Home / Browse projects / Pune, Maharashtra / VTB Crown

Registered No litigation declared Residential / Group Housing project

VTB Crown

By Mr Tanoj Digambar Borate

RG-MH-19415 · RERA P52100077695 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 30%
95 of 192Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

VTB Crown is a Residential / Group Housing project by Mr Tanoj Digambar Borate in Pune, Maharashtra, registered with MahaRERA as P52100077695 on 21 Oct 2024. Possession is promised by 23 Mar 2028. 97 of the 192 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameVTB Crown
  • TypeResidential / Group Housing
  • Location
    • Moshi
    • Borhadewadi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100077695
  • ReraGenie IDRG-MH-19415

Builder

  • NameMr Tanoj Digambar Borate
  • Entity typeIndividual
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion23 Mar 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Current status

51%97 of 192 units booked
37.0%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA15131040104
B BuildingNA131188088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 30%.

A Building30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Building30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed288

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots288
Closed/Covered288
BuildingClosed/CoveredTotal
A Building166166
B Building122122

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Oct 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI13823.32
Proposed, not sanctioned13,822 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SHOP NO 1 P, GK PALACIO S NO 111, BORADEWADI, DEHU ALANDI ROAD MOSHI PIMPRI CHINCHWAD DIST PUNE 412105
Estimated costRs 42.73 cr
Cost incurredRs 15.82 cr
Work done37.01%
BuildingWingEstimatedIncurred
A BuildingNARs 23.33 crRs 8.64 cr
B BuildingNARs 15.13 crRs 5.60 cr
-NARs 4.27 crRs 1.58 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShrinivas Pandit
EngineerAmar M Galave
EngineerPrashant Atpadkar
Chartered AccountantSpak & Company
Chartered AccountantSPAK & Co.
Chartered AccountantPushpa Bogati
Chartered AccountantNavdeep Jindal and Associates
PartnerRole in project
Mr Tanoj Digambar Borate-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 23 Mar 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 VTB Crown Sign.pdf17 Apr 2026
Withdrawal Update Form 3File: FORM 3 VTB Crown Sign.pdf17 Apr 2026
Layout approvalFile: 1 Layout.pdf30 Mar 2026
Building plan approvalFile: 2-5.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1 VTB CROWN.pdf12 Jan 2026
Withdrawal Update Form 2File: FORM 2 VTB CROWN.pdf12 Jan 2026
Withdrawal Update Form 3File: FORM 3 VTB CROWN.pdf12 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A VTB Crown Mar-25.pdf28 Nov 2025
Form 5 (FY 2024-2025)File: form 5 (VTB CROWN 2024-2025).pdf27 Nov 2025
Withdrawal Update Form 1File: Form-1 VTB CROWN Jun-25 (1).pdf29 Oct 2025
Withdrawal Update Form 1File: Form-1 VTB CROWN Sep-25 (1).pdf29 Oct 2025
Withdrawal Update Form 1File: Form-1 VTB CROWN Sep-25 (1).pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 VTB Crown April to june 2025.pdf29 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate VTB Crown Sep-25.pdf29 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate VTB Crown Sep-25.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3 VTB CROWN JUNE 2025.pdf29 Oct 2025
Withdrawal Update Form 3File: form 3 VTB Crown( jully-sept) 2025.pdf29 Oct 2025
Withdrawal Update Form 3File: form 3 VTB Crown( jully-sept) 2025.pdf29 Oct 2025
Withdrawal Update Form 1File: Form-1 VTB CROWN Sep-25.pdf28 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate VTB Crown Sep-25.pdf28 Oct 2025
Withdrawal Update Form 3File: form 3 VTB Crown( jully-sept) 2025.pdf28 Oct 2025
Form 1File: 03 Architect Certificate VTB Crown Oct-Dec 24.pdf16 Oct 2025
Form 2File: Engineer Certificate VTB Crown Oct-Dec-24.pdf16 Oct 2025
Form 3File: VTB CROWN Signed Dec 24.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: VTB CROWN Dec 24 Sold Unsold.pdf16 Oct 2025
Form 1File: 04 Architect Certificate VTB Crown Jan -Mar 25.pdf16 Oct 2025
Form 2File: Engineer Certificate VTB Crown Mar-25.pdf16 Oct 2025
Form 3File: VTB Crown Form 3 Mar 25.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold -Unsold Decalration VTB Crown Mar-25 Final.pdf16 Oct 2025
Disclosure of sold/ booked inventoryFile: Sold -Unsold Decalration VTB Crown Mar-25 Final.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: VTB CROWN Dec 24 Sold Unsold.pdf5 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A VTB Crown Mar-25 (1).pdf5 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VTB Crown Form 3 Mar 25 compressed.pdf23 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VTB Crown Mar-25.pdf23 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold -Unsold Decalration VTB Crown Mar-25 Final.pdf23 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTB Crown Dec-2024.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Architect Certificate VTB Crown April to June 24.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Architect Certificate VTB Crown July-Sept 24.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Architect Certificate VTB Crown Oct-Dec 24.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Architect Certificate VTB Crown Jan -Mar 25.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VTB Crown Oct-Dec-24.pdf5 May 2025
Layout approvalFile: VTB Crown Saction 1_compressed.pdf24 Mar 2025
Building plan approvalFile: VTB CROWN-2_compressed.pdf24 Mar 2025
Building plan approvalFile: VTB Crown Saction 3_compressed.pdf24 Mar 2025
Building plan approvalFile: VTB CROWN-4_compressed.pdf24 Mar 2025
Building plan approvalFile: VTB Crown Saction 5.pdf24 Mar 2025
Copy of Layout Approval (in case of layout)File: VTB Crown Saction 1_compressed.pdf24 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commenenment letter VTB Crown date 28082024.pdf24 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: VTB CROWN-2_compressed.pdf24 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: VTB Crown Saction 3_compressed.pdf24 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: VTB CROWN-4_compressed.pdf24 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: VTB Crown Saction 5.pdf24 Mar 2025
Declaration about Commencement CertificateFile: Declaration of CC_Circular 32_VTB CROWN.pdf24 Mar 2025
Proforma of Allotment letterFile: Allotment letter VTB Crown Revised.pdf14 Oct 2024
Proforma of Agreement for saleFile: Agrreement VTB Crown For Amenity Clause approval revsied.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_VTB Crown_Registration_compressed.pdf6 Oct 2024
Other - LegalFile: Genuiness of Commencement Certificate (1).pdf6 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: Genuiness of Commencement Certificate (1).pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Letter_Finance_.pdf6 Aug 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Letter_Finance_.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VTB Crown Arch Certificate.pdf1 Aug 2024
Other - TechnicalFile: ANNEXURE'A'_Prepared.pdf1 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured or unsecured finance availed for the project (3).pdf1 Aug 2024
Declaration in FORM BFile: Promoter Declaration_FORM B.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VTB Crown.pdf31 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-Declaration about RERA Designated Bank Accounts for Real Estate Project.pdf31 Jul 2024
Deviation Report with respect to Allotment letterFile: Allotment letter Deviation.pdf31 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Agrreement Deviation (2).pdf31 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Opening of RERA Designated Bank Accounts-Axis.pdf31 Jul 2024
Building plan approvalFile: VTB CROWN 3.pdf30 Jul 2024
Building plan approvalFile: VTB CROWN 2.pdf30 Jul 2024
Layout approvalFile: VTB CROWN compressed.pdf30 Jul 2024
PAN CardFile: Pan Card PDF.pdf30 Jul 2024
Copy of the legal title reportFile: Legal Title Report 1.pdf30 Jul 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Letter_Finance_.pdf30 Jul 2024
Copy of Layout Approval (in case of layout)File: VTB CROWN compressed.pdf30 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement Certificate (3).pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: VTB CROWN 2.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: VTB CROWN 3.pdf30 Jul 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OM SAI AVENUEP52100024012CHIKHALI, NEAR TO SWARAJ, Pune137Jan 2020OngoingDec 2027Registered original: Dec 2026Not due yet
VTB LANDMARKP52100031049SWARAJ RESIDENCY, Pune67Oct 2021OngoingDec 2026Registered original: Dec 2024Not due yet

How this compares with Pune

51%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTB Crown on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

Builder: Mr Tanoj Digambar Borate

Mr Tanoj Digambar Borate has 1 registration on MahaRERA, including VTB Crown. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTB Crown is delayed beyond 23 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTB Crown?

The registered promoter entity is Mr Tanoj Digambar Borate, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTB Crown?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VTB Crown?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTB Crown?

The professionals named in the filing: Architect: Shrinivas Pandit; Engineer: Amar M Galave; Engineer: Prashant Atpadkar; Chartered Accountant: Spak & Company; Chartered Accountant: SPAK & Co.; Chartered Accountant: Pushpa Bogati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTB Crown?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTB Crown. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTB Crown to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.