Layout approvalFile: 30 little gibs approved plan Part3.pdf20 Oct 2023
Layout approvalFile: 30 little gibs approved plan Part4.pdf20 Oct 2023
Building plan approvalFile: 30 little gibs approved plan Part1.pdf20 Oct 2023
Building plan approvalFile: 30 little gibs approved plan Part2.pdf20 Oct 2023
Building plan approvalFile: 30 little gibs approved plan Part3.pdf20 Oct 2023

Keep 30 LITTLE GIBBS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALABAR

Builder: SILA MALABAR HILL REAL ESTATE LLP

SILA MALABAR HILL REAL ESTATE LLP has 1 registration on MahaRERA, including 30 LITTLE GIBBS. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if 30 LITTLE GIBBS is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 30 LITTLE GIBBS?

The registered promoter entity is SILA MALABAR HILL REAL ESTATE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 30 LITTLE GIBBS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 30 LITTLE GIBBS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 30 LITTLE GIBBS?

The professionals named in the filing: Architect: PANTHAKI ARCHITECTS; Architect: Design Group; Engineer: STERLING ENGINEERING CONSULTANTANCY SERVICE PVT LTD; Engineer: Suresh Appa Patil; Chartered Accountant: ANAND YADAV; Chartered Accountant: A.K. Yadav & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 30 LITTLE GIBBS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 30 LITTLE GIBBS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 30 LITTLE GIBBS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.