ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / VRUNDAVAN

Registered No litigation declared Residential / Group Housing project

VRUNDAVAN

By ABHIDNYA INFRA

RG-MH-32424 · RERA P52100080314 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 70%
18 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

VRUNDAVAN is a Residential / Group Housing project by ABHIDNYA INFRA in Pune, Maharashtra, registered with MahaRERA as P52100080314 on 21 May 2025. Possession is promised by 31 Dec 2026. 2 of the 20 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameVRUNDAVAN
  • TypeResidential / Group Housing
  • Location
    • JALOCHI
    • BARAMATI
    • GAT NO 161/A
    • PLOT NO 47 & 48 AT JALOCHI TAL BARAMATI DIST PUNE PIN 413102
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • RERA no.P52100080314
  • ReraGenie IDRG-MH-32424

Builder

  • NameABHIDNYA INFRA
  • Entity typePartnership

Key dates

this monthRegisteredMay 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 May 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed45 files

Current status

10%2 of 20 units booked
65.9%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRUNDAVANNA6620020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

VRUNDAVAN: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area600 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025
LandownerVillageDistrict
YOGESH ASHOK LALWANIBhigvanPune
SAHIL RAJENDRA BOGAWATBhigvanPune
RAHUL RAMESHRAO JADHAVBaramati (M Cl)Pune
VIJAYKUMAR GANPATRAO JADHAVBaramati (M Cl)Pune
PRADIP DHONDIRAM BOGAWATBhigvanPune

Approvals and building plan

Sanctioning authorityBaramati Muncipl Corporation
Permissible FSI1554.64
Proposed, not sanctioned1,555 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO.1, CTS NO.612, D.A.SATAV COMPLEX,OPP. NAIGAONKAR HOSPITAL, SILVER JUBILEE HOSPITAL ROAD, BARAMATI 413 102.
Estimated costRs 2.70 cr
Cost incurredRs 1.78 cr
Work done65.93%
BuildingWingEstimatedIncurred
VRUNDAVANNARs 2.70 crRs 1.78 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKET KALANGE & ASSOCIATES
EngineerSANKET KALANGE & ASSOCIATES
Chartered AccountantPRATIK DOSHI ASSOCIATES
PartnerRole in project
ABHIDNYA INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A.pdf13 May 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 2File: Form 2.pdf5 May 2026
Withdrawal Update Form 3File: Form 3.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf17 Dec 2025
Withdrawal Update Form 1File: Form-1.pdf1 Aug 2025
Withdrawal Update Form 2File: Form-2.pdf1 Aug 2025
Withdrawal Update Form 3File: Form-3.pdf1 Aug 2025
Layout approvalFile: NA Layout Signed.pdf10 Apr 2025
Copy of Layout Approval (in case of layout)File: NA Layout Signed.pdf10 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf10 Apr 2025
CERSAI detailsFile: Cersai Search.pdf10 Apr 2025
Building plan approvalFile: ABHIDNYA INFRA PLAN.pdf9 Apr 2025
PAN CardFile: PAN Card Abhidnya Infra.pdf9 Apr 2025
Copy of the legal title reportFile: Search And Title Report_rotated.pdf9 Apr 2025
Details of encumbrances concerned to FinanceFile: No Legal Finan Encumbrance.pdf9 Apr 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance Declar.pdf9 Apr 2025
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf9 Apr 2025
Declaration in FORM BFile: Form B developer.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Land Cost Declaration.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf9 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Appendix F.pdf9 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHIDNYA INFRA PLAN.pdf9 Apr 2025
Other - LegalFile: POA.pdf9 Apr 2025
Declaration about Commencement CertificateFile: Format D Abhidnya.pdf9 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Designated Bank.pdf9 Apr 2025
Deviation Report with respect to Allotment letterFile: No Deviation Model AFS AL.pdf9 Apr 2025
Details of encumbrances concerned to LegalFile: No Legal Finan Encumbrance.pdf9 Apr 2025
Details of encumbrances concerned to LegalFile: No Encumbrance Declar.pdf9 Apr 2025
Other - TechnicalFile: Annexure A Undertaking.pdf9 Apr 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation Model AFS AL.pdf9 Apr 2025
Proforma of Agreement for saleFile: Model AFS Developer - new sathekhat format on 24-4-2025.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Shubham Jarande.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Shubham Kalange.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Siddhant Nalawade.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Viren Jagatp.pdf9 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank.pdf9 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Declar Secured Unsecured Finance.pdf9 Apr 2025

How this compares with Pune

10%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRUNDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GAT NO 161/A, PLOT NO 47 & 48 AT JALOCHI TAL BARAMATI DIST PUNE PIN 41310213,700+ in Pune

Builder: ABHIDNYA INFRA

ABHIDNYA INFRA has 1 registration on MahaRERA, including VRUNDAVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VRUNDAVAN is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRUNDAVAN?

The registered promoter entity is ABHIDNYA INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRUNDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRUNDAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRUNDAVAN?

The professionals named in the filing: Architect: SANKET KALANGE & ASSOCIATES; Engineer: SANKET KALANGE & ASSOCIATES; Chartered Accountant: PRATIK DOSHI ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRUNDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRUNDAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRUNDAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.