Home / Browse projects / Pune, Maharashtra / 27 Avenue

Registration lapsed No litigation declared Residential / Group Housing project

27 Avenue

By Eight Elements Realty LLP

RG-MH-82748 · RERA P52100047800 · Last updated on MahaRERA portal: 8 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
7 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

27 Avenue is a Residential / Group Housing project by Eight Elements Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100047800 on 28 Nov 2022. Possession was promised by 31 Dec 2024 and is now 22 months past that date. 5 of the 12 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • Name27 Avenue
  • TypeResidential / Group Housing
  • Location
    • Sector 27A
    • Plot No. 116 & 117 Akudi
    • Akurdi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411035
  • Pincode411035
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047800
  • ReraGenie IDRG-MH-82748

Builder

  • NameEight Elements Realty LLP
  • Entity typePartnership
  • PartnersPiyush Dahesh Jethani, Abhijit Haribhau Bhingirwar, Chandan Jumani, Vijay Jumani

Key dates

22 months past promisethis monthRegisteredNov 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Nov 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

42%5 of 12 units booked

Figures as on 8 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
27 AvenueNA6612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

27 Avenue: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area513 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025
LandownerVillageDistrict
Shyama CapitalPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad municipal corporation
Permissible FSI2685.51
Proposed, not sanctioned895 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWakad Branch

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shivaji Dange
EngineerAjay Bhilare
Chartered AccountantA N J K & Co LLP
Chartered AccountantREET MEGHRAJANI
Chartered AccountantReet Anand Megharajani
Chartered AccountantRavindra Birle
Chartered AccountantParag Savale
PartnerRole in project
Eight Elements Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Dec 2024

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: FORM 5 CA.pdf8 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 2023.pdf5 Jun 2025
Form 2A (FY 2022-2023)File: 2A 2022.pdf4 Jun 2025
Form 2A (FY 2024-2025)File: 2A 2024.pdf4 Jun 2025
Form 2A (FY 2023-2024)File: 2A 2023.pdf31 May 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf31 May 2025
Form 1File: Dec 2022 Form 1.pdf29 May 2025
Form 2File: Dec 2022 Form 2.pdf29 May 2025
Form 3File: Dec 2022 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY FY Dec 22.pdf29 May 2025
Form 1File: March 2023 Form 1.pdf29 May 2025
Form 2File: March 2023 Form 2.pdf29 May 2025
Form 3File: March 2023 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY FY MAR 23.pdf29 May 2025
Form 1File: Jun 2023 Form 1.pdf29 May 2025
Form 2File: Jun 2023 Form 2.pdf29 May 2025
Form 3File: Jun 2023 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY FY JUN 23.pdf29 May 2025
Form 1File: Sep 2023 Form 1.pdf29 May 2025
Form 2File: Sep 2023 Form 2.pdf29 May 2025
Form 3File: Sep 2023 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Sep 2023 Sold Unsold.pdf29 May 2025
Form 1File: Dec 2023 Form 1.pdf29 May 2025
Form 2File: Dec 2023 Form 2.pdf29 May 2025
Form 3File: Dec 2023 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY FY DEC 23.pdf29 May 2025
Form 1File: March 2024 Form 1.pdf29 May 2025
Form 2File: March 2024 Form 2.pdf29 May 2025
Form 3File: March 2024 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf29 May 2025
Form 1File: jun 2024 Form 1.pdf29 May 2025
Form 2File: Jun 2024 Form 2.pdf29 May 2025
Form 3File: Jun 2023 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold Unsold.pdf29 May 2025
Form 1File: Sep 2024 F1.pdf29 May 2025
Form 2File: Sep 2024 Form 2.pdf29 May 2025
Form 3File: Sep 2024 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold Unsold.pdf29 May 2025
Form 1File: Dec 2024 Form 1.pdf29 May 2025
Form 2File: Dec 2024 Form 2.pdf29 May 2025
Form 3File: Dec 2024 Form 3.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY FY DEC 24.pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2023.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2023.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 27 Avenue.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (5).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (6).pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate of 27 Avenue_compressed_compressed (1)_compressed (1)_compressed.pd4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Of 27 Avenue_.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 27 Avenue Engineer Certificate.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: 27 (Avenue) Disclosure form_sold unsold.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Annexcure C Form-2A (Site Supervisor's Certificate)_compressed_compressed.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate_(27 Avenue)_compressed_compressed_compressed.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate_(27 Avenue)_compressed_compressed_compressed.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Of 27Avenue.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (27 AVENUE).pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY(27 Avenue).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate (27 Avenue)_compressed (1)_compressed_compressed_compressed.pdf20 Jun 2024
Layout approvalFile: 27 Avenue Sanction Plan.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: 27 Avenue Sanction Plan.pdf9 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 05 ( 27 AVENUE)_0001.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EIGHT ELEMENTS REALTY FORM -3 CA CERTIFICATE (27 AVENUE)-compressed.pdf27 Mar 2024
Disclosure of sold/ booked inventoryFile: 27 AVENUE (SOLD UNSOLD)-compressed (2).pdf19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate of 27 avenue.pdf18 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 27 Avenue (from -2A).pdf18 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE (27 A).pdf13 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engg Certificate (27 Avenu)_0002.pdf29 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (27 avenue).pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Dec 2023
Disclosure of sold/ booked inventoryFile: 27 AVENUE (EIGHT ELEMENTS REALTY LLP)_0001.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 27 avenue sep f1 23.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 27 Avenue Qu october 23.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 27 AVENUE_0001.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate (Eight Elements Realty LLP)_0001.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Discolsure of sold booked Inventory Eight Elements.pdf12 Oct 2023
CERSAI detailsFile: Cersai Declaration.pdf9 Nov 2022

How this compares with Pune

42%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 27 Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akurdi13,700+ in Pune

2 km27 AvenueCompleted 25Lapsed / revoked 7Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: Eight Elements Realty LLP

Eight Elements Realty LLP has 1 registration on MahaRERA, including 27 Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that 27 Avenue shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 27 Avenue is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 27 Avenue?

The registered promoter entity is Eight Elements Realty LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 27 Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 27 Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 27 Avenue?

The professionals named in the filing: Architect: Sandeep Shivaji Dange; Engineer: Ajay Bhilare; Chartered Accountant: A N J K & Co LLP; Chartered Accountant: REET MEGHRAJANI; Chartered Accountant: Reet Anand Megharajani; Chartered Accountant: Ravindra Birle. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 27 Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 27 Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 27 Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.