Home / Browse projects / Pune, Maharashtra / YASHASWIN PARK
YASHASWIN PARK
RG-MH-22545 · RERA P52100031594 · Last updated on MahaRERA portal: 12 Apr 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHASWIN PARK is a Residential / Group Housing project by SAISAMARTH ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100031594 on 31 Oct 2021. Possession was promised by 18 Oct 2025 and is now 12 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameYASHASWIN PARK
- TypeResidential / Group Housing
- Location
- SHIVANE
- Shivane (Uttamnagr)
- Haveli
- Pune
- 411023
- Pincode411023
- RERA no.P52100031594
- ReraGenie IDRG-MH-22545
Builder
- NameSAISAMARTH ASSOCIATES
- Entity typePartnership
- PartnersSHRIRANG SHANKAR KHIRID, KAILAS ASHOK KURHADE, AMAR DATTATRAY DUDHANE, VASANT VILAS LOLE, TUSHAR SADASHIV KHIRID, SANDEEP RAMESH RAWAL, POOJA SHAILESH CHAVAN
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Oct 2021
- Promised completion18 Oct 2025
- Revised completionNone
- Buildings1 building record
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| YASHASWIN PARK | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
YASHASWIN PARK: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 12 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| TERRACE GARDEN | Yes | 0% |
Parking filed34
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership27
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Balkrushna Kondiba Deshmukh | Shivane (Uttamnagr) | Pune |
| Vishal Balkrushna Deshmukh | Shivane (Uttamnagr) | Pune |
| PUNAM VISHAL DESHMUKH | Shivane (Uttamnagr) | Pune |
| VEDA VISHAL DESHMUKH THROUGH VISHAL B DESHMUKH | Shivane (Uttamnagr) | Pune |
| KAVYA VISHAL DESHMUKH THROUGH VISHAL B DESHMUKH | Shivane (Uttamnagr) | Pune |
| VARAD VISHAL DESHMUKH THROUGH VISHAL B DESHMUKH | Shivane (Uttamnagr) | Pune |
| SHRI KIRAN BALKRUSHNA DESHMUKH | Shivane (Uttamnagr) | Pune |
| RUPALI KIRAN DESHMUKH | Shivane (Uttamnagr) | Pune |
| PRATHAM KIRAN DESHMUKH THROUGH KIRAN B DESHMUKH | Shivane (Uttamnagr) | Pune |
| RUDRA KIRAN DESHMUKH THROUGH KIRAN B DESHMUKH | Shivane (Uttamnagr) | Pune |
| SEEMA SANTOSH PAWAR | Ambegaon | Pune |
| PUNAM RAHUL DHAMALE | Wadgaon Bk | Pune |
| BABASAHEB BHAUSAHEB DESHMUKH | Shivane (Uttamnagr) | Pune |
| UJJWALA BABASAHEB DESHMUKH | Shivane (Uttamnagr) | Pune |
| MAYURESH BABASAHEB DESHMUKH | Shivane (Uttamnagr) | Pune |
| SHUBHANGI NITIN PAWAR | Mumbai City | Mumbai City |
| UMESH BHAUSAHEB DESHMUKH | Shivane (Uttamnagr) | Pune |
| SANGITA UMESH DESHMUKH | Shivane (Uttamnagr) | Pune |
| SHUBHAM UMESH DESHMUKH | Shivane (Uttamnagr) | Pune |
| ROSHAN UMESH DESHMUKH | Shivane (Uttamnagr) | Pune |
| MANGESH BHAUSAHEB DESHMUKH | Shivane (Uttamnagr) | Pune |
| VAISHALI MANGESH DESHMUKH | Shivane (Uttamnagr) | Pune |
| PRANITA MANGESH DESHMUKH THROUGH MANGESH DESHMUKH | Shivane (Uttamnagr) | Pune |
| PRANAV MANGESH DESHMUKH THROUGH MANGESH DESHMUKH | Shivane (Uttamnagr) | Pune |
| SHASHIKALA SOPAAN KAMTHE | Pune (M Corp.) | Pune |
| MAHESH SOPAAN KAMTHE | Pune (M Corp.) | Pune |
| VRUSHALI SUNIL JAGTAP | Shivane (Uttamnagr) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJENDRA H THITE |
| Engineer | PRAVIN MORE |
| Chartered Accountant | CA Dinesh Sudam Kudale |
| Partner | Role in project |
|---|---|
| SAISAMARTH ASSOCIATES | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000471252 | KIRAN BALKRISHNA DESHMUKH | Saisamarth Associates, a partnership firm through its partners Mr. Shrirang Khirid,Mr. Tushar Khirid | 10/07/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 date 01-01-2024_compressed.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 date 02-04-2024_compressed.pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shourya Construction 01-04-2024_compressed.pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold - booked inventory 01-04-2024_compressed.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 30-09-2023_compressed.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30-09-2023_compressed.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - 14-10-23_compressed.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30-06-2023.pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certifixate 30-06-2023_compressed.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30-06-2023.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30-06-2023.pdf | 8 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf | 8 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold 30-06-2023.pdf | 8 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA FORM 5 Annual Report 2022-23.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 dt 31-03-2023.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 31-03-2022.pdf | 3 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 31-03-2023.pdf | 3 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory (1).pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - 31-03-2022.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - 30-06-2022.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - 30-09-2022.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - 31-12-2022.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate-31-03-2023.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_form 3 SAI SAMARTH ASSOCIATES JUNE_2022.pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_form 3 SAI SAMARTH ASSOCIATES SEP-2022.pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_form 3 SAI SAMARTH ASSOCIATES DEC-2022.pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_form 3 SAI SAMARTH ASSOCIATES March_23.pdf | 27 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31-03-2023.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 12 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report Form 5 FY 2021-2022.pdf | 8 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate 09-03-2022.pdf | 29 Mar 2023 |
| Layout approvalFile: Revised Plan 02.pdf | 28 Mar 2023 |
| Layout approvalFile: Revised Plan 03.pdf | 28 Mar 2023 |
| Building plan approvalFile: Revised Plan 02.pdf | 28 Mar 2023 |
| Building plan approvalFile: Revised Plan 03.pdf | 28 Mar 2023 |
| Layout approvalFile: Revised Plan 01.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Revised Plan 01.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Revised Plan 02.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Revised Plan 03.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 02.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 03.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 DT 31-03-2022.pdf | 13 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate form 2 dt 30-06-2022.pdf | 13 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 dt 30-09-2022.pdf | 13 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 dt 31-12-2022.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march.pdf | 3 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june.pdf | 3 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept.pdf | 3 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dec .pdf | 3 Mar 2023 |
| Layout approvalFile: Sanction Plan_compressed.pdf | 19 Oct 2021 |
| Building plan approvalFile: Sanction Plan_compressed.pdf | 19 Oct 2021 |
| Layout approvalFile: PLAN PAGE2.pdf | 19 Oct 2021 |
| Layout approvalFile: PLAN PAGE2.pdf | 19 Oct 2021 |
| Building plan approvalFile: PLAN PAGE2.pdf | 19 Oct 2021 |
| Copy of the legal title reportFile: SEARCH REPORT WITH FORMAT A.pdf | 19 Oct 2021 |
| Details of encumbrancesFile: No Encumbrances Certificate-Declaration .pdf | 19 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan_compressed.pdf | 19 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN PAGE2.pdf | 19 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN PAGE2.pdf | 19 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan_compressed.pdf | 19 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN PAGE2.pdf | 19 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 19 Oct 2021 |
| Declaration about Commencement CertificateFile: Declaration about commencement certification .pdf | 19 Oct 2021 |
| Declaration in FORM BFile: Affidavit cum Declaration Form B_compressed.pdf | 19 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 19 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate _compressed.pdf | 19 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant's Certificate _compressed.pdf | 19 Oct 2021 |
| Proforma of Allotment letterFile: Letter of possession .pdf | 19 Oct 2021 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FINAL Model - RERA- 2020-1-20-1-10.pdf | 19 Oct 2021 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FINAL Model - RERA- 2020-1-20-11-20.pdf | 19 Oct 2021 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FINAL Model - RERA- 2020-21- 21-30.pdf | 19 Oct 2021 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FINAL Model - RERA- 2020-21-31-40.pdf | 19 Oct 2021 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FINAL Model - RERA- 2020-41-55.pdf | 19 Oct 2021 |
| PAN CardFile: FIRM PAN-5.pdf | 18 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep YASHASWIN PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVANE13,700+ in Pune
Mont Vert Kingstown Sector 1 Residential Wings
Niraj Kumar Associates Pvt Ltd
RANJAI
Shinde & Patil Construction
SAI NISARG
SHRI SAI SHRADDHA DEVELOPERS
ANSHRAJ ICON
VIJAY DEVELOPERS
Belview
Tranquil Infratech LLP
Audumbar Nest A1 A2 and B Building
Om Chidanand Developers
Builder: SAISAMARTH ASSOCIATES
SAISAMARTH ASSOCIATES has 1 registration on MahaRERA, including YASHASWIN PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that YASHASWIN PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if YASHASWIN PARK is delayed beyond 18 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHASWIN PARK?
The registered promoter entity is SAISAMARTH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHASWIN PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against YASHASWIN PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for YASHASWIN PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHASWIN PARK?
The professionals named in the filing: Architect: RAJENDRA H THITE; Engineer: PRAVIN MORE; Chartered Accountant: CA Dinesh Sudam Kudale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHASWIN PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback