Home / Browse projects / Mumbai Suburban, Maharashtra / VRAJ EMERALD 60-SAIKRUPA

Registered Litigation declared Residential / Group Housing project

VRAJ EMERALD 60-SAIKRUPA

By VRAJ KAMMAN DEVELOPERS

RG-MH-07262 · RERA P51800055177 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 8 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 80%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

VRAJ EMERALD 60-SAIKRUPA is a Residential / Group Housing project by VRAJ KAMMAN DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055177 on 5 Mar 2024. Possession is promised by 31 Dec 2029.

At a glance

Project

  • NameVRAJ EMERALD 60-SAIKRUPA
  • TypeResidential / Group Housing
  • Location
    • M P VAIDHYA MARG
    • GHATKOPER EAST
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • RERA no.P51800055177
  • ReraGenie IDRG-MH-07262

Builder

  • NameVRAJ KAMMAN DEVELOPERS
  • Entity typePartnership
  • PartnerMAULIK SUBHASH MORZARIA
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Mar 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Saikrupa -A WingNA108000
Saikrupa B WingNA98000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 80%.

Saikrupa -A Wing43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Saikrupa B Wing43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area762 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
DILIPBHAI V BHAGAT-Vadodara

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2058.55
Proposed, not sanctioned764 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 4,5,9,10 Kesar Plaza, station Road, Jogeshwari East, Mumbai 60

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShrikant Vichare & Associates
EngineerR D Magdum
Chartered AccountantCA SANKET KHOYA
PartnerRole in project
VRAJ KAMMAN DEVELOPERS-

Litigation declared8

CaseCourtStatus
1544/12 /2018Small cause courtOngoing
1993/18 /2018City Civil CourtOngoing
New/2023Small cause courton going
New/2023High CourtOngoing
New/2023City Civil Courton going
782/2025City CivilOngoing
12932/2025High CourtOngoing
452/2024City CivilOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: VKD Form 1 as on.pdf15 Apr 2026
Form 2File: VKD form 2.pdf15 Apr 2026
Form 3File: VKD Form.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory disclosure as.pdf15 Apr 2026
Form 1File: VKD Sai Krupa Form 1.pdf8 Jan 2026
Form 2File: VKD Sai Krupa Form 2.pdf8 Jan 2026
Form 3File: VKD Sai Krupa Form 3_compressed.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of inventory Saikrupa.pdf8 Jan 2026
Form 1File: Form 1 Rera Certificate- as oct 25.pdf13 Oct 2025
Form 2File: VKD FORM-2 as on OCT 25.pdf13 Oct 2025
Form 3File: VKD FORM 3 as on Oct 25.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: VKD SAIKRUPA DISCLOSURE OF SOLD INVENTORY AS ON Sep 30.pdf13 Oct 2025
Form 1File: VKD Form 1 Quater 4 .pdf19 Jul 2025
Form 2File: VKD form 2 Quater 4 .pdf19 Jul 2025
Form 3File: VKD Form 3 Quater 4 .pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Saikrupa inventory.pdf19 Jul 2025
Layout approvalFile: Ameded Approval Letter with Plans.pdf5 May 2025
Copy of Layout Approval (in case of layout)File: Ameded Approval Letter with Plans.pdf5 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 2439785_FurtherCC_signed.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VKD From - 1 Quater 4 (1).pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VKD Form - 3 For Quater 4.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VKD Form - 2 For Quater 4 (1).pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: VKD Form 2 A 21-22.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: VKD Form 2A 20-21.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VKd Form 5 2021-22.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VKD form 2A 2024.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Declaration Fy 2017-18 VKD.pdf5 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineer VKD 2019-20.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Declaration Fy 2018-19 VKD.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Declaration Fy 2019-20 VKD.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Declaration Fy 2020-21 VKD.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Annual Report VKD Fy 2022-23.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5Vkd 2021-22.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VKD Form 2 A for yr 2021-22.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: VKd Form 2 A 2022-23.pdf3 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5VKD 23-24.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saikrupa Arch certificate Qtr 2.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VKD Form1 Architect Certificate Q3 (1).pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VKD CA Certificate Q1 Form 3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VKD Form3 CA Certificate Q2 (1).pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VKD Form3 CA Certificate Q3 (1).pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ENGINEER'S CERTIFICATE -Saikrupa (9).pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VKD Form 3- Jan-Apr24.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VKD Form2 Engineer Certificate Q3(1).pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VKd Qtr 1 Form 2.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VKd Qtr 2.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE -Saikrupa jan 25 (2).pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 (2).pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate SC.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 (4).pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 (4).pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 (2).pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 (2).pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 (4).pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final saikrupa.pdf29 Feb 2024
Other - TechnicalFile: plan saikrupa.pdf26 Feb 2024
Declaration in FORM BFile: Form B promoter Saikrupa.pdf21 Feb 2024
Other - LegalFile: aUTHORISATION.pdf14 Feb 2024
Building plan approvalFile: IOD With Plans (2).pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD With Plans (2).pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 (2).pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 (2).pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 5.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 7.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 6.pdf6 Feb 2024
Other - TechnicalFile: Annexure A.pdf31 Jan 2024
CERSAI detailsFile: Cersai Undertaking Vkd.pdf19 Jan 2024
Layout approvalFile: IOD With Plans (1).pdf30 Dec 2023
Details of encumbrances concerned to FinanceFile: Saikrupa legal , Financial encumbrance.pdf30 Dec 2023
Details of encumbrances concerned to LegalFile: Saikrupa legal , Financial encumbrance.pdf30 Dec 2023
Copy of Layout Approval (in case of layout)File: IOD With Plans (1).pdf30 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saikrupa Form 1.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Saikrupa.pdf30 Dec 2023
Proforma of Agreement for saleFile: Draft Agreement for Sale - for RERA_.pdf30 Dec 2023
Deviation Report with respect to Allotment letterFile: Diviation Allotment.pdf30 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Saikrupa Deviation Agreement.pdf30 Dec 2023
Copy of the legal title reportFile: Title Certificate Saikrupa.pdf29 Dec 2023
Declaration about Commencement CertificateFile: VKDLLP DECLARATION ABOUT CC.pdf29 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationRegisteredStatusPromisedDelivered
VRAJ GATEWAY-APARNA CHSLP51800051086Borivali West, Mumbai SuburbanMay 2023OngoingDec 2028Not due yet

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRAJ EMERALD 60-SAIKRUPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPER EAST6,700+ in Mumbai Suburban

Builder: VRAJ KAMMAN DEVELOPERS

VRAJ KAMMAN DEVELOPERS has 1 registration on MahaRERA, including VRAJ EMERALD 60-SAIKRUPA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VRAJ EMERALD 60-SAIKRUPA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRAJ EMERALD 60-SAIKRUPA?

The registered promoter entity is VRAJ KAMMAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRAJ EMERALD 60-SAIKRUPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRAJ EMERALD 60-SAIKRUPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRAJ EMERALD 60-SAIKRUPA?

The professionals named in the filing: Architect: Shrikant Vichare & Associates; Engineer: R D Magdum; Chartered Accountant: CA SANKET KHOYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRAJ EMERALD 60-SAIKRUPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRAJ EMERALD 60-SAIKRUPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRAJ EMERALD 60-SAIKRUPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.