Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 28 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
86 of 187Construction stages doneacross 17 buildings; furthest along: Staircases, 99%
28Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Xrbia Warai / Neral - Ph 1 is a Others project by XRBIA WARAI DEVELOPERS PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000002828 on 4 Aug 2017. Possession was promised by 29 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing. 28 complaints are on record with the regulator.

At a glance

Project

  • NameXrbia Warai / Neral - Ph 1
  • TypeOthers
  • Location
    • Warai
    • varai t waredi
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000002828
  • ReraGenie IDRG-MH-20547

Builder

  • NameXRBIA WARAI DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations6 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

46 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Aug 2017
  • Promised completion29 Dec 2022
  • Revised completionRevised to 29 Dec 2022 (originally 30 Jun 2021)
  • Buildings17 building records
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA50000
A2NA50000
A5NA90000
A6NA90000
A7NA90000
A8NA90000
B1NA50000
B2NA50000
B3NA50000
C5NA50000
D1NA50000
D2NA50000
D3NA50000
D4NA50000
D5NA50000
D6NA50000
E2NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building17

As on 17 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

86 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Staircases, at 99%.

A181%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
A281%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
A577%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises86%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
A677%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises86%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
A777%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises81%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%
A877%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises81%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%
B179%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B280%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B380%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C572%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%
D154%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises53%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D279%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.81%
D370%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.51%
D458%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.58%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D560%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks81%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.56%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D678%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E263%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities21

As on 17 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes25%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes20%
Club HouseYes15%
Common Car Parking SpacesYes10%
GymnasiumYes0%
Kids Play AreaYes90%
Shuttle Bus ServiceNoNot applicable
Swimming PoolYes0%

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Open Space69
BuildingOpen SpaceTotal
A144
A244
A533
A622
A733
A822
B144
B244
B344
C544
D155
D255
D355
D455
D555
D655
E255

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,037 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI31350.0
Proposed, not sanctioned31,350 sq m
Buildings approved17
Buildings sanctioned17

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 , 2 Planitum Shree Chintamani CHS , Sector 14 , Plot 18 , Sanpada Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Gade
EngineerEpicons Consultants Pvt. Ltd
PartnerRole in project
XRBIA WARAI DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000009651Jun 2021 → Jun 2022

Reason as filed by the promoterConstruction activity couldn’t be carried out during year 2019 due to excessive rainfall in the project area. Also Reduced Labour and Material availability due to continued and intermittent lockdowns.

Complaints filed with MahaRERA28

Case no.ComplainantRespondentFiled
CC006000000209581DEVESH AJIT JOSHI & VANITA AJIT JOSHIXRBIA WARAI DEVELOPERS PVT. LTD31/12/2021
CC006000000056718SUCHITA ULHAS TAWADEXRBIA DEVELOPERS LTD24/10/2018
CC006000000056752MOHAMMED ISHAQUE SURVEM/S XRBIA DEVELOPERS LTD.29/10/2018
CC006000000056892SHABANA GULAMKADAR SHAIKHXRBIA DEVELOPERS LTD31/12/2018
CC006000000057649TANUJA SAMEER RAJEXRBIA DEVELOPERS LTD12/09/2019
CC006000000057443Pritam RunwalXrbia Warai Developers Pvt. Ltd.27/12/2018
CC006000000058069FAIYAZ HAMID BAGBANXrbia Warai Development Pvt Ltd14/02/2019
CC006000000078884deepti Prashant SonawaneXrbia Developers Limited14/04/2019
CC006000000079488Pooja Ajay PradhanXrbia Warai Developers Pvt. Ltd.27/05/2019
CC006000000120993Vinaya ShingreXrbia Warai Dev PVT LTD26/01/2020
CC006000000181970Vinay Prabhakar PawarKaran Rajivkumar Karnawat03/01/2020
CC006000000192158MR. PARKAR BASHIR AHMED DAWOODxrbia developers ltd22/01/2020
CC006000000192818Arvind RajadhyakshaXrbia Warai Developers Pvt Ltd09/03/2020
CC006000000193409Manisha ajit Kamblexrbia developers limited09/07/2020
CC006000000195976Sayed Mairaj Asad RazaXrbia Developers Ltd10/02/2021
CC006000000197267Asmita Vijay PalXRBIA WARAI DEVELOPERS PRIVATE LIMITED28/06/2021
CC006000000197339AJAY RAMJEET PALXRBIA WARAI DEVELOPERS PRIVATE LIMITED28/06/2021
CC006000000209870RESHMABEE MOHAMMED SAIFUDDIN SHAIKH NEE RESHMABEE SUHAIL PATANKAR RESHMABEE MOHAMMED SAFIUDDIN SHAIKXRBIA WARAI DEVELOPERS PVT LTD31/01/2022
CC006000000198732SHRIDHAR APPA BARKOLXRBIA WARAI DEVELOPERS PVT LTD19/10/2021
CC006000000199069Herain Gangadharan BelchedaXrbia Warai Developers Pvt Ltd06/12/2021
CC006000000199125VANDANA PAIM/S. Xrbia Wari Developers Pvt Ltd23/11/2021
CC006000000209544Vandana PaiXRBIA WARAI DEVELOPERS PVT LTD25/12/2021
CC006000000209572Vinodraj Bhaskarrao ThodetiXrbia Warai Developers Private Limited31/12/2021
CC006000000396694Ajay Keshav PatoleXRBIA WARAI Developers Pvt. Ltd.19/07/2023
CC006000000396791MAYA PRABHUXrbia Warai Development Private Limited26/07/2023
CC006000000397117PARMINDER KALIAXRBIA WARIA DEVELOPERS PVT LTD17/08/2023
CC006000000408454Sophina Rickson DiasM/s. Xrbia Warai Developers Pvt. Ltd.21/12/2023
CC12501173Mrs. Linda Ann Eustace DsouzaXRBIA WARAI DEVELOPERS PRIVATE LIMITED08/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: P1_Sold Declaration_300923.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Warai_Ph 1_2A_Q1_21-22.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Warai_Ph 1_2A_Q2_21-22.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Warai_Ph 1_2A_Q3_21-22.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Warai_Ph 1_2A_Q4_21-22.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Warai_Ph 1_2A_Q4_22-23_.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Warai_Ph 1_2A_Q3_22-23_.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Warai_Ph 1_2A_Q2_22-23.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Warai_Ph 1_2A_Q1_22-23.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_311221_.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_310322_.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_300922_.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_300622_.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_311222_.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_310323_.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: 1_300623_.pdf5 Sep 2023
Certificates of CA (Form 3)File: Warai Form 3_Ph 1_310323.pdf24 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Warai_Ph1_Arch_Qtr 4_22-23_.pdf23 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Warai_Form 2_Ph 1_310323_.pdf23 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Warai_Form 5_Ph 1_310323_.pdf23 Aug 2023
Certificates of CA (Form 3)File: Warai_Ph 1_31032018.pdf9 Jun 2023
Certificates of CA (Form 3)File: Form 3_Warai Ph 1.pdf9 Jun 2023
Certificates of CA (Form 3)File: Xrbia Warai Ph 1_Form 3_310320.pdf9 Jun 2023
Certificates of CA (Form 3)File: Form 3 Xrbia Warai Ph 1 (Signed).pdf9 Jun 2023
Certificates of CA (Form 3)File: Warai Form 3 PH-1.pdf9 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_311221.pdf23 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_310322.pdf23 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_300622.pdf23 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_300922.pdf23 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_311222.pdf23 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_311221.pdf23 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_310322.pdf23 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_300622.pdf23 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_300922.pdf23 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_311222.pdf23 Mar 2023
Disclosure of sold/ booked inventoryFile: Xrbia Warai_Ph1_Sold Unit Declaration_23032023.pdf23 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A_Declaration_Warai_Ph1_060223.pdf16 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A_Declaration_Warai_Ph1_060223.pdf16 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_Declaration_Warai_Ph1_060223.pdf16 Mar 2023
Disclosure of sold/ booked inventoryFile: Xrbia Warai_Ph1_Sold Unit Declaration_06022023.pdf16 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Warai_Ph1_Arch_Qtr 1_22-23.pdf9 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Warai_Ph1_Arch_Qtr 2_22-23.pdf9 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Warai_Ph1_Arch_Qtr 3_21-22.pdf9 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Warai_Ph1_Arch_Qtr 3_22-23.pdf9 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Warai_Ph1_Arch_Qtr 4_21-22.pdf9 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Warai_Ph1_Engg_Qtr 3_21-22.pdf9 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Warai_Ph1_Engg_Qtr 4_21-22.pdf9 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Warai_Ph1_Engg_Qtr 1_22-23.pdf9 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Warai_Ph1_Engg_Qtr 2_22-23.pdf9 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Warai_Ph1_Engg_Qtr 3_22-23.pdf9 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Warai Form 5_Ph 1.pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Xrbia Warai Ph 1-Form 5-310321.pdf25 Jan 2023
Proforma of Allotment letterFile: Xrbia Warai_Ph 1_Draft_.pdf25 Aug 2021
Declaration about Commencement CertificateFile: Warai_CC Declaration.pdf16 Aug 2021
Disclosure of sold/ booked inventoryFile: Xrbia Warai_Ph1_Sold Unit Declaration_090821.pdf16 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Warai_Form 5_Ph 1_31032020.pdf28 May 2021
Certificates of CA (Form 5)File: Form 5_Warai Ph 1.pdf30 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Warai Ph 1.pdf30 Dec 2019
Details of encumbrancesFile: Warai Ph 1 Declaration of SBI Encumbarance Release190918.pdf21 Nov 2019
Details of encumbrancesFile: Details of encumbrances - Phase 1.pdf27 Feb 2019
Certificates of CA (Form 5)File: Xrbia Warai_Form 5_Ph 1.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Xrbia_Warai_NA_Order.pdf26 Mar 2018
Building plan approvalFile: Xrbia_Warai_NA_Order.pdf27 Jul 2017
Layout approvalFile: Layout Plan Approval.pdf27 Jul 2017
Copy of the legal title reportFile: Title Part - 1.pdf27 Jul 2017
Copy of the legal title reportFile: Title Part - 2.pdf27 Jul 2017
Copy of the legal title reportFile: Title Part - 3.pdf27 Jul 2017
Details of encumbrancesFile: Encumbrance - Warai Ph 1.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan Approval.pdf27 Jul 2017
Building Plan Approval (IOD)File: Xrbia_Warai_NA_Order.pdf27 Jul 2017
Declaration in FORM BFile: Form B - Warai Ph 1.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arhitect Certificate - Warai Ph 1.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Warai Ph 1.pdf27 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - Warai Ph 1.pdf27 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale - Warai Ph 1 Final.pdf27 Jul 2017
OtherFile: Self Declaration - Warai Ph 1.pdf27 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 18 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Xrbia Warai / Neral - Ph 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Warai5,900+ in Raigarh

2 kmXrbia Warai / Neral - PhCompleted 3Lapsed / revoked 5Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: XRBIA WARAI DEVELOPERS PRIVATE LIMITED

XRBIA WARAI DEVELOPERS PRIVATE LIMITED has 7 registrations on MahaRERA, including Xrbia Warai / Neral - Ph 1 and Xrbia Warai / Neral - Ph 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that Xrbia Warai / Neral - Ph 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Xrbia Warai / Neral - Ph 1 is delayed beyond 29 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Xrbia Warai / Neral - Ph 1?

The registered promoter entity is XRBIA WARAI DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Xrbia Warai / Neral - Ph 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Xrbia Warai / Neral - Ph 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Xrbia Warai / Neral - Ph 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Xrbia Warai / Neral - Ph 1?

The professionals named in the filing: Architect: Ajay Gade; Engineer: Epicons Consultants Pvt. Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Xrbia Warai / Neral - Ph 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Xrbia Warai / Neral - Ph 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Xrbia Warai / Neral - Ph 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.