Home / Browse projects / Mumbai Suburban, Maharashtra / VRINDAVAN ELITE

Registered No litigation declared Residential / Group Housing project

VRINDAVAN ELITE

By MATRIX CONSTRUCTIONS

RG-MH-81071 · RERA P51800048196 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
17 of 108Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

VRINDAVAN ELITE is a Residential / Group Housing project by MATRIX CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048196 on 15 Dec 2022. Possession is promised by 8 Oct 2026. 91 of the 108 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVRINDAVAN ELITE
  • TypeResidential / Group Housing
  • Location
    • KANNAMWAR NAGAR
    • VIKHROLI EAST
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048196
  • ReraGenie IDRG-MH-81071

Builder

  • NameMATRIX CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27ABRFM4879K1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerPawan Ashok Tharwani
  • Other registrations5 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2022PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2022
  • Promised completion8 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

84%91 of 108 units booked
99.2%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA23221080108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

1: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area585 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Aug 2025
LandownerVillageDistrict
KANNAMWAR NAGAR VRUNDAVAN CO-OP HSG SOCIETY LTDHariyaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI4529.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Flr Shop No 4 and 5, Shree Devkinanadan Bldg, Plot No 575, Near Celebration Hotel, Sion Trombay Road, Chembur, Mumbai, Maharashtra, Pin 400071
Estimated costRs 21.16 cr
Cost incurredRs 21.00 cr
Work done99.24%
BuildingWingEstimatedIncurred
1NARs 21.16 crRs 21.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN RAKSHE
EngineerROHIT RAVINDRA VARMA
Chartered AccountantVAIBHAV KIRIT NAGDA
Chartered AccountantJainam Doshi
PartnerRole in project
MATRIX CONSTRUCTIONS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600701NITIN SONAWANEMATRIX CONSTRUCTIONS06/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 8 Oct 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Bldg 24 Q4.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Bldg 24 Q4.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 Bldg 24 Q4.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Bldg 24 Q3.pdf17 Mar 2026
Withdrawal Update Form 2File: Form 2 Bldg 24 Q3.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3_Q2_compressed.pdf17 Mar 2026
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Vrindavan Elite.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1_Q2_Vrindavan Elite.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2_Q2_Vrindavan Elite.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3_Q2_compressed.pdf5 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Bldg 24 Q1.pdf23 Aug 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 Bldg 24 Q1.pdf23 Aug 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Bldg 24 Q1_compressed.pdf23 Aug 2025
Form 1File: Form 1_Vrindavan Elite 31032025.pdf28 May 2025
Form 2File: Form 2_Vrindavan Elite 31032025.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Circular 29_Vrindavan Elite 31032025.pdf28 May 2025
Form 3File: Form 3_Vrindavan Elite 31032025_compressed.pdf28 May 2025
Form 1File: Form 1_Vrindavan Elite 31122024.pdf28 May 2025
Form 2File: Form 2_Vrindavan Elite 31122024.pdf28 May 2025
Form 3File: Form 3_Vrindavan Elite 31122024_compressed.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Circular 29_Vrindavan Elite 31122024.pdf28 May 2025
Layout approvalFile: Approved Floor Plan Floor 2-22_compressed.pdf7 Dec 2024
Layout approvalFile: Approved Staircase Plan_compressed.pdf7 Dec 2024
Copy of Layout Approval (in case of layout)File: Approved Floor Plan Floor 2-22_compressed.pdf7 Dec 2024
Copy of Layout Approval (in case of layout)File: Approved Staircase Plan_compressed.pdf7 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Vrindavan Elite CC upto 19th floor.pdf7 Dec 2024
Declaration about Commencement CertificateFile: Vrindavan Full CC upto 22nd floor.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf2 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Architect's Certificate.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf6 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf6 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured Unsecured finance availed for Project - .pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Vrindavan Elite.pdf18 Mar 2024
Declaration about Commencement CertificateFile: Declaration about Commencement.pdf6 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no.pdf6 May 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf9 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost.pdf2 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details.pdf2 Dec 2022
Details of encumbrances concerned to FinanceFile: encumbrances concerned to Finance.pdf1 Dec 2022
Details of encumbrances concerned to LegalFile: encumbrances concerned to Finance.pdf1 Dec 2022
CERSAI detailsFile: CERSAI details.pdf1 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report copy of Agreement.pdf24 Nov 2022
Deviation Report with respect to Allotment letterFile: respect to Allotment letter.pdf20 Nov 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances.pdf17 Nov 2022
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances.pdf17 Nov 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf3 Nov 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf3 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf19 Oct 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf18 Oct 2022
Declaration in FORM BFile: Declaration in FORM B.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf18 Oct 2022
Proforma of Allotment letterFile: Allotment letter.pdf18 Oct 2022
Building plan approvalFile: Building Plan Approval.pdf9 Oct 2022
Layout approvalFile: Building Plan Approval.pdf9 Oct 2022
PAN CardFile: Pan Card.pdf9 Oct 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf9 Oct 2022
Copy of Layout Approval (in case of layout)File: Building Plan Approval.pdf9 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf9 Oct 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MK ImperialPM1180002500987Vikhroli East, Mumbai Suburban-Sep 2025OngoingJun 2029Not due yet
MK OASISP51800080417Vikhroli East, Mumbai Suburban-Jun 2025OngoingDec 2028Not due yet
MK EmeraldP51800055884Kannammwar Nagar-1, Mumbai Suburban112Apr 2024OngoingAug 2027Not due yet

How this compares with Mumbai Suburban

84%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIKHROLI EAST6,700+ in Mumbai Suburban

2 kmVRINDAVAN ELITECompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: MATRIX CONSTRUCTIONS

MATRIX CONSTRUCTIONS has 6 registrations on MahaRERA, including SHANTI NIKETAN and VRINDAVAN ELITE. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VRINDAVAN ELITE is delayed beyond 8 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN ELITE?

The registered promoter entity is MATRIX CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27ABRFM4879K1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VRINDAVAN ELITE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VRINDAVAN ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN ELITE?

The professionals named in the filing: Architect: SACHIN RAKSHE; Engineer: ROHIT RAVINDRA VARMA; Chartered Accountant: VAIBHAV KIRIT NAGDA; Chartered Accountant: Jainam Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN ELITE to a free account