Home / Browse projects / Mumbai Suburban, Maharashtra / West Shore

Registered No litigation declared Residential / Group Housing project

West Shore

By Diljay Realtors Private Limited

RG-MH-07293 · RERA P51800053995 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Podiums (if any), 35%
23 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

West Shore is a Residential / Group Housing project by Diljay Realtors Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053995 on 19 Dec 2023. Possession is promised by 30 Jun 2028. 14 of the 37 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameWest Shore
  • TypeResidential / Group Housing
  • Location
    • Kane Road
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • RERA no.P51800053995
  • ReraGenie IDRG-MH-07293

Builder

  • NameDiljay Realtors Private Limited
  • Entity typeCompany
  • DirectorPadhmabhan Srinivasan Iyer

Key dates

this monthRegisteredDec 2023PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Dec 2023
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

38%14 of 37 units booked
14.2%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
West ShoreNA482437037

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 35%.

West Shore: 21% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)35%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed215

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots215
Closed/Covered215

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,258 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Bandra Mayfair Premises Co operative Society LtdMumbai CityMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI12190.5
Proposed, not sanctioned12,190 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSandhurst Bldg, C S No 6/5/17, Opera House, SVP Road, Bridge, Chowpatty, Mumbai 400 007
Estimated costRs 195.02 cr
Cost incurredRs 27.74 cr
Work done14.22%
BuildingWingEstimatedIncurred
West ShoreNARs 159.92 crRs 27.74 cr
-NARs 35.10 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSamar
EngineerPronomina Engineers Private Limited
Chartered AccountantTMG & Associates
PartnerRole in project
Diljay Realtors Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Mayfair CC Dated.pdf8 Jul 2026
Layout approvalFile: Amended IOA plans For Sale Building compressed-1-6.pdf8 Jul 2026
Layout approvalFile: Amended IOA plans For Sale Building compressed-7-13_compressed_compressed-1-3.pdf8 Jul 2026
Layout approvalFile: Amended IOA plans For Sale Building compressed-7-13_compressed_compressed-4-7.pdf8 Jul 2026
Withdrawal Update Form 1File: Architect Certificate 31st March 2026.pdf8 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate 31st March 2026.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 2023.pdf8 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (2).pdf7 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (2).pdf7 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (2).pdf7 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (2).pdf7 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate 31 Dec West Shore 2024.pdf7 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate 31 Dec West Shore 2024.pdf7 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate 31 Dec West Shore 2024.pdf7 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate 31 Dec West Shore 2024.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 2023.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 2023.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 2023.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 2023.pdf7 Jul 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Mayfair 31 12 2024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 24.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 Dec West Shore.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Diljay Real west Shore Sales Certificate.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mayfir 31 Mar.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mayfair 30 Sep.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mayfair 30 June.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Mayfair 31 Mar.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Mayfair 30 June.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Mayfair 30 Sep.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24 compressed (1).pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24 compressed (2).pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP 24.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31st March 2024.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30th June 2024.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30th September 2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: West Shore Sales Certificate 31st March 2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: West Shore Sales Certificate 30th June 2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: West Shore Sales Certificate 30th September 2024.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: IOM ASK Mayfair.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: IOM ASK Mayfair.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Avijit dated Declaration.pdf18 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DRT Sir dated Declaration.pdf18 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Srini Sir dated Declaration.pdf18 Dec 2023
Proforma of Allotment letterFile: Allotment letter annexure A.pdf18 Dec 2023
Proforma of Agreement for saleFile: Revised AFS DRAFT - MAYFAIR final upload.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf16 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer December 2023.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA December 2023.pdf16 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account declaration.pdf15 Dec 2023
Layout approvalFile: MYSCAN pg 1.pdf14 Dec 2023
Building plan approvalFile: MYSCAN Pg 2.pdf14 Dec 2023
Building plan approvalFile: MYSCAN pg 3.pdf14 Dec 2023
Building plan approvalFile: MYSCAN Pg 4.pdf14 Dec 2023
Building plan approvalFile: MYSCAN Pg 5.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 6.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 7.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 8.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 9.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 10.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 11.pdf14 Dec 2023
Building plan approvalFile: MYSCAN 12.pdf14 Dec 2023
Building plan approvalFile: Concession plan upload RERA final.pdf14 Dec 2023
Details of encumbrances concerned to FinanceFile: Finance encumbrance.pdf14 Dec 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance (3).pdf14 Dec 2023
Details of encumbrances concerned to LegalFile: Finance encumbrance.pdf14 Dec 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance (3).pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: MYSCAN pg 1.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN Pg 2.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN pg 3.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN Pg 4.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN Pg 5.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 6.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 7.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 8.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 9.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 10.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 11.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN 12.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Concession plan upload RERA final.pdf14 Dec 2023
Declaration about Commencement CertificateFile: CC declaration final upload.pdf14 Dec 2023

How this compares with Mumbai Suburban

38%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep West Shore on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra6,700+ in Mumbai Suburban

Builder: Diljay Realtors Private Limited

Diljay Realtors Private Limited has 1 registration on MahaRERA, including West Shore. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if West Shore is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of West Shore?

The registered promoter entity is Diljay Realtors Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in West Shore?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for West Shore?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at West Shore?

The professionals named in the filing: Architect: Samar; Engineer: Pronomina Engineers Private Limited; Chartered Accountant: TMG & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in West Shore?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About West Shore. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save West Shore to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.