Home / Browse projects / Pune, Maharashtra / VISION SPACIO
VISION SPACIO
RG-MH-58310 · RERA P52100053856 · Last updated on MahaRERA portal: 1 Oct 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VISION SPACIO is a Others project by VISION CREATIVE ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100053856 on 5 Dec 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 123 of the 128 units on this registration are recorded sold or booked, and 51 of 55 construction stages are filed complete.
At a glance
Project
- NameVISION SPACIO
- TypeOthers
- Location
- DEHU - ALANDI ROAD
- DUDULGAON
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053856
- ReraGenie IDRG-MH-58310
Builder
- NameVISION CREATIVE ASSOCIATES
- Entity typePartnership
- PartnersJAYESHKUMAR SHANTILAL PATEL, NITESHKUMAR SURESHBHAI PATEL, MANISH SURESHBHAI PATEL, CHETANKUMAR AMBALAL PATEL, MAHENDRA SURESH THAKUR, RAMESHKUMAR VITTHALBHAI PATEL, JAYKUMAR BIPINBHAI PATEL
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Dec 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings5 building records
- Documents filed108 files
Current status
Figures as on 1 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 7 | 7 | 28 | 0 | 28 |
| B BUILDING | NA | 7 | 7 | 28 | 0 | 28 |
| C BUILDING | NA | 7 | 7 | 28 | 0 | 28 |
| D BUILDING | NA | 7 | 7 | 28 | 0 | 28 |
| E BUILDING | NA | 7 | 7 | 14 | 2 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 1 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
51 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
A BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D BUILDING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed64
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A BUILDING | 16 | 16 |
| B BUILDING | 16 | 16 |
| C BUILDING | 16 | 16 |
| D BUILDING | 16 | 16 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A BUILDING | NA | Rs 8.49 cr | Rs 7.91 cr |
| D BUILDING | NA | Rs 8.49 cr | Rs 7.91 cr |
| B BUILDING | NA | Rs 6.79 cr | Rs 6.32 cr |
| C BUILDING | NA | Rs 6.79 cr | Rs 6.32 cr |
| - | NA | Rs 3.64 cr | Rs 3.39 cr |
| E BUILDING | NA | Rs 3.39 cr | Rs 3.16 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS DREAM SPACE ARCHITECTS |
| Engineer | NILESH DIGHE & ASSOCIATES NILESH DIGHE |
| Engineer | SUNIL BABAL KHANDEKAR |
| Engineer | JIVAN SHINDE |
| Engineer | SAURABH VIJAY BENDALE |
| Engineer | SUNIL SATWAJI NIRMAL |
| Chartered Accountant | BANKIM PATEL & ASSOCIATES |
| Chartered Accountant | SNK & CO. |
| Chartered Accountant | PHP & ASSOCIATES |
| Partner | Role in project |
|---|---|
| VISION CREATIVE ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: 1 Sanction plan.pdf | 1 Oct 2025 |
| Building plan approvalFile: 2,3 Sanction plan.pdf | 1 Oct 2025 |
| Building plan approvalFile: 4,5 Sanction plan.pdf | 1 Oct 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A VISION SPACIO.pdf | 29 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 05 VCA.pdf | 16 Aug 2025 |
| Occupational CertificateFile: V Spacio Completion Cft 03072025.pdf | 31 Jul 2025 |
| Form 1File: FORM 1.pdf | 25 Jul 2025 |
| Form 2File: FORM 2.pdf | 25 Jul 2025 |
| Form 3File: Form 3.pdf | 25 Jul 2025 |
| Withdrawal Update Form 1File: V C ASSOCIATES FORM NO 01.pdf | 25 Jul 2025 |
| Withdrawal Update Form 2File: FORM 02.pdf | 25 Jul 2025 |
| Withdrawal Update Form 3File: V C ASSOCIATES FORM NO 03.pdf | 25 Jul 2025 |
| Form 5 (FY 2023-2024)File: FORM 05 23-2024.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: V C ASSOCIATES FORM NO 01.pdf | 17 Jul 2025 |
| Withdrawal Update Form 2File: FORM 02.pdf | 17 Jul 2025 |
| Withdrawal Update Form 3File: V C ASSOCIATES FORM NO 03.pdf | 17 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A (VISION CREATIVE ASSOCIATES).pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DEC-23 (VISION SPACIO).pdf | 22 May 2025 |
| Form 3File: FORM 3 MARCH-24.pdf | 22 May 2025 |
| Form 1File: FORM 1 ARCHITECT'S CERTIFICATE (Vision SPACIO) MARCH-24.pdf | 22 May 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE MARCH-24.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY MARCH-24 (VISION SPACIO).pdf | 22 May 2025 |
| Form 1File: FORM 1 ARCHITECT'S CERTIFICATE (Vision SPACIO) JUNE-24.pdf | 22 May 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE JUNE-24.pdf | 22 May 2025 |
| Form 3File: FORM 3 JUNE-24.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY JUNE-24 (VISION SPACIO).pdf | 22 May 2025 |
| Form 1File: FORM 1 ARCHITECT'S CERTIFICATE (Vision SPACIO) SEP-24.pdf | 22 May 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE SEP-24.pdf | 22 May 2025 |
| Form 3File: FORM 3 SEP-24.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY SEP-24 (VISION SPACIO).pdf | 22 May 2025 |
| Form 1File: FORM 1 ARCHITECT'S CERTIFICATE (Vision SPACIO) DEC-24.pdf | 22 May 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE DEC-24.pdf | 22 May 2025 |
| Form 3File: FORM 3 DEC-24.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DEC-24 (VISION SPACIO).pdf | 22 May 2025 |
| Form 1File: FORM 1 ARCHITECT'S CERTIFICATE (Vision SPACIO) MARCH-25.pdf | 22 May 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE MARCH-25.pdf | 22 May 2025 |
| Form 3File: FORM 3 MARCH-25.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY MARCH-25(VISION SPACIO).pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY (VISION CREATIVE ASSOCIATE).pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost And Fund withdrawal 31 3 2025.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work FORM 01.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 01 V C ASSOCIATES.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VISION SPACIO FORM NO 3.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 02 V C ASSOCIATES.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: V C ASSOCIATES.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SPESIO SOLD UNSOLD INVENTORY LIST.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost And Fund withdrawal.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA SPECIO.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD INVENTORY (VISION SPACIO).pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost And Fund withdrawal.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate on Quality Assurance Specio.pdf | 18 May 2024 |
| Disclosure of sold/ booked inventoryFile: VISION CREATIVE ASSOCIATES_ SOLD UNSOLD INVENTORY.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost Vision Spacio Updated.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work Vision Spacio.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project -Vision Spacio.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Engineer’s Certificate on Cost Incurred on Project -Vision Spacio.pdf | 15 Apr 2024 |
| Building plan approvalFile: 1 Building Plan Approval.pdf | 28 Mar 2024 |
| Building plan approvalFile: 2 Building Plan Approval.pdf | 28 Mar 2024 |
| Building plan approvalFile: 3 Building Plan Approval.pdf | 28 Mar 2024 |
| Building plan approvalFile: 4 Building Plan Approval.pdf | 28 Mar 2024 |
| Building plan approvalFile: 5 Building Plan Approval.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval.pdf | 28 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_Vision Spacio 1.pdf | 28 Mar 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE_VISION SPACIO.pdf | 28 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECT.pdf | 16 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 5 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 5 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold booked inventory.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf | 5 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf | 28 Dec 2023 |
| Proforma of Allotment letterFile: 1 Proforma of Allotment Letter.pdf | 30 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
Keep VISION SPACIO on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DUDULGAON13,700+ in Pune
Filed coordinates, straight-line distance. 143 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: VISION CREATIVE ASSOCIATES
VISION CREATIVE ASSOCIATES has 1 registration on MahaRERA, including VISION SPACIO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VISION SPACIO is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VISION SPACIO?
The registered promoter entity is VISION CREATIVE ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VISION SPACIO?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VISION SPACIO?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VISION SPACIO?
The professionals named in the filing: Architect: MS DREAM SPACE ARCHITECTS; Engineer: NILESH DIGHE & ASSOCIATES NILESH DIGHE; Engineer: SUNIL BABAL KHANDEKAR; Engineer: JIVAN SHINDE; Engineer: SAURABH VIJAY BENDALE; Engineer: SUNIL SATWAJI NIRMAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VISION SPACIO?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback