Home / Browse projects / Aurangabad, Maharashtra / YASHRAJ RESIDENCY
YASHRAJ RESIDENCY
By Nandkishor Vitthalrao Sahare
RG-MH-21861 · RERA P51500050919 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHRAJ RESIDENCY is a Residential / Group Housing project by Nandkishor Vitthalrao Sahare in Aurangabad, Maharashtra, registered with MahaRERA as P51500050919 on 15 May 2023. Possession is promised by 31 Mar 2027.
At a glance
Project
- NameYASHRAJ RESIDENCY
- TypeResidential / Group Housing
- Location
- SURVEY NO 14 3
- Sillod (M Cl)
- Sillod
- Aurangabad
- 431112
- Pincode431112
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500050919
- ReraGenie IDRG-MH-21861
Builder
- NameNandkishor Vitthalrao Sahare
- Entity typeIndividual
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 May 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed53 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| YASHRAJ RESIDENCY | NA | 5 | 5 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
YASHRAJ RESIDENCY: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mirkute Architects and Inerior Designers |
| Engineer | Mirkute Architects and Interior Desgners |
| Chartered Accountant | Bangad and Parjane Co |
| Partner | Role in project |
|---|---|
| Nandkishor Vitthalrao Sahare | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 1 Form-1 March 25.pdf | 23 Jun 2026 |
| Form 2File: 2 Form-2 March 25.pdf | 23 Jun 2026 |
| Form 3File: 3 Form-3 March 25.pdf | 23 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold Mar 25.pdf | 23 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 March 24.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form-1 June 24.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form-1 Sep 24.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form-1 Dec 24.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form-3 March 24.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form-3 June 24.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form-3 Sep 24.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form-3 Dec 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form-2 March 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form-2 June 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form-2 Sep 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form-2 Dec 24.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 23-24.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Jun-23.pdf | 4 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 Sep-23.pdf | 4 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 Dec-23.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Jun-23.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 Sep-23.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 Dec-23.pdf | 4 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 12 Sold Jun-23.pdf | 4 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 13 Sold Sep-23.pdf | 4 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 14 Sold Dec-23.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form-3 Jun-23.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form-3 Sep-23.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 Form-3 Dec-23.pdf | 4 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Projects.pdf | 9 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Yashraj Residency Format-A.pdf | 27 Apr 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200267030186_For_Asset_Based_Search_26_04_2023_13_46_11_150.pdf | 26 Apr 2023 |
| CERSAI detailsFile: Yashraj Residency - CERSAI Declaration.pdf | 26 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Updated.pdf | 26 Apr 2023 |
| Proforma of Agreement for saleFile: ATS Draft RERA.pdf | 26 Apr 2023 |
| Layout approvalFile: 14 3 sillod sanction plan_compressed.pdf | 20 Apr 2023 |
| Building plan approvalFile: 14 3 sillod sanction plan_compressed.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: NI FIN.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: NO LEgal.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to LegalFile: NI FIN.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to LegalFile: NO LEgal.pdf | 20 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 14 3 sillod sanction plan_compressed.pdf | 20 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 14 3 sillod sanction plan_compressed.pdf | 20 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: sanction letter 14_3 yashraj residency_compressed.pdf | 20 Apr 2023 |
| Proforma of Allotment letterFile: Modal Form Of Allotment Letter.pdf | 20 Apr 2023 |
| PAN CardFile: N V SAHARE pan.pdf | 11 Apr 2023 |
| Copy of the legal title reportFile: Legal Report.pdf | 11 Apr 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 11 Apr 2023 |
| Declaration in FORM BFile: Form B.pdf | 11 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allot Letter.pdf | 11 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agree to Sale.pdf | 11 Apr 2023 |
| Other - LegalFile: NO ENC - LEGAL.pdf | 11 Apr 2023 |
| Other - FinanceFile: NO ENC - FIN.pdf | 11 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep YASHRAJ RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SURVEY NO 14 31,400+ in Aurangabad
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
AYODHYA NAGAR PHASE - 1
RADHAKISHAN NAMDEO ZALWAR
Shri. Chhatrapati Shivaji Nagar
Sagar Damodhar Jadhav
AYODHYA NAGAR PHASE - 2
BHAGWANTI JAGDISH MOTWANI
SAHARE PARK MANEWADI
Nandkishor Vitthalrao Sahare
RAMA PARK
DATTATRAYA RAMBHAU BAWASKAR
Rama Park
DATTATRAYA RAMBHAU BAWASKAR
See every Aurangabad project, with the district possession charts
Builder: Nandkishor Vitthalrao Sahare
Nandkishor Vitthalrao Sahare has 2 registrations on MahaRERA, including SAHARE PARK MANEWADI and YASHRAJ RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if YASHRAJ RESIDENCY is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHRAJ RESIDENCY?
The registered promoter entity is Nandkishor Vitthalrao Sahare, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHRAJ RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASHRAJ RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHRAJ RESIDENCY?
The professionals named in the filing: Architect: Mirkute Architects and Inerior Designers; Engineer: Mirkute Architects and Interior Desgners; Chartered Accountant: Bangad and Parjane Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHRAJ RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback