Home / Browse projects / Pune, Maharashtra / VRUNDAWAN PARK AMENITY COMMERCIAL

Completed No litigation declared Commercial project

VRUNDAWAN PARK AMENITY COMMERCIAL

By vedant developers

RG-MH-40637 · RERA P52100048748 · Last updated on MahaRERA portal: 1 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
46 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

VRUNDAWAN PARK AMENITY COMMERCIAL is a Commercial project by vedant developers in Pune, Maharashtra, registered with MahaRERA as P52100048748 on 17 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 6 of the 52 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameVRUNDAWAN PARK AMENITY COMMERCIAL
  • TypeCommercial
  • Location
    • JAMDAR ROAD
    • KASBA BARAMATI
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048748
  • ReraGenie IDRG-MH-40637

Builder

  • Namevedant developers
  • Entity typePartnership
  • PartnersVIRAJ RAJENDRA JAGTAP, RUPESH KAMLAKAR HANDE, rahul bharat khatmode, NAGESHWAR DIGAMBAR SHINDE, JAGDISH RAJENDRA JAGTAP
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

12%6 of 52 units booked
79.1%Work done, per cost certificate

Figures as on 1 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRUNDAWAN PARK AMENITY COMMERCIALNA3305252

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VRUNDAWAN PARK AMENITY COMMERCIAL: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Open Space45

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,014 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
AMOL H SUTARBaramati (M Cl)Pune
MALAN H SUTARBaramati (M Cl)Pune

Approvals and building plan

Sanctioning authorityBARAMATI MUNICIPAL COUNCIL
Permissible FSI1381.47
Proposed, not sanctioned1,381 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHIGWAN CHOWK BARAMATI
Estimated costRs 3.51 cr
Cost incurredRs 2.78 cr
Work done79.1%
BuildingWingEstimatedIncurred
VRUNDAWAN PARK AMENITY COMMERCIALNARs 3.36 crRs 2.65 cr
-NARs 15.00 lakhRs 13.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGOPAL SUTAR
EngineerRAHUL B KHATMODE
Chartered AccountantGIRISH A SATAV
Chartered AccountantSAMRAT GARULE
Chartered AccountantAKASH SANDIP KHINVASARA
PartnerRole in project
vedant developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf1 Aug 2025
Form 2File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf1 Aug 2025
Form 3File: FORM 3 AMENITY Dec-24.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Dec-24.pdf1 Aug 2025
Form 1File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf1 Aug 2025
Form 2File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf1 Aug 2025
Form 3File: FORM 3 AMENITY Dec-24.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Dec-24.pdf1 Aug 2025
Withdrawal Update Form 1File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf1 Aug 2025
Withdrawal Update Form 2File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf1 Aug 2025
Withdrawal Update Form 3File: FORM 3 AMENITY Dec-24.pdf1 Aug 2025
Occupational CertificateFile: AMENITY FULL OC(5).pdf1 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: com q1_compressed (2).pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: com q2_compressed.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: com q3_compressed.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Comm F1 Q1.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: comm f1 Q2.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Comm f1 Q3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: comm 1.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: comm 2.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: comm 3.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q 4 COMMERCIAL.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 commercial.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: 31-12-2023 commercial.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: 31-3-2024 commercial.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 amenity commerical.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Commercial.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Commercial.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 C Wing.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: commercial from 3.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - AMENITY COMMERCIAL.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Commercial.pdf20 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 amenity commercial.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Commercial.pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 Amenity_compressed.pdf20 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Rahul Khatmode.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest- Rupesh Hande.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Jagdish Jagtap.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Nageshwar Shinde.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Viraj Jagtap.pdf6 Jan 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE COMMERCIAL.pdf6 Jan 2023
Copy of the legal title reportFile: search amenity commercial.pdf29 Dec 2022
Deviation Report with respect to model copy of AgreementFile: no deviation AFS_compressed.pdf29 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance amenity.pdf16 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance amenity.pdf16 Dec 2022
Declaration in FORM BFile: Form B Amenity Commercial.pdf16 Dec 2022
Proforma of Allotment letterFile: Allotment letter Amenity commercial.pdf16 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank amenity commercial.pdf16 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 commercial complex.pdf25 Nov 2022
PAN CardFile: PAN Vedant Developers.pdf17 Nov 2022
Deviation Report with respect to Allotment letterFile: Devition report Allotment letter.pdf9 Nov 2022
Layout approvalFile: SANCTION LAYOUT C.pdf23 Oct 2022
Building plan approvalFile: sanction plan amenity.pdf23 Oct 2022
Details of encumbrances concerned to FinanceFile: Encumbrances.pdf23 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrances.pdf23 Oct 2022
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT C.pdf23 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: sanction plan amenity.pdf23 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf23 Oct 2022
Declaration about Commencement CertificateFile: Declaration commencement commercial.pdf23 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Commercial Complex.pdf23 Oct 2022
CERSAI detailsFile: CERSAI Commercial.pdf23 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
vrundavan parkkasba baramati60CompletedJan 2019Jan 2019

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRUNDAWAN PARK AMENITY COMMERCIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASBA BARAMATI13,700+ in Pune

2 kmVRUNDAWAN PARK AMENITY CCompleted 10Lapsed / revoked 5Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: vedant developers

VEDANT DEVELOPERS has 10 registrations on MahaRERA, including VRUNDAVAN PARK and HAMIDA HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VRUNDAWAN PARK AMENITY COMMERCIAL is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRUNDAWAN PARK AMENITY COMMERCIAL?

The registered promoter entity is vedant developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRUNDAWAN PARK AMENITY COMMERCIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRUNDAWAN PARK AMENITY COMMERCIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRUNDAWAN PARK AMENITY COMMERCIAL?

The professionals named in the filing: Architect: GOPAL SUTAR; Engineer: RAHUL B KHATMODE; Chartered Accountant: GIRISH A SATAV; Chartered Accountant: SAMRAT GARULE; Chartered Accountant: AKASH SANDIP KHINVASARA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRUNDAWAN PARK AMENITY COMMERCIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRUNDAWAN PARK AMENITY COMMERCIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRUNDAWAN PARK AMENITY COMMERCIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.