Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jun 2026Possession promisedno revision filed
24 of 27Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
32 of 169Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

Vivaan Essence is a Mixed Development project by NORTHSIDE PROPERTIES in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA11224/280223 on 28 Feb 2023. Possession is promised by 30 Jun 2026. 137 of the 169 units on this registration are recorded sold or booked, and 24 of 27 construction stages are filed complete.

At a glance

Project

  • NameVivaan Essence
  • TypeMixed Development
  • Location
    • FP No. 109
    • TPS No. 409/B
    • Sr. No. 463
    • Vivaan Essence
    • Nr. Vivaan Ixora
    • B/h. Sangath Prominence
    • S P Ring Road Zundal
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA11224/280223
  • ReraGenie IDRG-GJ-37126

Builder

  • NameNORTHSIDE PROPERTIES
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →
  • Past their filed date1

Key dates

this monthRegisteredFeb 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2026
  • Registered on28 Feb 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed43 files

Current status

81%137 of 169 units booked
100.0%Of the estimated cost spent so far

Figures as on 23 Feb 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C---54054
A---54761
B---54054

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 23 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

C99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing95%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing95%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing95%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 23 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes70%
Water supplyYes70%
Sewerage (chamber, lines, septic tank, STP)Yes70%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes70%
Street lightingYes70%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes70%
Water conservation, rain water harvestingYes70%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Fire fightingYes70%
Drinking water facilitiesYes70%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes70%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,096 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 31.25 cr
Cost incurredRs 31.25 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
ANARs 10.93 crRs 10.93 cr
CNARs 10.37 crRs 10.37 cr
BNARs 9.95 crRs 9.95 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSourabh A Verma
EngineerVajubhai C Kantariya

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA11224/280223 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)23 Feb 2026
Engineer's certificate (Form 2)23 Feb 2026
Engineer's certificate annexure23 Feb 2026
Accountant's certificate (Form 3)23 Feb 2026
Site photograph, C21 Feb 2026
Site photograph, A21 Feb 2026
Site photograph, B21 Feb 2026
RERA registration certificate28 Feb 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

81%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep Vivaan Essence on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmVivaan EssenceOther 182Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: NORTHSIDE PROPERTIES

NORTHSIDE PROPERTIES has 2 registrations on GujRERA, including Vivaan Essence and Vivaan Oliver. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if Vivaan Essence is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Vivaan Essence?

The registered promoter entity is NORTHSIDE PROPERTIES, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Vivaan Essence?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Vivaan Essence?

The professionals named in the filing: Architect: Sourabh A Verma; Engineer: Vajubhai C Kantariya. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vivaan Essence?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vivaan Essence. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vivaan Essence to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.