Home / Browse projects / Palghar, Maharashtra / YASHWANT COUNTY
YASHWANT COUNTY
RG-MH-76414 · RERA P99000047018 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHWANT COUNTY is a Residential / Group Housing project by SPACE HOMES (A.G.) in Palghar, Maharashtra, registered with MahaRERA as P99000047018 on 26 Sep 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 61 of the 192 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameYASHWANT COUNTY
- TypeResidential / Group Housing
- Location
- SANDOR
- VASAI
- Tarkhad
- Palghar
- 401201
- Pincode401201
- RERA no.P99000047018
- ReraGenie IDRG-MH-76414
Builder
- NameSPACE HOMES (A.G.)
- Entity typePartnership
- PartnersAMRISH HARISH PATIL, PRITAM VASANT VARTAK
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Sep 2022
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SKYLARK | NA | 22 | 20 | 175 | 17 | 192 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SKYLARK: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| AMEYA TOWNHOMES PVT LTD | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SKYLARK | NA | Rs 53.00 cr | Rs 41.00 cr |
| - | NA | Rs 2.00 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | EN CON |
| Engineer | SANJAY S NARANG NARANG |
| Engineer | Siddhesh M Gawde |
| Chartered Accountant | S M VAGADARGI & CO |
| Chartered Accountant | RAHIM RAJWANI |
| Chartered Accountant | JALPA RAITHATHA |
| Chartered Accountant | NAMRATA SHARMA |
| Partner | Role in project |
|---|---|
| SPACE HOMES (A.G.) | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs the promoter of YASHWANT COUNTY, (RERA Reg. No. P99000047018), we confirm that the project is currently 80% complete. Despite continuous efforts, completion of the remaining works has been delayed due to unforeseen delays in statutory approvals, prolonged supply-chain and material shortages, and temporary labour shortages which affected on-site progress. We request a one-year extension to complete the project and undertake to complete all remaining works within the revised period. Supporting documents (progress report, revised schedule, supplier communications and financial assurance) are a
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: SPACE HOMES AG Q1 FORM 1.pdf | 31 Jul 2026 |
| Withdrawal Update Form 2File: SPACE HOMES AG Q1 FROM2.pdf | 31 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 31 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A.pdf | 15 Jun 2026 |
| Form 5 (FY 2025-2026)File: FORM 5.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: FORM 3 final_11zon.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM 2.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 signed_compressed.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 signed_compressed.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 signed_compressed (1).pdf | 7 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Space Home.pdf | 11 Jul 2025 |
| Form 5 (FY 2022-2023)File: Form-5 2223.pdf | 11 Jul 2025 |
| Form 5 (FY 2023-2024)File: form-5 sign.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31-03-2025.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-03-2025.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-03-2025.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FFF_compressed.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (2).pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form-5 sign.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q-4.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 FY 24-25 Q-1.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q-4.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-1.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPTO FEB-24 SIGN.pdf | 27 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN-MAR23.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: APR-JUN23.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUL-SEP23.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT-DEC23.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT-DEC23.pdf | 24 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JAN-MAR.pdf | 24 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: APR-JUN.pdf | 24 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUL-SEP.pdf | 24 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OCT-DEC.pdf | 24 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A F Y 21-22.pdf | 21 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Adobe Scan 19 Dec 2023 (1).pdf | 20 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: space hom1_compressed.pdf | 4 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: space homes 01.pdf | 30 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED CC_compressed.pdf | 12 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE.pdf | 12 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 12 Aug 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf | 22 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3-03-02-2023_compressed.pdf | 3 Feb 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 2 Jan 2023 |
| Copy of the legal title reportFile: legal titel.pdf | 15 Sep 2022 |
| Other - LegalFile: AGREEMENT FOR SALE_RERA MODEL PDF.pdf | 12 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: PLINTH CERTIFICATE.pdf | 8 Sep 2022 |
| Layout approvalFile: RERA FILE.pdf | 30 Aug 2022 |
| Building plan approvalFile: RERA FILE.pdf | 30 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: LETTER OF Encumbrances.pdf | 30 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Letter of encumbrances to legal.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: RERA FILE.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: RERA FILE.pdf | 30 Aug 2022 |
| Declaration in FORM BFile: 2 Declaration in FORM B.pdf | 30 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 30 Aug 2022 |
| Proforma of Allotment letterFile: Allotment letter proforma_Final as per rera.pdf | 30 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT.pdf | 30 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf | 30 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3_merged_removed.pdf | 20 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration of CC.pdf | 19 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER AS PER FORMAT A.pdf | 19 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFIACTE_compressed.pdf | 18 Aug 2022 |
| PAN CardFile: SPACE HOME PAN CARD.pdf | 12 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_compressed (1).pdf | 12 Aug 2022 |
| Declaration in FORM BFile: FORM-B OWNERS_compressed.pdf | 12 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200245955494_For_Asset_Based_Search_30_08_2022_20_32_51_575 new.pdf | 12 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep YASHWANT COUNTY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VASAI3,200+ in Palghar
ARIANA
Mansarovar Estate Builders LLP
Sunteck Beach Residences 2
SUNTECK REAL ESTATES PRIVATE LIMITED
SHRIPAL SATTVA BLDG. 2
SHRIPAL SATTVA LLP
Sunteck Beach Residences 1
SUNTECK REAL ESTATES PRIVATE LIMITED
Sunteck Beach Residences 4
SUNTECK REAL ESTATES PRIVATE LIMITED
Milagrace Aura
Milagrace Developers
See every Palghar project, with the district possession charts
Builder: SPACE HOMES (A.G.)
SPACE HOMES (A.G.) has 1 registration on MahaRERA, including YASHWANT COUNTY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if YASHWANT COUNTY is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHWANT COUNTY?
The registered promoter entity is SPACE HOMES (A.G.), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHWANT COUNTY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASHWANT COUNTY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHWANT COUNTY?
The professionals named in the filing: Architect: EN CON; Engineer: SANJAY S NARANG NARANG; Engineer: Siddhesh M Gawde; Chartered Accountant: S M VAGADARGI & CO; Chartered Accountant: RAHIM RAJWANI; Chartered Accountant: JALPA RAITHATHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHWANT COUNTY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback