ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / VITHAI RESIDENCY PHASE I

Registered No litigation declared Residential / Group Housing project

VITHAI RESIDENCY PHASE I

By SHRINIVASA INFRA

RG-MH-31638 · RERA P51500079973 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

VITHAI RESIDENCY PHASE I is a Residential / Group Housing project by SHRINIVASA INFRA in Aurangabad, Maharashtra, registered with MahaRERA as P51500079973 on 9 Apr 2025. Possession is promised by 31 Dec 2029.

At a glance

Project

  • NameVITHAI RESIDENCY PHASE I
  • TypeResidential / Group Housing
  • Location
    • GUT NO 91 PART
    • PISADEVI
    • Aurangabad
    • 431008
  • Pincode431008
  • RERA no.P51500079973
  • ReraGenie IDRG-MH-31638

Builder

  • NameSHRINIVASA INFRA
  • Entity typePartnership

Key dates

this monthRegisteredApr 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Apr 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPE ROW HOUSENA20000
B TYPE RPW HOUSENA20000
C TYPE ROW HOUSENA20000
D TYPE ROW HOUSENA20000
E TYPE ROW HOUSENA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

A TYPE ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B TYPE RPW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C TYPE ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D TYPE ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E TYPE ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Open Space81
BuildingOpen SpaceTotal
A TYPE ROW HOUSE55
B TYPE RPW HOUSE2020
C TYPE ROW HOUSE2020
D TYPE ROW HOUSE2020
E TYPE ROW HOUSE1616

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ARUN VITTHAL KALEPisadeviAurangabad

Approvals and building plan

Permissible FSI2960.27
Proposed, not sanctioned2,960 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR GIRIJA PLOT NO 13 SECTOR 9 J 1 RAJMATA JIJAU CHOWK CIDCO AURANGABAD 431003

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANANJAY DOIFODE
EngineerPRADEEP V MOTE
Chartered Accountantv r jaju and company
PartnerRole in project
SHRINIVASA INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: form b.pdf8 Apr 2025
Other - TechnicalFile: appendix f.pdf27 Mar 2025
Building plan approvalFile: PLAN 01.pdf24 Feb 2025
Building plan approvalFile: PLAN 02.pdf24 Feb 2025
Building plan approvalFile: PLAN 03.pdf24 Feb 2025
Building plan approvalFile: PLAN 04.pdf24 Feb 2025
Building plan approvalFile: PLAN 05.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CEERTIFICATE.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 01.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 02.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 03.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 04.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 05.pdf24 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: BANK ACCOUNT FORMAT A.pdf24 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORM B BANK.pdf24 Feb 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE.pdf18 Jan 2025
Details of encumbrances concerned to FinanceFile: NO LETIGATION.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CIDCO PERMISSION.pdf18 Jan 2025
Other - LegalFile: MAIL.pdf18 Jan 2025
CERSAI detailsFile: CRESAI.pdf18 Jan 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE.pdf18 Jan 2025
Details of encumbrances concerned to LegalFile: NO LETIGATION.pdf18 Jan 2025
Layout approvalFile: LAY OUT.pdf6 Dec 2024
PAN CardFile: PAN.pdf6 Dec 2024
Copy of the legal title reportFile: SEARCH REPORT.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: LAY OUT.pdf6 Dec 2024
Proforma of Allotment letterFile: RERA ALLOTMENT LETTER 40 R.pdf6 Dec 2024
Declaration in FORM BFile: FORM B DEVELOPERS.pdf6 Dec 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCE.pdf6 Dec 2024
Deviation Report with respect to Allotment letterFile: NO DEVATION IN ALLOTMENT.pdf6 Dec 2024
Other - TechnicalFile: ANNEXTURE A.pdf6 Dec 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN ATS.pdf6 Dec 2024
Proforma of Agreement for saleFile: RERA agreement 40 R.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D I ARUN KALE.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D I ASHISH KALE.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D I MAHEDRA DHAKNE.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D I SACHIN PANDHARE.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D I VARSHA DHAKNE.pdf6 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: SECURED UNSECURED LOAN.pdf6 Dec 2024

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep VITHAI RESIDENCY PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PISADEVI1,400+ in Aurangabad

Builder: SHRINIVASA INFRA

SHRINIVASA INFRA has 1 registration on MahaRERA, including VITHAI RESIDENCY PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if VITHAI RESIDENCY PHASE I is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VITHAI RESIDENCY PHASE I?

The registered promoter entity is SHRINIVASA INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VITHAI RESIDENCY PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VITHAI RESIDENCY PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VITHAI RESIDENCY PHASE I?

The professionals named in the filing: Architect: DHANANJAY DOIFODE; Engineer: PRADEEP V MOTE; Chartered Accountant: v r jaju and company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VITHAI RESIDENCY PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VITHAI RESIDENCY PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VITHAI RESIDENCY PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.