Home / Browse projects / Mumbai Suburban, Maharashtra / VKLAL HARI PHASE I
VKLAL HARI PHASE I
By VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED
RG-MH-56416 · RERA P51800010657 · Last updated on MahaRERA portal: 1 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- Completion date moved by 12 months
- 1 extension taken
- Rs 25.00 crore secured on the land, in favour of BANK OF MAHARASHTRA
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VKLAL HARI PHASE I is a Residential / Group Housing project by VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010657 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 86 of the 97 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameVKLAL HARI PHASE I
- TypeResidential / Group Housing
- Location
- .
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800010657
- ReraGenie IDRG-MH-56416
Builder
- NameVEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED
- Entity typeCompany
- DirectorsAnita Haresh Nanwani, Haresh Khiamal Nanwani
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed157 files
Current status
Figures as on 1 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VKLAL HARI PHASE I | NA | 26 | 22 | 97 | 0 | 97 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.
VKLAL HARI PHASE I: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | Yes | 20% |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VKLAL HARI PHASE I | NA | Rs 28.84 cr | Rs 35.02 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jitendra Patel |
| Engineer | Jayesh Khanvilkar |
| Engineer | Arif Rupalwala |
| Chartered Accountant | Hardik Natvarlal Thakkar |
| Chartered Accountant | Bharat Dharamdas & Associates LLP |
| Partner | Role in project |
|---|---|
| VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Promoters are seeking an extension of the project completion date which is presently fixed as 31st Dec 2025. It is submitted that the RCC structure of the entire building has been completed, and internal finishing works are presently in progress. The delay in completion of the project has occurred due to circumstances beyond the control of the Promoters, as detailed hereinbelow: The Slum Rehabilitation Authority (SRA) had issued a Stop Work Notice on 17.10.2017 at the behest of the Government of Maharashtra. In order to challenge the said Stop Work Notice, the Promoters were constrained to
Litigation declared6
| Case | Court | Status |
|---|---|---|
| WPL 3456 OF 2017 WP No 943 of 2018/2017 | HIGH COURT | Pending for final hearing |
| S C SUIT NO 58 OF 2022/2022 | CITY CIVIL COURT DINDOSHI | Pending for hearing of Notice of Motion |
| Suit No 58 of 2022/2022 | CITY CIVIL COURT DINDOSHI | Pending for hearing of Notice of Motion |
| Suit No 3183 of 1988/1988 | HIGH COURT BOMBAY | Pending for Evidence of Parties |
| Suit No 3235 of 1991/1991 | HIGH COURT BOMBAY | Pending for Restoration of the suit |
| Suit No 1666 of 2010/2010 | CITY CIVIL COURT DINDOSHI | Pending for framing of issues |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed157
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: RERA Form 1-Hari -Q1-2026-27.pdf | 1 Aug 2026 |
| Withdrawal Update Form 2File: RERA Form 1-Hari -Q1-2026-27.pdf | 1 Aug 2026 |
| Withdrawal Update Form 3File: RERA Form 3-Hari -Q1-2026-27.pdf | 1 Aug 2026 |
| Withdrawal Update Form 1File: Form 1-Hari -2026-03-31-Signed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Q4 FY-25-26.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Q4 FY-25-26.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: RERA Form2-Q2.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form 3-Hari.PDF | 13 Feb 2026 |
| Form 5 (FY 2023-2024)File: Hari2324.pdf | 8 Jan 2026 |
| Form 5 (FY 2024-2025)File: Hari202425.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 29 Dec 2025 |
| Withdrawal Update Form 2File: RERA Form2-Q2.pdf | 29 Dec 2025 |
| Withdrawal Update Form 3File: Sold-Unsold Inventory Details-Q2-25-26-Hari.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: RERA Form 1 - 30-06-25-Hari.pdf | 13 Dec 2025 |
| Withdrawal Update Form 1File: Form1.pdf | 13 Dec 2025 |
| Withdrawal Update Form 2File: QUARTER 1 (FY-25-26).pdf | 13 Dec 2025 |
| Withdrawal Update Form 2File: RERA Form2-Q2.pdf | 13 Dec 2025 |
| Withdrawal Update Form 3File: H THAKKAR 1.PDF | 13 Dec 2025 |
| Withdrawal Update Form 3File: H THAKKAR 2.PDF | 13 Dec 2025 |
| Form 3File: Form 3 - Hari Q3 - FY 24-25.PDF | 4 Dec 2025 |
| Form 2File: Form 2 - Hari Q3 - FY 24-25.pdf | 4 Dec 2025 |
| Form 1File: Form 1 - Hari Q3 - FY 24-25.pdf | 4 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Inventory.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 - Hari - Q4 - FY 24-25.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 - Hari - Q4 - FY 24-25 (1).PDF | 4 Dec 2025 |
| Form 2File: Form 2 - Hari - Q4 - FY 24-25.pdf | 11 Jun 2025 |
| Form 1File: Form 1 - Hari - Q4 - FY 24-25.pdf | 11 Jun 2025 |
| Form 3File: Form 3 - Hari - Q4 - FY 24-25.PDF | 11 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf | 11 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Hari Q3 - FY 24-25.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 - Hari Q3 - FY 24-25.PDF | 4 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Hari Q3 - FY 24-25.pdf | 4 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hari Phase I - Form 2A FY 23-24.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Hari Sales Data.pdf | 14 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Hari Q2 - FY 24-25.pdf | 3 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 - Hari - Q2.PDF | 30 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: QUARTER 2 FY-24-25 Hari.pdf | 30 Nov 2024 |
| Proforma of Allotment letterFile: Updated Allotment Letter as per RERA.pdf | 21 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report for the Agreement for Sale.pdf | 21 Nov 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale in accordance with Rera.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5-Hari.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Hari Q1 2024 25.pdf | 8 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hari Q1 2024 25.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 Hari FY 2024 25.PDF | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Hari Q1 2024 25.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 Hari FY 2024 25.PDF | 8 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hari Q1 2024 25.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5-Hari.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari-Form 1 -Q4-FY 23-24.pdf | 27 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari-Form 2 -Q4-FY 23-24.pdf | 27 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3-Q4 -Hari.pdf | 27 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Hari -Q3.pdf | 28 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Hari -Q3.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3-Hari I-Q3.PDF | 28 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari Phase I - Form 1 -Q3- 31-12-23.pdf | 26 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hari (FY-23-24).pdf | 26 Mar 2024 |
| Proforma of Agreement for saleFile: HARI - Sale Agreement - FINAL - 2024-01-19.pdf | 25 Jan 2024 |
| Proforma of Allotment letterFile: HARI - AI - Allotment Letter - FINAL - 2024-01-19.pdf | 25 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A - Q2 (1).pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A RERA Certificate - 2022-12-31 (1) (1).pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A - Q4.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A - Q1.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A RERA Certificate - 2022-06-30.pdf | 2 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Phase I - Form 2A RERA Certificate - 2022-09-30.pdf | 2 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari Phase I - Fprm 1 - Q2.pdf | 7 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari Phase I - Form 2 - Q2.pdf | 7 Dec 2023 |
| Certificates of CA (Form 3)File: VICPL Hari Form 3 Q2.PDF | 7 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari-Form 1 - RERA Certificate -31-03-2023.pdf | 12 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari Phase I - RERA Certificate - 30-06-2023.pdf | 12 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q4 - HARI.pdf | 8 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q1 - HARI.pdf | 8 Sep 2023 |
| Certificates of CA (Form 3)File: RERA Form 3 - Hari Q1.pdf | 5 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Hari Q4.pdf | 8 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: QUARTER 1(FY-22-23).pdf | 15 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: QUARTER 2(FY-22-23).pdf | 15 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: QUARTER 3(FY-22-23).pdf | 15 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3 -HARI FY 22-23 Q1.PDF | 15 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 157 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VKLAL HARI PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near .6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 264 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED
VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED has 2 registrations on MahaRERA, including VKLAL HARI PHASE I and VKLAL VISHNU PHASE I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if VKLAL HARI PHASE I is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VKLAL HARI PHASE I?
The registered promoter entity is VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VKLAL HARI PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VKLAL HARI PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VKLAL HARI PHASE I?
The professionals named in the filing: Architect: Jitendra Patel; Engineer: Jayesh Khanvilkar; Engineer: Arif Rupalwala; Chartered Accountant: Hardik Natvarlal Thakkar; Chartered Accountant: Bharat Dharamdas & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VKLAL HARI PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback