Home / Browse projects / Mumbai Suburban, Maharashtra / Z-16 PHASE-I

Completed No litigation declared Residential / Group Housing project

Z-16 PHASE-I

By S. RAHEJA SAPPHIRE RESIDENCY LLP.

RG-MH-22811 · RERA P51800023799 · Last updated on MahaRERA portal: 22 Jan 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Z-16 PHASE-I is a Residential / Group Housing project by S. RAHEJA SAPPHIRE RESIDENCY LLP. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023799 on 6 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameZ-16 PHASE-I
  • TypeResidential / Group Housing
  • Location
    • 16TH ROAD
    • BANDRA WEST
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • RERA no.P51800023799
  • ReraGenie IDRG-MH-22811

Builder

  • NameS. RAHEJA SAPPHIRE RESIDENCY LLP.
  • Entity typeOthers
  • Named personsSHYAM RAHEJA, RAMKRISHNA S RAHEJA, KETAN R SHAH
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects9 →

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Z-16NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Z-16: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area585 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
ARVIND K SHAH-Jamnagar
RAJU HARJI GILANIAndheriMumbai Suburban
AMIN SUNDERJI GILANIAndheriMumbai Suburban
MUSTAFA SUNDERJI GILANIAndheriMumbai Suburban
AZIM SUNDERJI GILANIAndheriMumbai Suburban
MRS KHATIJA HARAKHJI GILANIAndheriMumbai Suburban

Approvals and building plan

Permissible FSI1910.53
Proposed, not sanctioned1,111 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI NAGAR MAHIM MUMBAI 400016

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYMS CONSULTANTS LIMITED
EngineerJ W CONSULTANT LLP
Chartered AccountantRAMA K GUPTA & CO
PartnerRole in project
S. RAHEJA SAPPHIRE RESIDENCY LLP.-

Litigation declared1

CaseCourtStatus
46/2016BOMBAY HIGH COURTFOR EXPARTE DECREE

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jan 2022

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf22 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Z-16 OC.pdf22 Jan 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Completion Certificate.pdf22 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf1 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf1 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf1 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form-2.pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate Form-2A.pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Form-2A.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep2021.pdf1 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf1 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf7 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2-A.pdf7 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2-A.pdf7 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf7 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert.pdf7 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf10 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no2.pdf10 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A.pdf10 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A.pdf10 Jun 2021
Disclosure of sold/ booked inventoryFile: S Raheja (2).pdf10 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf10 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf12 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf12 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf12 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 - March 2021.pdf15 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 - March2021-.pdf15 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A-March2021.pdf15 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: CC -Dec 2020.pdf8 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Z-16.pdf3 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Z-16_compressed.pdf23 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Z-16 Engineer Certificate.pdf23 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A- Z-16 Engineer Certificate.pdf23 Nov 2020
Proforma of Allotment letterFile: NEW DRAFT RERA Agreement.pdf18 Oct 2020
Layout approvalFile: IOD Plan.pdf31 Dec 2019
Building plan approvalFile: IOD Plan.pdf31 Dec 2019
PAN CardFile: S Raheja Sapphire Residency LLP - PAN CARD.pdf31 Dec 2019
Copy of the legal title reportFile: Title Certificate.pdf31 Dec 2019
Details of encumbrancesFile: No Encrumbances Certificate.pdf31 Dec 2019
Copy of Layout Approval (in case of layout)File: IOD Plan.pdf31 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: IOD Plan.pdf31 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 Dec 2019
Declaration in FORM BFile: FormBSRS.pdf31 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf31 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf31 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate 2A.pdf31 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf31 Dec 2019
Proforma of Allotment letterFile: S Raheja - Provisional Allottment Letter .pdf31 Dec 2019
Proforma of Allotment letterFile: RERA Agreement .pdf31 Dec 2019

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Z-1616TH BANDRA WEST MUMBAI 40005022CompletedJun 2024Dec 2021
HINDUJA HOSPITAL S-2HINDUJA HOSPITAL MAHIM WEST MUMBAI1CompletedDec 2018Dec 2018
SDS RAHEJA RESIDENCY21-31 DARIYA ASHRAM PANCHKOSHI ROAD PANDEYPUR ROAD VARANASI140CompletedMar 2018Mar 2018
SHREE POOJA-VIIMODEL TOWN SOCIETY GULMOHAR CROSS ROAD NO 7 JVPD VILE PARLE WEST MUMBAI6CompletedNov 2017Late, Feb 2018
SANTACRUZ SAPPHIRE CHSLPLOT NO 194 TPS IV JUNCTION OF EAST AVENUE AND MAIN AVENUE SANTCRUZ WEST MUMBAI 40005422CompletedApr 2017Late, Jul 2017
NATRAJMADHU PARK COOPERATIVE HOUSING SOCIETY LIMITED PLOT NO 260 11TH ROAD OPP MADHU PARK KHAR WEST MUMBAI 40005218CompletedOct 2016Aug 2016
GURUKRUPAKALINA NAPHANAGAR COOPERATIVE HOUSING SOCIETY LIMITED OPP CANARA BANK KALINA SANTACRUZ WEST MUMBAI 40005535CompletedOct 2016Oct 2016
HARI BHUVANKHAR PALI ROAD KHAR WEST MUMBAI9CompletedSep 2015Sep 2015
RAHEJA PRIMEVILLAGE TEMBHODE OPPOSITE THEMBHODE BUS STOP NEW SATPATI ROAD PALGHAR WEST48CompletedJan 2014Jan 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Z-16 PHASE-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDRA WEST6,700+ in Mumbai Suburban

Builder: S. RAHEJA SAPPHIRE RESIDENCY LLP.

S. RAHEJA SAPPHIRE RESIDENCY LLP. has 2 registrations on MahaRERA, including Z-16 PHASE-I and VERA BY S RAHEJA. Its filings disclose 9 earlier MahaRERA projects: declares 7 of 9 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Z-16 PHASE-I is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Z-16 PHASE-I?

The registered promoter entity is S. RAHEJA SAPPHIRE RESIDENCY LLP., an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Z-16 PHASE-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Z-16 PHASE-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Z-16 PHASE-I?

The professionals named in the filing: Architect: YMS CONSULTANTS LIMITED; Engineer: J W CONSULTANT LLP; Chartered Accountant: RAMA K GUPTA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Z-16 PHASE-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Z-16 PHASE-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Z-16 PHASE-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.