ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / VINI Solitaire

Completed No litigation declared Others project

VINI Solitaire

By Ami Corporation

RG-MH-30519 · RERA P51800030579 · Last updated on MahaRERA portal: 12 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

VINI Solitaire is a Others project by Ami Corporation in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030579 on 1 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameVINI Solitaire
  • TypeOthers
  • Location
    • L. T. Road
    • Dahisar West
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800030579
  • ReraGenie IDRG-MH-30519

Builder

  • NameAmi Corporation
  • Entity typeOthers
  • Named personNipun I. Thakkar
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINI SolitaireNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

VINI Solitaire: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area868 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2732.22
Proposed, not sanctioned2,148 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH SHAH
EngineerHIREN TANNA
Chartered AccountantRMA & CO Chartered Accountants
Chartered AccountantMRP & Associates Chartered Accountants
PartnerRole in project
Ami Corporation-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 May 2024

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AMI CORPORATION-FORM-5-FY 23 24.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-05-31-FORM 1 - ARC CERTIFICATE_1.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024-06-1-FORM 2_ENGINEER CERTIFICATE.pdf3 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: 2024-06-03-FORM 4-ARCHITECT COMPLETION CERTIFICATE.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240601 RERA Form 2_VINI SOLITAIRE_COMP.pdf2 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2427501_OC_signed.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3_MAR 24_Q4 23-24_compressed.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR MAR QTR 2024.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 - ENG CERTIFICATE FOR MARCH QTR 2024.pdf2 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ami Corp_RERA Form 2A_fy 22 23_compressed.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE FOR DEC QTR 23_compressed.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR DEC QTR 2023.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 - ENG CERTIFICATE FOR DEC QTR 2023.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE FOR SEP QTR 2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR SEP QTR 2023.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 - ENG CERTIFICATE FOR SEPT QTR 2023.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 5- Vini solitaire Mar-23.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5- Vini solitaire Mar-23.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE FOR JUN QTR 2023_OPT.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR JUNE QTR 2023.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 - ENG CERTIFICATE FOR JUNE QTR 2023.pdf22 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE FOR MAR QTR 2023.pdf19 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR MAR QTR 2023.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 - ENG CERTIFICATE FOR MARCH QTR 2023.pdf17 Apr 2023
Building plan approvalFile: 2023-03-06 2364454Amendletter_signed.pdf12 Apr 2023
Building plan approvalFile: 2023-03-06 Approved Drawing_Amended IOD_pg 1-compressed.pdf12 Apr 2023
Building plan approvalFile: 2023-03-06 Approved Drawing_Amended IOD_pg 2-compressed.pdf12 Apr 2023
Building plan approvalFile: 2023-03-06 Approved Drawing_Amended IOD_pg 3.pdf12 Apr 2023
Building plan approvalFile: 2023-03-06 Approved Drawing_Amended IOD_pg 4.pdf12 Apr 2023
Building plan approvalFile: 2023-03-06 Approved Drawing_Amended IOD_pg 5.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2023-03-06 2364454Amendletter_signed.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2023-03-06 Approved Drawing_Amended IOD_pg 1-compressed.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2023-03-06 Approved Drawing_Amended IOD_pg 2-compressed.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2023-03-06 Approved Drawing_Amended IOD_pg 3.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2023-03-06 Approved Drawing_Amended IOD_pg 4.pdf12 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2023-03-06 Approved Drawing_Amended IOD_pg 5.pdf12 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 2369594_FurtherCC_signed_230317_214253.pdf12 Apr 2023
Declaration about Commencement CertificateFile: 2023-04-12 Declaration about Commencement Certificate.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_31 Mar 23.pdf12 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ami - VINI SOLITAIRE-FORM 5-MAR22.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account.pdf12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - CA CERTIFICATE FOR DEC QTR 2022 - Copy_opt_comp.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR DEC QTR 2022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 230221 RERA FORM 2 - ENG CERTIFICATE FOR DEC QTR 2022.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ami - VINI SOLITAIRE-FORM 5-MAR22.pdf21 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR SEP QTR 2022.pdf1 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 221007 RERA FORM 2 - ENG CERTIFICATE FOR SEP QTR 2022.pdf1 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2022 05 27 RERA FORM 2A - SITE SUPERVISOR - FY 2021-22 - comp.pdf1 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - CA CERTIFICATE FOR SEP QTR 2022_opt.pdf1 Nov 2022
Proforma of Agreement for saleFile: DRAFT FORMAT FOR AGREEMENT FOR SALE_VINI SOLITAIRE.pdf1 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - ARC CERTIFICATE FOR JUN QTR 2022.pdf20 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 220812 RERA FORM 2 - ENG CERTIFICATE FOR JUN QTR 2022.pdf20 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022-08-20 FORM 3 - CA CERTIFICATE FOR JUNE QTR 2022_compressed.pdf20 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 220211 RERA FORM 2 - ENG CERTIFICATE FOR DEC QTR 2021 - rev.pdf18 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 220611 RERA FORM 2 - ENG CERTIFICATE FOR MAR QTR 2022 - rev.pdf18 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2022 05 27 RERA FORM 2A - SITE SUPERVISOR - FY 2021-22 - comp.pdf18 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2022 05 27 RERA FORM 2A - SITE SUPERVISOR - FY 2021-22 - comp.pdf18 Jun 2022
CERSAI detailsFile: CERSAI.pdf18 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE FOR DEC QTR 2021-comp.pdf18 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE FOR MAR QTR 2022-comp.pdf18 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022 05 30 RERA FORM 1 - ARC CERTIFICATE - DEC 21 QTR - COMP.pdf15 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022 06 11 RERA FORM 1 - ARC CERTIFICATE - MAR 22 QTR.pdf15 Jun 2022
Disclosure of sold/ booked inventoryFile: 2022 01 31 DISCLOSURE OF SOLD INVENTORY.pdf1 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2021-10-21 RERA FORM 1_ARC CERTIFICATE FOR SEPT QTR 21.pdf29 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2021-10-16 RERA FORM 2_ENG CERTIFICATE FOR SEPT QTR 21.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: 2021 11 30 Disclosure of sold-booked inventory.pdf29 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 10 21 RERA FORM 3_CA CERTIFICATE FOR SEPT QTR 21_COMP.pdf29 Nov 2021
Layout approvalFile: 2021-06-10 IOD Letter Issue signed.pdf24 Aug 2021
Building plan approvalFile: 2021-06-10 IOD Letter Issue signed.pdf24 Aug 2021
Building plan approvalFile: Provisional_Fire_NOC_Certificate-compressed.pdf24 Aug 2021
Building plan approvalFile: 2021 08 10 Railway NOC Letter.pdf24 Aug 2021
Copy of the legal title reportFile: 2021 08 24 RD Title Certificate Ad Pratik Shah-compressed.pdf24 Aug 2021
Details of encumbrancesFile: 2021 08 24 No Encumbrance Certificate.pdf24 Aug 2021
Copy of Layout Approval (in case of layout)File: 2021-06-10 IOD Letter Issue signed.pdf24 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 2021-06-10 IOD Letter Issue signed.pdf24 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Provisional_Fire_NOC_Certificate-compressed.pdf24 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 2021 08 10 Railway NOC Letter.pdf24 Aug 2021
Declaration about Commencement CertificateFile: 2021 08 20 Declarataion about commencement certificate.pdf24 Aug 2021
Declaration in FORM BFile: 2021 08 23 Form B-Affidavit Cum Declaration.pdf24 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2021 08 23 RERA FORM 1 - ARC CERTIFICATE.pdf24 Aug 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VINI EleganceBorivali West32CompletedMar 2014Nov 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINI Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahisar West6,700+ in Mumbai Suburban

Builder: Ami Corporation

Ami Corporation has 1 registration on MahaRERA, including VINI Solitaire. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VINI Solitaire is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINI Solitaire?

The registered promoter entity is Ami Corporation, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINI Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VINI Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINI Solitaire?

The professionals named in the filing: Architect: MANISH SHAH; Engineer: HIREN TANNA; Chartered Accountant: RMA & CO Chartered Accountants; Chartered Accountant: MRP & Associates Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINI Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINI Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINI Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.