YASHADA SUPREME

By YASHADA HOLDINGS

RG-MH-22737 · RERA P52100032394 · Last updated on MahaRERA portal: 13 Feb 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
110 of 110Construction stages doneacross 10 buildings; every applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 348 documents Report an error

YASHADA SUPREME is a Others project by YASHADA HOLDINGS in Pune, Maharashtra, registered with MahaRERA as P52100032394 on 4 Jan 2022. Possession is promised by 31 Dec 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYASHADA SUPREME
  • TypeOthers
  • Location
    • GAT NO 96 AND 97 DUDULGAON
    • DUDULGAON
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032394
  • ReraGenie IDRG-MH-22737

Builder

  • NameYASHADA HOLDINGS
  • Entity typePartnership
  • PartnersVASANT KANDHU KATE, SURYAKANT TUKARAM JADHAV, GOVIND GOPILAL AGRAWAL, VIJAY KHANDU KATE
  • Other registrations3 more →

Key dates

this monthRegisteredJan 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jan 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings10 building records
  • Documents filed348 files

Current status

94.9%Work done, per cost certificate

Figures as on 13 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA150000
BUILDING BNA150000
BUILDING CNA150000
BUILDING DNA150000
BUILDING ENA150000
BUILDING FNA160000
BUILDING GNA160000
BUILDING HNA160000
BUILDING INA250000
BUILDING JNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 13 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

110 of 110 construction stages are filed complete across 10 buildings.

BUILDING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING H100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING I100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING J100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1078

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,078
Closed/Covered748
Open Space330
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A51556
BUILDING B1075112
BUILDING C10210112
BUILDING D74882
BUILDING E12614140
BUILDING F5252104
BUILDING G5252104
BUILDING H5252104
BUILDING I8888176
BUILDING J444488

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area23,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2025
LandownerVillageDistrict
DIGAMBER SITRAM VAHILEMoshiPune
SUVARNA CHANDRAKANT VAHILEMoshiPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNCIPLE CORPORATION
Permissible FSI120000.0
Proposed, not sanctioned46,000 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE SAUDAGAR
Estimated costRs 232.13 cr
Cost incurredRs 220.37 cr
Work done94.93%
BuildingWingEstimatedIncurred
BUILDING INARs 34.49 crRs 31.83 cr
-NARs 34.36 crRs 31.45 cr
BUILDING ENARs 22.11 crRs 22.18 cr
BUILDING JNARs 21.41 crRs 19.78 cr
BUILDING FNARs 20.92 crRs 19.38 cr
BUILDING BNARs 19.97 crRs 19.84 cr
BUILDING HNARs 18.72 crRs 17.35 cr
BUILDING CNARs 18.51 crRs 18.40 cr
BUILDING GNARs 18.26 crRs 16.91 cr
BUILDING ANARs 12.05 crRs 11.97 cr
BUILDING DNARs 11.34 crRs 11.27 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankalp Designers
EngineerHIRALAL BHASKAR SONAWANE
Chartered AccountantMGSP & Associates, Chartered Accountants
Chartered AccountantS.BAHETI AND ASSOCIATES
PartnerRole in project
YASHADA HOLDINGS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501649Pravin Manohar DhurdeYASHADA HOLDINGS21/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jan 2025

Documents filed348

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 348 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Supreme-Form 1 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 1File: Supreme-Form 1 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 1File: Supreme-Form 1 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 2File: Supreme-Form 2 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 2File: Supreme-Form 2 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 2File: Supreme-Form 2 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 3File: Supreme-Form 3 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 3File: Supreme-Form 3 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 3File: Supreme-Form 3 -Dec 2024.PDF13 Feb 2026
Withdrawal Update Form 1File: yashada supreme form 1 june 2024.PDF1 Oct 2025
Withdrawal Update Form 1File: Supreme-Form 1 -Dec 2024.PDF1 Oct 2025
Withdrawal Update Form 2File: Supreme-Form 2 -Dec 2024.PDF1 Oct 2025
Withdrawal Update Form 2File: Supreme-Form 2 -Dec 2024.PDF1 Oct 2025
Withdrawal Update Form 3File: FORM 3 YASHADA SUPREME UP TO march 2024.pdf1 Oct 2025
Withdrawal Update Form 3File: Supreme-Form 3 -Dec 2024.PDF1 Oct 2025
Other - TechnicalFile: YASHADA SUPREME FORM 4.PDF3 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: YASHADA SUPREME FORM 4.pdf28 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART COMPLETION CERTIFICATE PART.pdf27 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SUPREME FINAL COMPLETION 1.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Supreme-Form 1 -Dec 2024.PDF16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Supreme-Form 3 -Dec 2024.PDF16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Supreme-Form 2 -Dec 2024.PDF16 Jan 2025
Disclosure of sold/ booked inventoryFile: SUPREME SOLD UNSOLD DEC 2024 (2).pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Supreme.PDF29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yashada supreme form 3 SEPT 2024.PDF19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yashada supreme form2 SEPT 2024.PDF19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: yashada supreme Form 1 Sep 2024.PDF18 Oct 2024
Disclosure of sold/ booked inventoryFile: YASHADA SUPREME SEP SOLD UNSOLD.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: YASHADA SUPREME.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: yashada supreme form 1 june 2024.PDF31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: yashada supreme form 2 june 2024_31072024162341.PDF31 Jul 2024
Disclosure of sold/ booked inventoryFile: supreme_001_11zon - converted - converted (1).pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SUPREME FORM 2A MARCH 2024.PDF28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Yashada Supreme March 2024.PDF14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yashada Suprem Form 2 March 2024.PDF3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Yashada Supreme Form 2A march 2024.PDF3 May 2024
Disclosure of sold/ booked inventoryFile: SUPREME March 2024.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 YASHADA SUPREME UP TO march 2024.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 supreme sept 2023.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 supreme dec 2023.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 supreme dec 2023.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Y holdings DEC 2023.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Supreme Sept 2023.PDF5 Jan 2024
Disclosure of sold/ booked inventoryFile: YASHADA SUPREME SOLD UNSOLD.pdf5 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Y holdings form3 Sept 2023.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 YH Supreme 22-23.pdf25 Dec 2023
Details of encumbrances concerned to FinanceFile: Supreme Legal Encumbrance.pdf13 Sep 2023
Details of encumbrances concerned to LegalFile: Supreme Legal Encumbrance.pdf13 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Supreme Form 3.pdf13 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Supreme Account Decalaration.pdf13 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Yashada Supreme March 2023.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Yashada Supreme June 2023.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Yashada Supreme March 2023.PDF1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Yashada Supreme March 2023.pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A Yashada Supreme 22-23.PDF5 Jul 2023
Proforma of Allotment letterFile: Alotment letter supreme-2023.pdf7 Jun 2023
Deviation Report with respect to Allotment letterFile: RERA-Yashada Supreme Allotment letter.PDF7 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A 2021_merged.pdf17 May 2023
Disclosure of sold/ booked inventoryFile: SUPREME (1) (1) (1) (1).pdf17 May 2023
Deviation Report with respect to model copy of AgreementFile: RERA-Yashada Supreme Deviation Agreement.pdf17 May 2023
Proforma of Agreement for saleFile: Yashada Supreme Draft 2023.pdf5 Apr 2023
Building plan approvalFile: PLAN NO - 1.pdf21 Feb 2023
Building plan approvalFile: PLAN NO - 31.pdf21 Feb 2023
Building plan approvalFile: PLAN NO - 32.pdf21 Feb 2023
Building plan approvalFile: PLAN NO - 33.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 1.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 31.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 32.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 33.pdf21 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - YASHADA SUPREME - 2023.pdf21 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: PLAN NO - 29.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Signed.pdf10 Feb 2023
Layout approvalFile: LAYOUT PLAN - 01.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 02.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 03.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 04.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 05.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 06.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 07.pdf12 Sep 2022
Building plan approvalFile: PLAN NO - 08.pdf12 Sep 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHADA SUPREME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmYASHADA SUPREMECompleted 50Lapsed / revoked 25Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: YASHADA HOLDINGS

YASHADA HOLDINGS has 4 registrations on MahaRERA, including YASHADA SUPREME and NB EVO PLAZA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YASHADA SUPREME is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHADA SUPREME?

The registered promoter entity is YASHADA HOLDINGS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHADA SUPREME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against YASHADA SUPREME?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for YASHADA SUPREME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHADA SUPREME?

The professionals named in the filing: Architect: Sankalp Designers; Engineer: HIRALAL BHASKAR SONAWANE; Chartered Accountant: MGSP & Associates, Chartered Accountants; Chartered Accountant: S.BAHETI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHADA SUPREME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHADA SUPREME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHADA SUPREME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.