ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / Yarawa Residency

Registered No litigation declared Residential / Group Housing project

Yarawa Residency

By Yarawa Buildcon LLP

RG-MH-93459 · RERA PR1320002501084 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
2 of 9Construction stages donefurthest along: Stilt Floor, 50%
35 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

Yarawa Residency is a Residential / Group Housing project by Yarawa Buildcon LLP in Solapur, Maharashtra, registered with MahaRERA as PR1320002501084 on 1 Oct 2025. Possession is promised by 31 Mar 2029. 0 of the 35 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.

At a glance

Project

  • NameYarawa Residency
  • TypeResidential / Group Housing
  • Location
    • Survase Mitra Nagar
    • Majrewadi
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413003
  • Pincode413003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1320002501084
  • ReraGenie IDRG-MH-93459

Builder

  • NameYarawa Buildcon LLP
  • Entity typeLimited Liability Partnership
  • LLPINACK-1315
  • PartnersMohammed Waseem Ameer Hamza Motiwala, Mohammed Saad Mohammed Waseem Motiwala

Key dates

this monthRegisteredOct 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Oct 2025
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed18 files

Current status

0%0 of 35 units booked
36.1%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YARAWA RESIDENCYNA8735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

YARAWA RESIDENCY: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor50%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Stilt / Ground58

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area856 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Sep 2025

Approvals and building plan

Sanctioning authoritySolapur Municipal Corporation
Permissible FSI2738.96
Proposed, not sanctioned2,738 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAURABH APARTMENT, OPP. SAVASKAR NURSING HOME, 276/1, HOTGI ROAD , SOLAPUR , MAHARASHTRA , PIN 413003
Estimated costRs 7.20 cr
Cost incurredRs 2.60 cr
Work done36.11%
BuildingWingEstimatedIncurred
YARAWA RESIDENCYNARs 7.20 crRs 2.60 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTauhid Shaikh
EngineerVikrant Umesh Takbhate
Chartered AccountantHuzaifa S Sanawadwala
PartnerRole in project
Yarawa Buildcon LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (1).pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (1).pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (1).pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (1).pdf18 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 CA.pdf22 Jan 2026
Building plan approvalFile: PLAN.pdf8 Sep 2025
Declaration and undertaking (Annexure A)File: Declaration of Non Registration Building.pdf8 Sep 2025

How this compares with Solapur

0%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Yarawa Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majrewadi550+ in Solapur

2 kmYarawa ResidencyCompleted 16Lapsed / revoked 11Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Yarawa Buildcon LLP

Yarawa Buildcon LLP has 1 registration on MahaRERA, including Yarawa Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Yarawa Residency is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yarawa Residency?

The registered promoter entity is Yarawa Buildcon LLP, a limited liability partnership as per the filing. Its LLPIN ACK-1315 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yarawa Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yarawa Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yarawa Residency?

The professionals named in the filing: Architect: Tauhid Shaikh; Engineer: Vikrant Umesh Takbhate; Chartered Accountant: Huzaifa S Sanawadwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yarawa Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yarawa Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yarawa Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.