Registered No litigation declared Residential / Group Housing project

VISTA RESIDENCES WING C TOWER 2

By VISTA DEVELOPERS MUMBAI LLP

RG-MH-18510 · RERA P51800076720 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Basement (if any), 85%
21 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

VISTA RESIDENCES WING C TOWER 2 is a Residential / Group Housing project by VISTA DEVELOPERS MUMBAI LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076720 on 21 Jun 2024. Possession is promised by 30 Jun 2029. 85 of the 106 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameVISTA RESIDENCES WING C TOWER 2
  • TypeResidential / Group Housing
  • Location
    • NEW LINK ROAD
    • VILLAGE GOREGAON
    • GOREGAON WEST
    • Goregaon
    • Borivali
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800076720
  • ReraGenie IDRG-MH-18510

Builder

  • NameVISTA DEVELOPERS MUMBAI LLP
  • Entity typePartnership
  • PartnersDOSTMOHAMMED HAJI VALLI PATEL, SAJID YAKUB PATEL
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jun 2024
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Current status

80%85 of 106 units booked
5.5%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VISTA RESIDENCES WING C TOWER -2NA35251060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 85%.

VISTA RESIDENCES WING C TOWER -2: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)78%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed192

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots192
Closed/Covered192

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area736 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Aug 2025
LandownerVillageDistrict
SILVER MOON CONSTRUCTION PRIVATE LIMITED-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12200.0
Proposed, not sanctioned11,505 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, JEHANGIR BUILDING, M G MARG, FORT, MUMBAI 400 001
Estimated costRs 172.62 cr
Cost incurredRs 9.43 cr
Work done5.46%
BuildingWingEstimatedIncurred
VISTA RESIDENCES WING C TOWER -2NARs 172.02 crRs 9.43 cr
-NARs 59.46 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYMS Consultants Limited
ArchitectD.H.PATEL
EngineerMUKHTAR AHMED SHAIKH
Chartered AccountantRitesh Savla & Associates
Chartered AccountantNEHALI & CO
PartnerRole in project
VISTA DEVELOPERS MUMBAI LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rera Architect Certificate D H Patel Form-1 Wing-C Tower-2 For Q1 Dt-06-04-26.pdf12 May 2026
Withdrawal Update Form 2File: Rera Engineer Certificate Mukhtar Shaikh Form-2 Wing-C Tower-2 For Q1 Dt-06-04-26.pdf12 May 2026
Withdrawal Update Form 3File: Signed CA Certificate Vista C March 26-.pdf12 May 2026
Withdrawal Update Form 1File: RERA Architect Certificate D H Patel Form-1 Wing-C Tower-2 For Q4 Dt-09-01-26.pdf17 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Form-2 Wing-C Tower-2 Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 3File: CA Certificate Vista C Dec 25- Signed.pdf17 Apr 2026
Withdrawal Update Form 1File: RERA Architect Certificate D H Patel Form-1 Wing-C Tower-2 For Q3 Dt-06-10-25.pdf16 Apr 2026
Withdrawal Update Form 2File: RERA -T2 October .pdf16 Apr 2026
Withdrawal Update Form 3File: CA Certificate Vista C Sept 25 - Signed.pdf16 Apr 2026
Withdrawal Update Form 1File: Rera Architect Certificate D H Patel Form-1 Wing-C Tower-2 For Q2 Dt-07-07-25.pdf4 Apr 2026
Withdrawal Update Form 2File: Rera Engineer Certificate Mukhtar Shaikh Form-2 Wing-C Tower-2 For Q2 Dt-07-07-25.pdf4 Apr 2026
Withdrawal Update Form 3File: Promoter Signed CA Certificate Vista C June 25.pdf4 Apr 2026
Form 1File: Rera Architect Certificate D H Patel Form-1 Wing-C Tower-2 Dt-05-07-24.pdf20 Sep 2025
Form 2File: Rera Engineer Certificate Mukhtar Shaikh Form-2 Wing-C Tower-2 Dt-06-07-24.pdf20 Sep 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) (9).pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure vista tower 2 30 SEP 2024_v1.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure vista tower 2 30 SEP 2024_v1.pdf20 Sep 2025
Form 1File: Vista Residences Tower 2_Architect Certificate_30-09-2024.pdf20 Sep 2025
Form 2File: Vista Residences Tower 2_Engineer Certificate_30-09-2024.pdf20 Sep 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3)- signed Sep 2024.pdf20 Sep 2025
Form 1File: vista Architect certificate wing c tower 2.pdf20 Sep 2025
Form 2File: Engineers Certificate-vista residences,wing-c.pdf20 Sep 2025
Form 3File: Signed_CA Certificate Vista C Tower 2dec'24-Signed.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold And Unsold Inventory Tower-2 Wing-C Dt-31-12-24.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold And Unsold Inventory Tower-2 Wing-C Dt-31-03-25.pdf20 Sep 2025
Form 1File: Architect Certificate Wing C Towe r2.pdf20 Sep 2025
Form 2File: Enginner certificate Wing- C Tower -2 pdf.pdf20 Sep 2025
Form 3File: Signed CA Certificate Vista C mar 25-Signed.pdf20 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: vista Architect certificate wing c tower 2.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate Vista C Tower 2dec'24-Signed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-vista residences,wing-c.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure vista tower 2 30 SEP 2024_v1.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 (Sep 2024, Tower 2).pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vista Residences Tower 2_Architect Certificate_30-09-2024.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vista Residences Tower 2_Engineer Certificate_30-09-2024.pdf23 Dec 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE Vista Residences Wing C Tower 2.pdf18 Jun 2024
Deviation Report with respect to model copy of AgreementFile: DEVEIATION REPORT OF AGREEMENT FOR SALE Vista Residences Wing C Tower 2.pdf18 Jun 2024
Other - LegalFile: Property Card of Road.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Wing C Tower 2.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Finance Vista.pdf15 Jun 2024
Details of encumbrances concerned to FinanceFile: No Encumdrances Legal Vista .pdf15 Jun 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Finance Vista.pdf15 Jun 2024
Details of encumbrances concerned to LegalFile: No Encumdrances Legal Vista .pdf15 Jun 2024
CERSAI detailsFile: No Cersai Vista.pdf15 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 2 Other - Technical (7).pdf14 Jun 2024
Declaration about Commencement CertificateFile: Format D Declaration CC.pdf14 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousres Vista Developers Mumbai LLP.pdf14 Jun 2024
Other - LegalFile: Declaration CTS No.pdf14 Jun 2024
Other - FinanceFile: Self Declaration Promoter.pdf14 Jun 2024
Other - FinanceFile: Declaration CTS No.pdf14 Jun 2024
Other - TechnicalFile: Declaration CTS No.pdf14 Jun 2024
Other - TechnicalFile: Explanation plot area.pdf14 Jun 2024
Other - TechnicalFile: CC Revalivation Approval Letter valid upto 12062025.pdf13 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A Declaration about Bank Account.pdf12 Jun 2024
Other - TechnicalFile: Annexure A Declaration cum Undertaking.pdf12 Jun 2024
Layout approvalFile: HIGHLIGHTED LAYOUT APPROVED PLAN.pdf11 Jun 2024
Building plan approvalFile: Amend letter 18052023.pdf11 Jun 2024
Building plan approvalFile: Amended Approval Letter dt 21122023.pdf11 Jun 2024
Building plan approvalFile: Amended letter 07062024.pdf11 Jun 2024
Building plan approvalFile: Amended Approval letter25102023.pdf11 Jun 2024
Building plan approvalFile: 1ST FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: 2ND FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: 3RD FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: 4TH FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: 6TH 7TH PODIUM FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: AMENITY FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: TYPICAL FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: REFUGE FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: TYPICAL LOWER FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: TYPICAL UPPER FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: PENT HOUSE LOWER FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: PENT HOUSE UPPER FLOOR PLAN.pdf11 Jun 2024
Building plan approvalFile: SECTION 1.pdf11 Jun 2024
Building plan approvalFile: SECTION 2.pdf11 Jun 2024
Copy of the legal title reportFile: Title certificate 01062024.pdf11 Jun 2024
Copy of Layout Approval (in case of layout)File: HIGHLIGHTED LAYOUT APPROVED PLAN.pdf11 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Amend letter 18052023.pdf11 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Approval Letter dt 21122023.pdf11 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended letter 07062024.pdf11 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Approval letter25102023.pdf11 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VISTA RESIDENCES WING D TOWER -3NEW LINK ROAD VILLAGE GOREGAON GOREGAON WEST MUMBAI 400102106OngoingDec 2028Dec 2028

How this compares with Mumbai Suburban

80%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISTA RESIDENCES WING C TOWER 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON WEST6,700+ in Mumbai Suburban

2 kmVISTA RESIDENCES WING C Completed 114Lapsed / revoked 63Abeyance 1Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 296 registered projects within 2 km.

Builder: VISTA DEVELOPERS MUMBAI LLP

VISTA DEVELOPERS MUMBAI LLP has 2 registrations on MahaRERA, including VISTA RESIDENCES WING-D TOWER -3 and VISTA RESIDENCES WING C TOWER 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VISTA RESIDENCES WING C TOWER 2 is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISTA RESIDENCES WING C TOWER 2?

The registered promoter entity is VISTA DEVELOPERS MUMBAI LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISTA RESIDENCES WING C TOWER 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISTA RESIDENCES WING C TOWER 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISTA RESIDENCES WING C TOWER 2?

The professionals named in the filing: Architect: YMS Consultants Limited; Architect: D.H.PATEL; Engineer: MUKHTAR AHMED SHAIKH; Chartered Accountant: Ritesh Savla & Associates; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISTA RESIDENCES WING C TOWER 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISTA RESIDENCES WING C TOWER 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISTA RESIDENCES WING C TOWER 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.