Completed No litigation declared Residential / Group Housing project

WESTBROOK

By Tara Constructions

RG-MH-11715 · RERA P52100003178 · Last updated on MahaRERA portal: 31 Jan 2024

Source: official MahaRERA filing

Red flags

  • 14 complaints at MahaRERA
  • Completion date moved by 44 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2024Possession promisedregistration recorded completed
13 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
14Complaints at MahaRERAon this registration
Jump to the 191 documents Report an error

WESTBROOK is a Residential / Group Housing project by Tara Constructions in Pune, Maharashtra, registered with MahaRERA as P52100003178 on 4 Aug 2017. The registration is recorded completed; possession was promised by 31 May 2024. The completion date has moved by 44 months from the original filing. 14 complaints are on record with the regulator.

At a glance

Project

  • NameWESTBROOK
  • TypeResidential / Group Housing
  • Location
    • NEW PUNE SATARA HIGHWAY
    • AMBEGAON
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003178
  • ReraGenie IDRG-MH-11715

Builder

  • NameTara Constructions
  • Entity typePartnership
  • PartnersNANDKISHOR SHRIKANT RATHI, DILIP PARESHWAR THAKUR
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toMay 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion31 May 2024
  • Revised completionRevised to 31 May 2024 (originally 30 Sep 2020)
  • Buildings2 building records
  • Documents filed191 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA140000
B BUILDINGNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 31 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

A BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A BUILDING11
B BUILDING11

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
PRAMOD VISHWANATH DODAKEPune (M Corp.)Pune
RAJENDRA BABAJI BIBAWEPune (M Corp.)Pune
BIDKAR INFRA PVT LTDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI8782.2
Proposed, not sanctioned8,761 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITY S NO 1081 S NO 18A/1A/1/1/1 KACHARE CLASSIC APARTMENT RANDWANE DIST PUNE MAHARASHTRA 411038

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWALHEKAR & ASSOCIATES
EngineerDELCON STRUCTURAL CONSULTANT
EngineerNehal Thakur
PartnerRole in project
Tara Constructions-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005659Sep 2020 → May 2021

Reason as filed by the promoterNA

EXT52100011576Sep 2020 → May 2023

Reason as filed by the promoterDUE TO COVID LABOUR IS TO MUCH SHORTAGE

EXT52100016558Sep 2020 → May 2024

Reason as filed by the promoterConstruction activity is completed and we are submitting the file to PMC for Completion Certificate. Further we require time for conveyance of the land and building.

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC005000000095778Aniket KhadilkarPramod Dodke15/07/2021
CC005000000106773Chetan Dilip KarampuriTara Construction16/03/2022
CC12502664Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502665Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502667Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502668Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502669Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502671Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502672Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502673Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12502674Tara ConstructionsPramod Vishhwanath Dodake31/07/2025
CC12503533TANAJI GHATGETara Constructions03/10/2025
CC12503552Vaibhav GaikwadTara Constructions06/10/2025
CC12600646Sachin Harishchandra ManeTara Constructions04/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Nov 2021

Documents filed191

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 191 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Westbrook - Form 4.pdf31 Jan 2024
Declaration in FORM BFile: Form B Affidavit 12072023.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Booked statement - A bldg.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: sold Booked statement - B bldg.pdf12 Jul 2023
Details of encumbrances concerned to FinanceFile: Legal encumbrance declaration.pdf30 Jun 2023
Details of encumbrances concerned to LegalFile: Legal encumbrance declaration.pdf30 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate.pdf30 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank account.pdf30 Jun 2023
Foreclosure of the ProjectFile: declaration about separate bank account.pdf30 Jun 2023
Deviation Report with respect to model copy of AgreementFile: deviation in agreement for sale.pdf30 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold - Booked - Commercial.pdf7 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory - A Bldg.pdf7 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory - B Bldg.pdf7 Jun 2023
Proforma of Agreement for saleFile: AGREEMENT DRAFT - AG.pdf19 Apr 2023
Deviation Report with respect to Allotment letterFile: AGREEMENT DRAFT - AG.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GetUserDocumentFileContent (1).pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GetUserDocumentFileContent.pdf18 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: WESTBROOK.pdf18 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: WESTBROOK.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENG CERTIFICATE.pdf16 Sep 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORIES.pdf16 Sep 2022
Certificates of CA (Form 5)File: FORM 5.pdf16 Sep 2022
OtherFile: Consent Latter-Format-C.pdf16 Sep 2022
Other - FinanceFile: Consent Latter-Format-C.pdf16 Sep 2022
Declaration about Commencement CertificateFile: Form D.pdf29 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENG CERTIFICATE.pdf29 Jun 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf29 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf29 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf29 Jun 2022
OtherFile: FINAL CONCENT.pdf29 Jun 2022
Other - TechnicalFile: Ambegaon - extension letter.pdf29 Jun 2022
Details of encumbrancesFile: DEED OF RE-COVEYANCE OF DENA BANK KOTHRUD BRANCH FOR AMBEGAOUN PROPERTY DT 11-9-2018.pdf25 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENG CERTIFICATE.pdf25 Jun 2022
Certificates of CA (Form 5)File: FORM 5.pdf25 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf25 Jun 2022
OtherFile: FINAL CONCENT.pdf25 Jun 2022
OtherFile: SOLD UNSOLD.pdf25 Jun 2022
CERSAI detailsFile: CERSAI_Search Result For All Assets1572599938551.pdf10 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complition.pdf2 Nov 2021
OtherFile: complition.pdf2 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE OF AMBEGAON SITE.pdf29 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AMBEGAON WESTBROOK ENGINEERS CERTIFICATE.pdf29 Jul 2019
Layout approvalFile: TOTAL LAY OUT PLAN 12.pdf13 Jul 2019
Building plan approvalFile: AMENITY BUILD AREA CALCULATION PLAN 10.pdf13 Jul 2019
Building plan approvalFile: AMENITY BUILD PLAN 9.pdf13 Jul 2019
Building plan approvalFile: AREA CALCULATION FLOOR PLAN 3.pdf13 Jul 2019
Building plan approvalFile: BASEMENTGROUND PARKING LAYOUT PLAN 1.pdf13 Jul 2019
Building plan approvalFile: ELEVATION PLAN 8.pdf13 Jul 2019
Building plan approvalFile: ELEVATION PLAN 11.pdf13 Jul 2019
Building plan approvalFile: FLOOR NO 8 A B BUILD 5.pdf13 Jul 2019
Building plan approvalFile: FLOOR NO 8 A B BUILD 5.pdf13 Jul 2019
Building plan approvalFile: FLOOR NO 13 14 A B BUILD 6.pdf13 Jul 2019
Building plan approvalFile: FLOOR PLAN.pdf13 Jul 2019
Building plan approvalFile: FLOOR PLAN7.pdf13 Jul 2019
Building plan approvalFile: GROUND MEZANINE FLOOR PLAN 2.pdf13 Jul 2019
Copy of Layout Approval (in case of layout)File: TOTAL LAY OUT PLAN 12.pdf13 Jul 2019
Building Plan Approval (IOD)File: AMENITY BUILD AREA CALCULATION PLAN 10.pdf13 Jul 2019
Building Plan Approval (IOD)File: AMENITY BUILD PLAN 9.pdf13 Jul 2019
Building Plan Approval (IOD)File: AREA CALCULATION FLOOR PLAN 3.pdf13 Jul 2019
Building Plan Approval (IOD)File: BASEMENTGROUND PARKING LAYOUT PLAN 1.pdf13 Jul 2019
Building Plan Approval (IOD)File: ELEVATION PLAN 8.pdf13 Jul 2019
Building Plan Approval (IOD)File: ELEVATION PLAN 11.pdf13 Jul 2019
Building Plan Approval (IOD)File: FLOOR NO 8 A B BUILD 5.pdf13 Jul 2019
Building Plan Approval (IOD)File: FLOOR NO 8 A B BUILD 5.pdf13 Jul 2019
Building Plan Approval (IOD)File: FLOOR NO 13 14 A B BUILD 6.pdf13 Jul 2019
Building Plan Approval (IOD)File: FLOOR PLAN.pdf13 Jul 2019
Building Plan Approval (IOD)File: FLOOR PLAN7.pdf13 Jul 2019
Building Plan Approval (IOD)File: GROUND MEZANINE FLOOR PLAN 2.pdf13 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: NEW COMMENCEMENT CERTIFICATE.pdf13 Jul 2019
Layout approvalFile: TOTAL LAY OUT PLAN 12.pdf28 Jun 2019
Building plan approvalFile: AMENITY BUILD AREA CALCULATION PLAN 10.pdf28 Jun 2019
Building plan approvalFile: AMENITY BUILD PLAN 9.pdf28 Jun 2019
Building plan approvalFile: AREA CALCULATION FLOOR PLAN 3.pdf28 Jun 2019
Building plan approvalFile: BASEMENTGROUND PARKING LAYOUT PLAN 1.pdf28 Jun 2019
Building plan approvalFile: ELEVATION PLAN 8.pdf28 Jun 2019
Building plan approvalFile: ELEVATION PLAN 11.pdf28 Jun 2019
Building plan approvalFile: FLOOR NO 8 A B BUILD 5.pdf28 Jun 2019
Building plan approvalFile: FLOOR NO 13 14 A B BUILD 6.pdf28 Jun 2019
Building plan approvalFile: FLOOR PLAN.pdf28 Jun 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 44 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WESTBROOK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON13,700+ in Pune

2 kmWESTBROOKCompleted 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: Tara Constructions

Tara Constructions has 3 registrations on MahaRERA, including 55 SUKHNIWAS and WESTBROOK. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WESTBROOK is delayed beyond 31 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WESTBROOK?

The registered promoter entity is Tara Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WESTBROOK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against WESTBROOK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for WESTBROOK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WESTBROOK?

The professionals named in the filing: Architect: WALHEKAR & ASSOCIATES; Engineer: DELCON STRUCTURAL CONSULTANT; Engineer: Nehal Thakur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WESTBROOK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WESTBROOK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WESTBROOK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.