Home / Browse projects / Pune, Maharashtra / 24 Wall Street

Registered No litigation declared Commercial project

24 Wall Street

By Geeta Prem Tilwani

RG-MH-18474 · RERA P52100077499 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 60%
46 of 73Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

24 Wall Street is a Commercial project by Geeta Prem Tilwani in Pune, Maharashtra, registered with MahaRERA as P52100077499 on 20 Aug 2024. Possession is promised by 30 Dec 2031. 27 of the 73 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • Name24 Wall Street
  • TypeCommercial
  • Location
    • Pimpri Gaon
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077499
  • ReraGenie IDRG-MH-18474

Builder

  • NameGeeta Prem Tilwani
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2024PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion30 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed118 files

Current status

37%27 of 73 units booked
36.8%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
24 Wall StreetNA121007373

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 60%.

24 Wall Street: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure13%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed120

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots120
Open Space120

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,058 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on13 Aug 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI41989.09
Proposed, not sanctioned9,348 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No.9,Jhamtani Impressions,Tapovan Mandir Road,Savta Mali Naga,Pimpri Colony,Pimpri-Chinchwad,Pimpri,Maharashtra-411017
Estimated costRs 166.18 cr
Cost incurredRs 61.12 cr
Work done36.78%
BuildingWingEstimatedIncurred
24 Wall StreetNARs 150.89 crRs 60.36 cr
-NARs 15.29 crRs 76.44 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
EngineerRohinee Badgujar
EngineerRohinee
EngineerRiyaz Akhtar
Chartered AccountantRavindra giri
Chartered AccountantVinod Chahan
PartnerRole in project
Geeta Prem Tilwani-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2031

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 24 Wall Street.pdf14 May 2026
Withdrawal Update Form 2File: SIGNED ENGG CERTIFICATE 2026.pdf14 May 2026
Withdrawal Update Form 3File: CA certificate Form 3.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 24 Wall Street.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 24 Wall Street.pdf20 Apr 2026
Withdrawal Update Form 3File: SIGNED CA CERTIFICATE (1).pdf20 Apr 2026
Withdrawal Update Form 1File: FINAL FORM 1.pdf11 Feb 2026
Withdrawal Update Form 1File: FINAL FORM 1.pdf11 Feb 2026
Withdrawal Update Form 2File: FINAL FORM 2.pdf11 Feb 2026
Withdrawal Update Form 2File: FINAL FORM 2.pdf11 Feb 2026
Withdrawal Update Form 3File: DEC CA CA FINAL .pdf11 Feb 2026
Withdrawal Update Form 3File: DEC CA CA FINAL .pdf11 Feb 2026
Building plan approvalFile: _2nd floor plan- 24 wall street.pdf14 Nov 2025
Building plan approvalFile: highlighted 2nd floor plan.pdf14 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A (14).pdf14 Nov 2025
Form 2A (FY 2025-2026)File: Form 2A (16) (1).pdf14 Nov 2025
Form 5 (FY 2024-2025)File: Annual Report on Statement of Account (1) (1).pdf14 Nov 2025
Withdrawal Update Form 1File: Form 1 Sep 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Form 2 Sep 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Form 3 Sep 2025 (2).pdf14 Oct 2025
Withdrawal Update Form 1File: ACE Scanner_2025_08_14 (1).pdf15 Aug 2025
Withdrawal Update Form 2File: 24 wall street (1) (1).pdf15 Aug 2025
Withdrawal Update Form 3File: 20250812023506 (2)_compressed.pdf15 Aug 2025
Layout approvalFile: 1 (9) (1).pdf13 Aug 2025
Building plan approvalFile: 2 (2).pdf13 Aug 2025
Building plan approvalFile: 3 (3).pdf13 Aug 2025
Building plan approvalFile: 4 (1).pdf13 Aug 2025
Building plan approvalFile: 5 (21).pdf13 Aug 2025
Building plan approvalFile: 6.pdf13 Aug 2025
Building plan approvalFile: 7.pdf13 Aug 2025
Building plan approvalFile: 8.pdf13 Aug 2025
Building plan approvalFile: 9.pdf13 Aug 2025
Building plan approvalFile: 10.pdf13 Aug 2025
Building plan approvalFile: 11 (1).pdf13 Aug 2025
Building plan approvalFile: 12 (1).pdf13 Aug 2025
Building plan approvalFile: 13.pdf13 Aug 2025
Building plan approvalFile: 14.pdf13 Aug 2025
Building plan approvalFile: 14.pdf13 Aug 2025
Building plan approvalFile: 15.pdf13 Aug 2025
Building plan approvalFile: 16.pdf13 Aug 2025
Form 1File: 23 July 2024 Form 1.pdf18 Jun 2025
Form 2File: 2 August 2024Form 2.pdf18 Jun 2025
Form 3File: 2 Aug 2024 Form 3.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: 30 November 2024 Sold Unsold.pdf18 Jun 2025
Self-declaration of Quarterly ProgressFile: July - Sepetember 2024 Declaration.pdf18 Jun 2025
Form 1File: 27 nov 2024 Form 1.pdf18 Jun 2025
Form 2File: 9 December 2024 Form 2.pdf18 Jun 2025
Form 3File: 9 Dec 2024 Form 3.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: 30 November 2024 Sold Unsold.pdf18 Jun 2025
Self-declaration of Quarterly ProgressFile: Octomber - December 2024 Declaration.pdf18 Jun 2025
Form 1File: 31 March 2025 Form 1.pdf15 Jun 2025
Form 2File: 7 April 2025 Form 2.pdf15 Jun 2025
Form 3File: 7 April 2024 Form 3.pdf15 Jun 2025
Disclosure of Sold and Booked InventoryFile: 31 Mar 2025 Sold Unsold.pdf15 Jun 2025
Self-declaration of Quarterly ProgressFile: January - March 2025 Declaration.pdf15 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20250416143032 (1)_compressed.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold (2).pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (17)_compressed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 (17)_compressed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wall Street F2.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wall Street F2 (1).pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20250203162500.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: 20241129175458.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20250203162429.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: sold unsold.pdf4 Feb 2025
Declaration about Commencement CertificateFile: Geeta Prem Tilwani.pdf12 Aug 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (2) (1).pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (10) (1)_11zon.pdf7 Aug 2024
Proforma of Allotment letterFile: allotment.pdf7 Aug 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT TO SALE-24 WALLSTREET-GEETA BUILDERS-07-08-2024.pdf7 Aug 2024
Layout approvalFile: Scan_1507-01.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-02.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-03.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-05.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-06.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-07.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-08.pdf6 Aug 2024
Building plan approvalFile: Scan_1507-09.pdf6 Aug 2024

How this compares with Pune

37%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 24 Wall Street on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Gaon13,700+ in Pune

2 km24 Wall StreetCompleted 44Lapsed / revoked 35Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 122 registered projects within 2 km.

Builder: Geeta Prem Tilwani

Geeta Prem Tilwani has 1 registration on MahaRERA, including 24 Wall Street. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 24 Wall Street is delayed beyond 30 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 24 Wall Street?

The registered promoter entity is Geeta Prem Tilwani, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 24 Wall Street?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 24 Wall Street?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 24 Wall Street?

The professionals named in the filing: Architect: Vikas Achalkar; Engineer: Rohinee Badgujar; Engineer: Rohinee; Engineer: Riyaz Akhtar; Chartered Accountant: Ravindra giri; Chartered Accountant: Vinod Chahan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 24 Wall Street?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 24 Wall Street. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 24 Wall Street to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.