Home / Browse projects / Raigarh, Maharashtra / VRINDAVAN HOMES
VRINDAVAN HOMES
RG-MH-64705 · RERA P52000011360 · Last updated on MahaRERA portal: 16 Jul 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VRINDAVAN HOMES is a Residential / Group Housing project by SHREE RUJVE ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000011360 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameVRINDAVAN HOMES
- TypeResidential / Group Housing
- Location
- Bandhiwali
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000011360
- ReraGenie IDRG-MH-64705
Builder
- NameSHREE RUJVE ENTERPRISES
- Entity typePartnership
- GSTIN27ACUFS1537N1ZB
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersRATILAL KESHA CHAUDHARY, RAMESH SAVA THANS
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Aug 2017
- Promised completion30 Dec 2023
- Revised completionRevised to 30 Dec 2023 (originally 30 Dec 2022)
- Buildings8 building records
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 4 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 4 | 0 | 0 | 0 | 0 |
| BUILDING C | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING D | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING E | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING F | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING G | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING H | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 16 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
61 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Internal walls, at 95%.
BUILDING A84%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BUILDING B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BUILDING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING E89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
BUILDING F89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
BUILDING G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING H91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING C | 1 | 1 |
| BUILDING D | 1 | 1 |
| BUILDING E | 1 | 1 |
| BUILDING F | 1 | 1 |
| BUILDING G | 1 | 1 |
| BUILDING H | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE DESIGN INDIA |
| Engineer | THE DESIGN INDIA |
| Partner | Role in project |
|---|---|
| SHREE RUJVE ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWE HAVE APPLIED FOR CHANGE OF APPLICATION ALSO AS WE HAVE GOT ADDITIONAL F.S.I FOR THE SAME PROJECT AS PER NEW UDCR , SO REQUEST YOU TO GRANT AN ADDITONAL 1 YEAR EXTENSION TILL THE WE WILL COMPLETE OUR PROJECT AS OUR PROJECT IS 90% COMPLETED
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 15 Jul 2024
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 shree rujve enterprises phase 1-compressed.pdf | 16 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SHREERUJVE PHASE 1 OC_compressed.pdf | 15 Jul 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SHREERUJVE SOCIETY LETTER PHASE 1.pdf | 15 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHREE RUJVE PHASE 1 FORM 1_compressed.pdf | 11 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE RUJVE FORM 2 PHASE 1_compressed (2).pdf | 11 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Shree Rujve Phase 1.pdf | 9 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Shree Rujve PHASE 1 Feb 24.pdf | 8 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Shree Rujve PHASE 1 Feb 24.pdf | 8 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MahaRERA FORM 5_21-22.pdf | 28 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3__ShreeRujvee_April, 2023_Phase1_Signed.pdf | 4 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3__ShreeRujvee_July, 2023_Phase1.pdf | 4 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3__ShreeRujvee_Sept, 2023_Phase1.pdf | 4 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate shree rujve phase 1.pdf | 18 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate shree rujve phase 1.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Shree rujve phase 1- quality assurance certificate.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shree rujve phase 1- quality assurance certificate year 2020-2021.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: shree rujve phase 1 - quality assurance certificate - year 2021-2022.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shree rujve phase 1- quality assurance certificate year 2022-2023.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 phase 1.pdf | 18 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200260238955_For_Asset_Based_Search_13_02_2023_19_44_51_771.pdf | 13 Feb 2023 |
| CERSAI detailsFile: ScannerGo_1676299299523.pdf | 13 Feb 2023 |
| Certificates of CA (Form 3)File: form 3.pdf | 13 Feb 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 13 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: no deviation allotment.pdf | 13 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: no deviation agreement of sale.pdf | 13 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: LEGAL.pdf | 3 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: FINANCE.pdf | 3 Feb 2023 |
| Details of encumbrances concerned to LegalFile: LEGAL.pdf | 3 Feb 2023 |
| Details of encumbrances concerned to LegalFile: FINANCE.pdf | 3 Feb 2023 |
| Declaration about Commencement CertificateFile: DECLARATION.pdf | 3 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ORDER 39.pdf | 3 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PdfScanner_0302192639.pdf | 3 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK.pdf | 3 Feb 2023 |
| Building plan approvalFile: Order.pdf | 20 Jul 2022 |
| Building plan approvalFile: wide_2022_06-27_18_57-26.pdf | 20 Jul 2022 |
| Building plan approvalFile: wide_2022_06-27_18_59-20.pdf | 20 Jul 2022 |
| Building plan approvalFile: wide_2022_06-27_19_06-05.pdf | 20 Jul 2022 |
| Building Plan Approval (IOD)File: Order.pdf | 20 Jul 2022 |
| Building Plan Approval (IOD)File: wide_2022_06-27_18_57-26.pdf | 20 Jul 2022 |
| Building Plan Approval (IOD)File: wide_2022_06-27_18_59-20.pdf | 20 Jul 2022 |
| Building Plan Approval (IOD)File: wide_2022_06-27_19_06-05.pdf | 20 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Order.pdf | 20 Jul 2022 |
| Declaration about Commencement CertificateFile: wide_2022_06-27_19_02-12.pdf | 20 Jul 2022 |
| Declaration about Commencement CertificateFile: Declaration About Commencement.pdf | 20 Jul 2022 |
| Certificates of CA (Form 3)File: CA FORM 3 CERTIFICATE.pdf | 20 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COLLECTOR CC ORDER.pdf | 21 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Shree Rujve Ent.pdf | 21 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Shree Rujve Ent-1920.pdf | 21 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engg cert.pdf | 5 Feb 2021 |
| Certificates of CA (Form 3)File: FORM 3 SIGN AND SCAN_compressed.pdf | 5 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT.pdf | 1 Oct 2018 |
| Certificates of CA (Form 3)File: Form 3 Scanned (1)CA.pdf | 1 Oct 2018 |
| Certificates of CA (Form 5)File: Form 5.pdf | 29 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rera engg cert.pdf | 29 Mar 2018 |
| Certificates of CA (Form 3)File: SHREE RUJVE CA CERT COMPR.pdf | 29 Mar 2018 |
| Certificates of CA (Form 3)File: FORM_3_AUG_TO_OCT.pdf | 4 Dec 2017 |
| Building plan approvalFile: COLLECTOR APPROVED PLAN.pdf | 11 Aug 2017 |
| Layout approvalFile: COLLECTOR APPROVED PLAN.pdf | 11 Aug 2017 |
| PAN CardFile: PAN CARD PDF.pdf | 11 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: COLLECTOR APPROVED PLAN.pdf | 11 Aug 2017 |
| Building Plan Approval (IOD)File: COLLECTOR APPROVED PLAN.pdf | 11 Aug 2017 |
| Declaration in FORM BFile: FORM B.pdf | 11 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT LOW RES.pdf | 10 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT.pdf | 10 Aug 2017 |
| Copy of the legal title reportFile: Shri Rujvi Enterprises title report low res.pdf | 9 Aug 2017 |
| Details of encumbrancesFile: encumbrances cert.pdf | 9 Aug 2017 |
| Certificates of CA (Form 3)File: CA CERTIFICATE low res.pdf | 9 Aug 2017 |
| Proforma of Allotment letterFile: Agreement for Sale low res.pdf | 9 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep VRINDAVAN HOMES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bandhiwali5,900+ in Raigarh
Filed coordinates, straight-line distance. 104 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: SHREE RUJVE ENTERPRISES
SHREE RUJVE ENTERPRISES has 2 registrations on MahaRERA, including VRINDAVAN HOMES and VRINDAVAN HOME PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if VRINDAVAN HOMES is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VRINDAVAN HOMES?
The registered promoter entity is SHREE RUJVE ENTERPRISES, a partnership as per the filing. Its GSTIN 27ACUFS1537N1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VRINDAVAN HOMES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VRINDAVAN HOMES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VRINDAVAN HOMES?
The professionals named in the filing: Architect: THE DESIGN INDIA; Engineer: THE DESIGN INDIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VRINDAVAN HOMES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback