Home / Browse projects / Mumbai Suburban, Maharashtra / VKLAL VISHNU PHASE I

Registered Litigation declared Residential / Group Housing project

VKLAL VISHNU PHASE I

By VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED

RG-MH-70894 · RERA P51800011626 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 10 cases
  • 4 complaints at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken
  • Rs 10.00 crore secured on the land, in favour of ADITYA BIRLA FINANCE LTD

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
3 of 66Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 166 documents Report an error

VKLAL VISHNU PHASE I is a Residential / Group Housing project by VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011626 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 63 of the 66 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameVKLAL VISHNU PHASE I
  • TypeResidential / Group Housing
  • Location
    • SN Dubey street
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011626
  • ReraGenie IDRG-MH-70894

Builder

  • NameVEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsAnita Haresh Nanwani, Haresh Khiamal Nanwani
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed166 files

Current status

95%63 of 66 units booked
118.7%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VKLAL VISHNU PHASE INA252266066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VKLAL VISHNU PHASE I: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered1
Open Space7

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,031 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA FINANCE LTD
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on11 Sep 2025
LandownerVillageDistrict
KHUSHI BUILDERS AND DEVELOPERSBorivaliMumbai Suburban
TYABJI ESTATE PRIVATE LIMITED-Mumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI14408.49
Proposed, not sanctioned7,801 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5Cli Ground Floor Mittal Court Mumbai 400021
Estimated costRs 46.35 cr
Cost incurredRs 55.01 cr
Work done118.68%
BuildingWingEstimatedIncurred
VKLAL VISHNU PHASE INARs 46.35 crRs 55.01 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitendra Patel
EngineerJayesh Khanvilkar
EngineerARIF RUPALWALA
Chartered AccountantHardik Natvarlal Thakkar
PartnerRole in project
VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017964Dec 2023 → Dec 2024

Reason as filed by the promoterThe promoters seek extension on the project completion date as the construction work got slowed and delayed due to unforeseen circumstances in the post Covid period due to multiple reasons beyond control of the promoters such as acute shortage of building materials, delayed delivery of building materials from the suppliers, too much increased and variation in raw material rates demanded by raw material suppliers post covid which drastically influenced the tight project budget leading to find new suppliers to keep project viable which consumed considerable time along with inconsistent labour su

EA16092502596Dec 2023 → Dec 2026

Reason as filed by the promoterproject is completed awaiting for OC from Concerned Authority

Litigation declared10

CaseCourtStatus
C/RTS/9/1994/1994DY COLLECTOROngoing
474/2011CITY CIVIL COURTOngoing
1692/2016CITY CIVIL COURTOngoing
CRR NO 526 2012 IN SUIT NO 3415 1947/2012HIGH COURT BOMBAYClosed
NM NO 1077 2014/2014HIGH COURT BOMBAYOngoing
Suit No 58 of 2022/2022CITY CIVIL COURT DINDOSHIOngoing
Suit No 3183 of 1988/1988HIGH COURT BOMBAYOngoing
Suit No 3235 of 1991/1991HIGH COURT BOMBAYClosed
C/RTS/9/1994/1994DY. CollectorOngoing
APPEAL (L) NO.-13363 OF 2025/2025High Court of BombayOngoing

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000209815SHOEB AHMED SHAIKHVKLAL Vishnu25/01/2022
CC006000000439678Meghal Rajan SaveVeekaylal Investment Co. Pvt. Ltd.16/03/2024
CC006000000480131Hemchandra Vijay MoreVeekaylal Investment Co. Pvt. Ltd20/04/2024
CC12400928Prathmesh Suresh ShirambekarVEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED28/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed166

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form - 1 Q-1-FY26-27-Vishnu.pdf3 Aug 2026
Withdrawal Update Form 2File: QUARTER 1 ( FY-26-27 ).pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q1 -26-27 (2).pdf3 Aug 2026
Withdrawal Update Form 1File: Form-1-Vishnu Phase-Q1-FY25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q3 -25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q3 -25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q3 -25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q4 -25-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 - Vishnu Phase I - Q4 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q1 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q4 -25-26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Phase I - Q4 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q1 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q2 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q4 -25-26.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Phase I - Q4 -25-26.pdf22 May 2026
Form 2A (FY 2023-2024)File: FORM-2A-RERA-23-24-Vishnu.PDF9 Jan 2026
Form 2A (FY 2024-2025)File: FORM-2A-RERA-24-25-Vishnu.PDF9 Jan 2026
Form 5 (FY 2023-2024)File: VishnuFY202324.pdf8 Jan 2026
Form 5 (FY 2024-2025)File: VishnuFY202425.pdf8 Jan 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Vishnu Q3 - FY 24-25.pdf4 Mar 2025
Certificates of CA (Form 3)File: Form 3 - Vishnu Q3 - FY 24-25.PDF4 Mar 2025
Certificates of CA (Form 3)File: Form 3 - Vishnu Q3 - FY 24-25.PDF4 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vishnu Q3 - FY 24-25.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Vishnu Sales Data.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Vishnu - Q1 FY24-25.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 - 30 Sept 2024.pdf30 Nov 2024
Certificates of CA (Form 3)File: FORM 3 - Vishnu - Q1 FY 24-25.PDF30 Nov 2024
Certificates of CA (Form 3)File: FORM 3 - Vishnu - Q2.PDF30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vishnu - Q1 FY-24-25.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vishnu - Q2 FY-24-25.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 1 - 30 Sept 2024.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Vishnu.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu-Form-1-Q4-FY 23-24.pdf27 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vishnu-Form 2 -Q4-FY 23-24.pdf27 Jun 2024
Certificates of CA (Form 3)File: Vishnu-Form 3-Q4 -FY 23-24 (1).pdf27 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -Vishnu-Q3.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf28 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Vishnu Q3.PDF28 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Vishnu Q3.PDF28 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vishnu ( FY-23-24 ).pdf26 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA Form 2A - Vishnu Q1.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu Phase I - Form 2A - Q2.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu-Form 2A-31-03-23.pdf17 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Vishnu Q3.pdf4 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vishnu Phase I - Form 2 - Q2.pdf4 Jan 2024
Certificates of CA (Form 3)File: Form 3- Vishnu Q3.PDF4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Site Supervisor Certificate - Vishnu Phase I - 31-03-2022.pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu Phase I - Form 2A - RERA Certificate - 2022-06-30 (1).pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu Phase I - Form 2A - RERA Certificate - 2022-06-30 (1).pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu-Form 2A - Site supervisor's certificate - 2022-09-30 (2).pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu-Form 2A - Site supervisor's certificate - 2022-09-30 (2).pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A RERA Certificate - 2022-12-31 (1).pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vishnu Phase I - Form 2A - RERA Certificate - 2022-12-31.pdf2 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 31-03-2022 (2).pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 2022-06-30 (2).pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 2022-06-30 (2).pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 2022-06-30 (2).pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 2022-09-30 (2).pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 31-12-2022.pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu - Form 1 31-03-2023.pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vishnu Form 1 30-06-2023 (2).pdf12 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q1 - VISHNU.pdf8 Sep 2023
Certificates of CA (Form 3)File: RERA Form 3 - Vishnu Q1.pdf5 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE 2022 (1).pdf8 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEPT 2022.pdf8 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 2022.pdf8 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH 2023.pdf8 Aug 2023
Certificates of CA (Form 3)File: Form 3 Vishnu Q1.pdf8 Aug 2023

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VKLAL VISHNU PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahisar6,700+ in Mumbai Suburban

2 kmVKLAL VISHNU PHASE ICompleted 63Lapsed / revoked 39Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 185 registered projects within 2 km.

Builder: VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED

VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED has 2 registrations on MahaRERA, including VKLAL HARI PHASE I and VKLAL VISHNU PHASE I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VKLAL VISHNU PHASE I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VKLAL VISHNU PHASE I?

The registered promoter entity is VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VKLAL VISHNU PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VKLAL VISHNU PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VKLAL VISHNU PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VKLAL VISHNU PHASE I?

The professionals named in the filing: Architect: Jitendra Patel; Engineer: Jayesh Khanvilkar; Engineer: ARIF RUPALWALA; Chartered Accountant: Hardik Natvarlal Thakkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VKLAL VISHNU PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VKLAL VISHNU PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VKLAL VISHNU PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.