Home / Browse projects / Raigarh, Maharashtra / Wellwisher Tulip

Registered No litigation declared Residential / Group Housing project

Wellwisher Tulip

By Abhijeet Chandrakant Bhansali

RG-MH-04212 · RERA P52000021345 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 37 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 37 months from the original
15 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Wellwisher Tulip is a Residential / Group Housing project by Abhijeet Chandrakant Bhansali in Raigarh, Maharashtra, registered with MahaRERA as P52000021345 on 24 Jun 2019. Possession is promised by 30 Sep 2027. The completion date has moved by 37 months from the original filing.

At a glance

Project

  • NameWellwisher Tulip
  • TypeResidential / Group Housing
  • Location
    • Vangani Pashane Road
    • Plot no 136/1/12
    • Pashane
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000021345
  • ReraGenie IDRG-MH-04212

Builder

  • NameAbhijeet Chandrakant Bhansali
  • Entity typeIndividual
  • GSTIN27AETPB4825M2Z0
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2019First promiseAug 2024Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jun 2019
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 23 Aug 2024)
  • Buildings2 building records
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA50000
Building No 2NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

Building No 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 271%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,425 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCollector Raigad Alibaug
Permissible FSI3691.41
Proposed, not sanctioned3,150 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAngruti Plot No 14 sector 24 Turbhe Vashi Navi Mumbai 400705

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHARAT BALCHAND BATHIYA
EngineerSamarth Agarwal
Chartered AccountantBHUSHAN CHHAJED
Chartered AccountantHansaria Shah S and Associates
PartnerRole in project
Abhijeet Chandrakant Bhansali-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024903Aug 2024 → Sep 2027

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 30/09/2027 to complete the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Wellwisher Tulip 31-03-2026_compressed_compressed.pdf20 Apr 2026
Form 2File: Tulip Form 2 - Mar 26.pdf20 Apr 2026
Form 3File: Form 3-WT-Q4-March 2026_signed.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Tulip - sold unsold 31-03-2026.pdf20 Apr 2026
Form 1File: TULIP - DEC 25- FORM1.pdf16 Jan 2026
Form 2File: Form 2.pdf16 Jan 2026
Form 3File: Form 3.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold - unsold - tulip.pdf16 Jan 2026
Form 1File: architect - Tulip.pdf16 Oct 2025
Form 2File: Tulip engineer.pdf16 Oct 2025
Form 3File: Form 3-Tulip.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Tulip sold unsold.pdf16 Oct 2025
Declaration in FORM BFile: new form b.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032023.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092023.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122023.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032024.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062024.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092024.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122024.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032025.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062025.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30122024.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30062025.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30032025.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30032025.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30092024.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30032024.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30122023.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30092023.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30062023.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30032023.pdf18 Jul 2025
Certificates of CA (Form 3)File: 30062024.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032024.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062025.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032025.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122024.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092024.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062024.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122023.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092023.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062023.pdf18 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032023.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mar 21.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Tulip_page-0001.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 22.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Mar 23.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Mar 24.pdf18 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Annual-WT-F Y 2022-23.pdf23 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Annual-WT-F Y 2023-24.pdf23 May 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf4 Nov 2024
Declaration in FORM BFile: Form B.pdf4 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wellwisher Tulips --- EC 27-09-24.pdf4 Nov 2024
Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf4 Nov 2024
CERSAI detailsFile: CERSAI.pdf4 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Separate bank account for real estate projects.pdf4 Nov 2024
Deviation Report with respect to Allotment letterFile: derivation Allotment.pdf4 Nov 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf4 Nov 2024
Proforma of Agreement for saleFile: Pashane agreement - Bank Loan draft final.pdf4 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure of Interest of Other real estate.pdf4 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-PLOT 12 EC 30-12-22.pdf3 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Plot no 12 , Vangani Rera Certificate_compressed.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA Annual-WT-F Y 2018-19-Sign.pdf16 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Annual-WT-F Y 2019-20-Sign.pdf16 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Annual-WT-F Y 2020-21-Sign.pdf16 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Annual-WT-F Y 2021-22-Sign.pdf16 Dec 2022
Certificates of CA (Form 3)File: Certificate_Tulip_31032021_Signed.pdf19 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf9 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf9 Nov 2019
Certificates of CA (Form 3)File: CA Certificate.pdf9 Nov 2019
Building plan approvalFile: Building Plan Plot No 12-1.PDF14 Jun 2019
Building plan approvalFile: Building Plan Plot No 12-2.PDF14 Jun 2019
Layout approvalFile: Layout Plan-Plot No 12.PDF14 Jun 2019
PAN CardFile: Abhijit sir pan card.pdf14 Jun 2019
Copy of the legal title reportFile: Tile Search Report Plot No 12-1-19.pdf14 Jun 2019
Copy of the legal title reportFile: Tile Search Report Plot No 12-19-20.pdf14 Jun 2019
Copy of the legal title reportFile: Tile Search Report Plot No 12-39-76.pdf14 Jun 2019
Details of encumbrancesFile: encumbrance clarance.pdf14 Jun 2019
Copy of Layout Approval (in case of layout)File: Layout Plan-Plot No 12.PDF14 Jun 2019
Building Plan Approval (IOD)File: Building Plan Plot No 12-1.PDF14 Jun 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 37 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wellwisher Tulip on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Plot no 136/1/125,900+ in Raigarh

2 kmWellwisher TulipCompleted 8Lapsed / revoked 14Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Abhijeet Chandrakant Bhansali

Abhijeet Chandrakant Bhansali has 2 registrations on MahaRERA, including Wellwisher Sunflower and Wellwisher Tulip. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Wellwisher Tulip is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wellwisher Tulip?

The registered promoter entity is Abhijeet Chandrakant Bhansali, an individual as per the filing. Its GSTIN 27AETPB4825M2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wellwisher Tulip?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Wellwisher Tulip?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Wellwisher Tulip?

The professionals named in the filing: Architect: BHARAT BALCHAND BATHIYA; Engineer: Samarth Agarwal; Chartered Accountant: BHUSHAN CHHAJED; Chartered Accountant: Hansaria Shah S and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Wellwisher Tulip?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wellwisher Tulip. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wellwisher Tulip to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.