Home / Browse projects / Gandhinagar, Gujarat / ZUNDAL FP 123 TP 72

Valid until 14 Feb 2025 Mixed Development project

ZUNDAL FP 123 TP 72

By AHMEDABAD URBAN DEVELOPMENT AUTHORITY

RG-GJ-17323 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA08636/170621 · Last updated on GujRERA portal: 6 Oct 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months

Clear

  • Separate project account declared
Feb 2025Possession promisedmoved 12 months from the original
44 of 105Construction stages doneacross 15 buildings; furthest along: Internal walls, 95%
107 of 1,132Units unsoldnot recorded sold or booked
Jump to the 55 documents Report an error

ZUNDAL FP 123 TP 72 is a Mixed Development project by AHMEDABAD URBAN DEVELOPMENT AUTHORITY in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA08636/170621 on 17 Jun 2021. Possession is promised by 14 Feb 2025. The completion date has moved by 12 months from the original filing. 1,025 of the 1,132 units on this registration are recorded sold or booked, and 44 of 105 construction stages are filed complete.

At a glance

Project

  • NameZUNDAL FP 123 TP 72
  • TypeMixed Development
  • Location
    • T P 72 (TRAGAD-ZUNDAL)
    • FP 123
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA08636/170621
  • ReraGenie IDRG-GJ-17323

Builder

  • NameAHMEDABAD URBAN DEVELOPMENT AUTHORITY
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations3 more →
  • Past their filed date4

Key dates

this monthRegisteredJun 2021First promiseFeb 2024Revised toFeb 2025

Key facts

Registration and timeline

  • StatusValid until 14 Feb 2025
  • Registered on17 Jun 2021
  • Promised completion14 Feb 2025
  • Revised completionRevised to 14 Feb 2025 (originally 15 Feb 2024)
  • Buildings15 building records
  • Documents filed55 files

Current status

91%1025 of 1,132 units booked
66.5%Of the estimated cost spent so far

Figures as on 6 Oct 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A1------
BLOCK A2------
BLOCK C1---066
BLOCK C2---066
BLOCK 1+2---1120112
BLOCK 3+4---1120112
BLOCK 5+6---1120112
BLOCK 7+8---1120112
BLOCK 9+10---1120112
BLOCK 11+12---1120112
BLOCK 13+14---1120112
BLOCK 15---56056
BLOCK 16+17---1120112
BLOCK 18+19---1120112
BLOCK 20---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building15

As on 6 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 105 construction stages are filed complete across 15 buildings. The stage furthest along is Internal walls, at 95%.

BLOCK A123%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK A214%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK C169%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing10%
BLOCK C269%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing10%
BLOCK 1+277%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing30%
BLOCK 3+482%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats60%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing80%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
BLOCK 5+682%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
BLOCK 7+884%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats60%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
BLOCK 9+1084%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats60%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
BLOCK 11+1286%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing30%
BLOCK 13+1476%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing30%
BLOCK 1547%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats40%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing10%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK 16+1777%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats60%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing70%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing30%
BLOCK 18+1981%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats60%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing70%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
BLOCK 2081%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing80%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%

Progress on shared amenities19

As on 6 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area38,123 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 111.02 cr
Cost incurredRs 73.82 cr
Spent of the estimate66.49%
BuildingWingEstimatedIncurred
BLOCK A1NARs 7.40 crRs 4.92 cr
BLOCK A2NARs 7.40 crRs 4.92 cr
BLOCK C1NARs 7.40 crRs 4.92 cr
BLOCK C2NARs 7.40 crRs 4.92 cr
BLOCK 1+2NARs 7.40 crRs 4.92 cr
BLOCK 3+4NARs 7.40 crRs 4.92 cr
BLOCK 5+6NARs 7.40 crRs 4.92 cr
BLOCK 7+8NARs 7.40 crRs 4.92 cr
BLOCK 9+10NARs 7.40 crRs 4.92 cr
BLOCK 11+12NARs 7.40 crRs 4.92 cr
BLOCK 13+14NARs 7.40 crRs 4.92 cr
BLOCK 15NARs 7.40 crRs 4.92 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILENDRA CHAUHAN
EngineerDELF CONSULTING ENGINEERS (INDIA) PVT LTD

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA08636/170621 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)6 Oct 2023
Architect's certificate (Form 1)5 Oct 2023
Engineer's certificate (Form 2)5 Oct 2023
Engineer's certificate annexure5 Oct 2023
Site photograph, BLOCK A15 Oct 2023
Site photograph, BLOCK A25 Oct 2023
Site photograph, BLOCK C15 Oct 2023
Site photograph, BLOCK C25 Oct 2023
Site photograph, BLOCK 1+25 Oct 2023
Site photograph, BLOCK 3+45 Oct 2023
Site photograph, BLOCK 5+65 Oct 2023
Site photograph, BLOCK 7+85 Oct 2023
Site photograph, BLOCK 9+105 Oct 2023
Site photograph, BLOCK 11+125 Oct 2023
Site photograph, BLOCK 13+145 Oct 2023
Site photograph, BLOCK 155 Oct 2023
Site photograph, BLOCK 16+175 Oct 2023
Site photograph, BLOCK 18+195 Oct 2023
Site photograph, BLOCK 205 Oct 2023
RERA registration certificate17 Jun 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

91%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one moved by 12 months

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep ZUNDAL FP 123 TP 72 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmZUNDAL FP 123 TP 72Other 171Dot size: filed unitsN

Filed coordinates, straight-line distance. 171 registered projects within 2 km.

Builder: AHMEDABAD URBAN DEVELOPMENT AUTHORITY

AHMEDABAD URBAN DEVELOPMENT AUTHORITY has 4 registrations on GujRERA, including EWS Housing and EWS Aawas. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if ZUNDAL FP 123 TP 72 is delayed beyond 14 Feb 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ZUNDAL FP 123 TP 72?

The registered promoter entity is AHMEDABAD URBAN DEVELOPMENT AUTHORITY, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ZUNDAL FP 123 TP 72?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ZUNDAL FP 123 TP 72?

The professionals named in the filing: Architect: SHAILENDRA CHAUHAN; Engineer: DELF CONSULTING ENGINEERS (INDIA) PVT LTD. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZUNDAL FP 123 TP 72?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZUNDAL FP 123 TP 72. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZUNDAL FP 123 TP 72 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.