Home / Browse projects / Raigarh, Maharashtra / Wellwisher Tulip
Wellwisher Tulip
By Abhijeet Chandrakant Bhansali
RG-MH-04212 · RERA P52000021345 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 37 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wellwisher Tulip is a Residential / Group Housing project by Abhijeet Chandrakant Bhansali in Raigarh, Maharashtra, registered with MahaRERA as P52000021345 on 24 Jun 2019. Possession is promised by 30 Sep 2027. The completion date has moved by 37 months from the original filing.
At a glance
Project
- NameWellwisher Tulip
- TypeResidential / Group Housing
- Location
- Vangani Pashane Road
- Plot no 136/1/12
- Pashane
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000021345
- ReraGenie IDRG-MH-04212
Builder
- NameAbhijeet Chandrakant Bhansali
- Entity typeIndividual
- GSTIN27AETPB4825M2Z0
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jun 2019
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 23 Aug 2024)
- Buildings2 building records
- Documents filed88 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 1 | NA | 5 | 0 | 0 | 0 | 0 |
| Building No 2 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.
Building No 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 271%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BHARAT BALCHAND BATHIYA |
| Engineer | Samarth Agarwal |
| Chartered Accountant | BHUSHAN CHHAJED |
| Chartered Accountant | Hansaria Shah S and Associates |
| Partner | Role in project |
|---|---|
| Abhijeet Chandrakant Bhansali | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 30/09/2027 to complete the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2027
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Wellwisher Tulip 31-03-2026_compressed_compressed.pdf | 20 Apr 2026 |
| Form 2File: Tulip Form 2 - Mar 26.pdf | 20 Apr 2026 |
| Form 3File: Form 3-WT-Q4-March 2026_signed.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Tulip - sold unsold 31-03-2026.pdf | 20 Apr 2026 |
| Form 1File: TULIP - DEC 25- FORM1.pdf | 16 Jan 2026 |
| Form 2File: Form 2.pdf | 16 Jan 2026 |
| Form 3File: Form 3.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - unsold - tulip.pdf | 16 Jan 2026 |
| Form 1File: architect - Tulip.pdf | 16 Oct 2025 |
| Form 2File: Tulip engineer.pdf | 16 Oct 2025 |
| Form 3File: Form 3-Tulip.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Tulip sold unsold.pdf | 16 Oct 2025 |
| Declaration in FORM BFile: new form b.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032023.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092023.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122023.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032024.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062024.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092024.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122024.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032025.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062025.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30122024.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30062025.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30032025.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30032025.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30092024.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30032024.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30122023.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30092023.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30062023.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30032023.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: 30062024.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032024.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062025.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032025.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122024.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092024.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062024.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122023.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092023.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062023.pdf | 18 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032023.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mar 21.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Tulip_page-0001.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 22.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Mar 23.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Mar 24.pdf | 18 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Annual-WT-F Y 2022-23.pdf | 23 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Annual-WT-F Y 2023-24.pdf | 23 May 2025 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 4 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 4 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wellwisher Tulips --- EC 27-09-24.pdf | 4 Nov 2024 |
| Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf | 4 Nov 2024 |
| CERSAI detailsFile: CERSAI.pdf | 4 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Separate bank account for real estate projects.pdf | 4 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: derivation Allotment.pdf | 4 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 4 Nov 2024 |
| Proforma of Agreement for saleFile: Pashane agreement - Bank Loan draft final.pdf | 4 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure of Interest of Other real estate.pdf | 4 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-PLOT 12 EC 30-12-22.pdf | 3 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Plot no 12 , Vangani Rera Certificate_compressed.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA Annual-WT-F Y 2018-19-Sign.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Annual-WT-F Y 2019-20-Sign.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Annual-WT-F Y 2020-21-Sign.pdf | 16 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Annual-WT-F Y 2021-22-Sign.pdf | 16 Dec 2022 |
| Certificates of CA (Form 3)File: Certificate_Tulip_31032021_Signed.pdf | 19 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf | 9 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf | 9 Nov 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 9 Nov 2019 |
| Building plan approvalFile: Building Plan Plot No 12-1.PDF | 14 Jun 2019 |
| Building plan approvalFile: Building Plan Plot No 12-2.PDF | 14 Jun 2019 |
| Layout approvalFile: Layout Plan-Plot No 12.PDF | 14 Jun 2019 |
| PAN CardFile: Abhijit sir pan card.pdf | 14 Jun 2019 |
| Copy of the legal title reportFile: Tile Search Report Plot No 12-1-19.pdf | 14 Jun 2019 |
| Copy of the legal title reportFile: Tile Search Report Plot No 12-19-20.pdf | 14 Jun 2019 |
| Copy of the legal title reportFile: Tile Search Report Plot No 12-39-76.pdf | 14 Jun 2019 |
| Details of encumbrancesFile: encumbrance clarance.pdf | 14 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan-Plot No 12.PDF | 14 Jun 2019 |
| Building Plan Approval (IOD)File: Building Plan Plot No 12-1.PDF | 14 Jun 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Wellwisher Tulip on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Plot no 136/1/125,900+ in Raigarh
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Abhijeet Chandrakant Bhansali
Abhijeet Chandrakant Bhansali has 2 registrations on MahaRERA, including Wellwisher Sunflower and Wellwisher Tulip. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Wellwisher Tulip is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wellwisher Tulip?
The registered promoter entity is Abhijeet Chandrakant Bhansali, an individual as per the filing. Its GSTIN 27AETPB4825M2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wellwisher Tulip?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Wellwisher Tulip?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wellwisher Tulip?
The professionals named in the filing: Architect: BHARAT BALCHAND BATHIYA; Engineer: Samarth Agarwal; Chartered Accountant: BHUSHAN CHHAJED; Chartered Accountant: Hansaria Shah S and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wellwisher Tulip?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback