Home / Browse projects / Raigarh, Maharashtra / VIJAYSHREE APARTMENT

Registered No litigation declared Mixed project

VIJAYSHREE APARTMENT

RG-MH-75776 · RERA PM1270002601733 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
Jump to the 4 documents Report an error

VIJAYSHREE APARTMENT is a Mixed project by RITESH FUTARMAL DOSHI in Raigarh, Maharashtra, registered with MahaRERA as PM1270002601733 on 1 Sep 2026. Possession is promised by 30 Sep 2027.

At a glance

Project

  • NameVIJAYSHREE APARTMENT
  • TypeMixed
  • Location
    • ANGAR ALI
    • NEAR JOGESHWARI TEMPLE
    • Nagothane
    • Roha
    • Raigarh
    • 402106
  • Pincode402106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1270002601733
  • ReraGenie IDRG-MH-75776

Builder

  • NameRITESH FUTARMAL DOSHI
  • Entity typeIndividual
  • GSTIN27ACVPD1712D2ZV
  • Track record2 past projects →

Key dates

todayRegisteredSep 2026PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2026
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed4 files

Current status

0%0 of 104 units booked

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIJAYSHREE APARTMENT BUILDING 2A7624024
VIJAYSHREE APARTMENT BUILDING 2B8728028
VIJAYSHREE APARTMENT BUILDING 2C8728028
VIJAYSHREE APARTMENT BUILDING 1NA6620424

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.

VIJAYSHREE APARTMENT BUILDING 2 · wing A43%
ActivityProgress
Excavation95%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VIJAYSHREE APARTMENT BUILDING 2 · wing B43%
ActivityProgress
Excavation95%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VIJAYSHREE APARTMENT BUILDING 2 · wing C43%
ActivityProgress
Excavation95%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VIJAYSHREE APARTMENT BUILDING 132%
ActivityProgress
Excavation90%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor95%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Stack Parking133
BuildingStack ParkingTotal
VIJAYSHREE APARTMENT BUILDING 2 A3333
VIJAYSHREE APARTMENT BUILDING 2 B3434
VIJAYSHREE APARTMENT BUILDING 2 C3434
VIJAYSHREE APARTMENT BUILDING 13232

Land and ownership4

MahaRERA does not publish landowner contact details.

Land area2,527 sq m
Promoter owns the landNo
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2026
LandownerVillageDistrict
ASMITA NANDU DESHPANDENagothaneRaigarh
NEHA SHAILENDRA DESHPANDENagothaneRaigarh
PRITAM LALIT GUPTENagothaneRaigarh
NIVEDITA NAGESH KULKARNIChendhreRaigarh

Approvals and building plan

Permissible FSI5796.84
Proposed, not sanctioned5,786 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.

Separate project accountDeclared
Bank branchGROUND FLOOR, SHREE SIDHI VINAYAK CO-OP HSG.SOCIETY, BEHIND SIDDHI VINAYAK TEMPLE,BRAHMIN ALI, ALIBAG, RAIGAD - 402 201.

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANAJIT MOHITE
EngineerMAHESH VISHNU CHAVAN
Chartered AccountantHARSHAL JAIN
PartnerRole in project
RITESH FUTARMAL DOSHI-

Complaints filed with MahaRERA

No complaints on record against this registration.

Documents filed4

As listed on the registration. The files themselves are on the MahaRERA portal.

DocumentUploaded
Plan11 Jul 2026
Plan21 Jul 2026
CC1 Jul 2026
Declaration cum undertaking 1 Jul 2026

Promoter's earlier projects1

As disclosed by the promoter in this filing.

1 not delivered
ProjectStatusPromisedDeliveredLitigation
Shree Sadguru Krupa Mandavkar ComplexOngoingJun 2026Not deliveredNo

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
19%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,896 Raigarh projects on ReraGenie, from their own filings.

Keep VIJAYSHREE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR JOGESHWARI TEMPLE5,896 in Raigarh

Builder: RITESH FUTARMAL DOSHI

RITESH FUTARMAL DOSHI has 3 registrations on MahaRERA, including MADHUBAN RESIDENCY and Shree Sadguru Krupa Mandavkar Complex. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if VIJAYSHREE APARTMENT is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIJAYSHREE APARTMENT?

The registered promoter entity is RITESH FUTARMAL DOSHI, an individual as per the filing. Its GSTIN 27ACVPD1712D2ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIJAYSHREE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIJAYSHREE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIJAYSHREE APARTMENT?

The professionals named in the filing: Architect: MANAJIT MOHITE; Engineer: MAHESH VISHNU CHAVAN; Chartered Accountant: HARSHAL JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIJAYSHREE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Planning to buy here? The Rs 499 buyer report adds red flags, the progress-versus-promise read, this promoter's other registrations and what the filed documents say, plus a ZIP of every document on the filing. It includes the Rs 299 project watch free for 90 days: an email in plain words every time this project's filing changes. See a real sample report before you buy. Get the buyer report · Rs 499
Studying this micro-market? The developer project analysis maps every registration within 5 km of this project from filed coordinates, reads what the market absorbs and what competes, prices the parcel, and takes the promoter's whole book apart, facts with their N, never a verdict. See a complete sample first. Get the developer analysis · Rs 2,999

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIJAYSHREE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TULJAI TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.