Home / Browse projects / Pune, Maharashtra / 121 Paradise Phase I

Registered No litigation declared Others project

121 Paradise Phase I

By Wamanbhau & Daga Realtors LLP

RG-MH-05198 · RERA P52100055637 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
87 of 220Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

121 Paradise Phase I is a Others project by Wamanbhau & Daga Realtors LLP in Pune, Maharashtra, registered with MahaRERA as P52100055637 on 5 Apr 2024. Possession is promised by 31 Dec 2027. 133 of the 220 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • Name121 Paradise Phase I
  • TypeOthers
  • Location
    • Opp Rajwada Lance
    • Aabaji Nanekar Chouk
    • Rahatani
    • Pune
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • RERA no.P52100055637
  • ReraGenie IDRG-MH-05198

Builder

  • NameWamanbhau & Daga Realtors LLP
  • Entity typePartnership
  • PartnersRajendra Vishnu Khade, Sandeep Deepak Daga, Deepak Surjamal Daga, Deepak Kumar Sahani
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed121 files

Current status

60%133 of 220 units booked
39.7%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
121 Paradise Phase I Wing CNA20179022112
121 Paradise Phase I Wing DNA20169018108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

121 Paradise Phase I Wing C44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
121 Paradise Phase I Wing D45%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed211

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots211
Closed/Covered211
BuildingClosed/CoveredTotal
121 Paradise Phase I Wing C8181
121 Paradise Phase I Wing D130130

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,922 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025
LandownerVillageDistrict
M/s R.M AssociatesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI20419.52
Proposed, not sanctioned20,420 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD Grd And Mezz Floor Sr No 42 2 7 8 Dwarka Sai Society Godambe Chowk Rahatni Pirangut Ma
Estimated costRs 72.45 cr
Cost incurredRs 28.78 cr
Work done39.72%
BuildingWingEstimatedIncurred
121 Paradise Phase I Wing DNARs 32.73 crRs 18.75 cr
121 Paradise Phase I Wing CNARs 32.05 crRs 10.02 cr
-NARs 7.68 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUPA ASSOCIATES
EngineerAADI ASSOCIATES
Chartered AccountantCA Amogh Ghule
Chartered AccountantMRK and Company
Chartered AccountantL B Laddha and Company
PartnerRole in project
Wamanbhau & Daga Realtors LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1.pdf4 May 2026
Withdrawal Update Form 2File: Engineers Cirtificate 25-4-26.pdf4 May 2026
Withdrawal Update Form 3File: Form_3_new.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate P1 - 22-1-26.pdf4 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate P2 - 20-1-25.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 Phase 1_compressed.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1 Phase 1 - Oct 25.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2 Phase 1 Sept - converted.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 Phase 1 Sept - converted.pdf26 Nov 2025
Withdrawal Update Form 1File: Architect Certificate P1 - JUN.pdf25 Nov 2025
Withdrawal Update Form 2File: Engineers Certificate P1 - Jun.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 03 - Sep 25 - converted.pdf25 Nov 2025
Withdrawal Update Form 1File: Architect Certificate P1 - 22-7-25.pdf15 Nov 2025
Withdrawal Update Form 2File: Engineers Certificate P1 - 19-7-25.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3- Phase 1_compressed.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: FM_5_P52100055637.pdf9 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: img20250412_14130034.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner Apr 12, 2025 3-38 PM.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cirtificate P 1_compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: img20250412_14130034.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate- Dec 24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate P1- Dec 24.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate P1- Dec 24.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory Phase 1- Dec 24 - converted.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory_Sep 24 - converted.pdf5 Dec 2024
Building plan approvalFile: 1.pdf22 Oct 2024
Building plan approvalFile: 2.pdf22 Oct 2024
Building plan approvalFile: 3.pdf22 Oct 2024
Building plan approvalFile: 4.pdf22 Oct 2024
Building plan approvalFile: 5.pdf22 Oct 2024
Building plan approvalFile: 6.pdf22 Oct 2024
Building plan approvalFile: 7.pdf22 Oct 2024
Building plan approvalFile: 8.pdf22 Oct 2024
Building plan approvalFile: 9.pdf22 Oct 2024
Building plan approvalFile: 10.pdf22 Oct 2024
Building plan approvalFile: 11.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 24.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 24.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sep 24.pdf22 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: disclosure_page-0001 (12 files merged).pdf28 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 2 GF - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 3 Podium-1 - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 4 Podium-2 - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 5 Podium-3.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 6 FF.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 7_C Building - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 8_C Building - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 9_D Building - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 10_D Building - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 11_Mahada - converted.pdf24 Jun 2024
Building plan approvalFile: Building Plan_Sheet No 1 Layout Plan - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 1 Layout Plan - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 2 GF - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 3 Podium-1 - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 4 Podium-2 - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 5 Podium-3.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 6 FF.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 7_C Building - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 8_C Building - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 9_D Building - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 10_D Building - converted.pdf24 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No 11_Mahada - converted.pdf24 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - converted.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-121 Paradise-Phase-I_New.pdf3 Apr 2024

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 121 Paradise Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Aabaji Nanekar Chouk, Rahatani, Pune13,700+ in Pune

Builder: Wamanbhau & Daga Realtors LLP

Wamanbhau & Daga Realtors LLP has 2 registrations on MahaRERA, including 121 Paradise Phase I and 121 Paradise Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 121 Paradise Phase I is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 121 Paradise Phase I?

The registered promoter entity is Wamanbhau & Daga Realtors LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 121 Paradise Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 121 Paradise Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 121 Paradise Phase I?

The professionals named in the filing: Architect: SUPA ASSOCIATES; Engineer: AADI ASSOCIATES; Chartered Accountant: CA Amogh Ghule; Chartered Accountant: MRK and Company; Chartered Accountant: L B Laddha and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 121 Paradise Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 121 Paradise Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 121 Paradise Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.