Home / Browse projects / Raigarh, Maharashtra / AMBA RESIDENCY

Registered No litigation declared Residential / Group Housing project

AMBA RESIDENCY

By N R Builders And Developers

RG-MH-92378 · RERA P52000032513 · Last updated on MahaRERA portal: 26 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
32 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

AMBA RESIDENCY is a Residential / Group Housing project by N R Builders And Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000032513 on 10 Jan 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 9 of the 41 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameAMBA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • HIGH WAY ST STAND LINK ROAD
    • SHANTI NAGAR
    • Nagothane
    • Roha
    • Raigarh
    • 402106
  • Pincode402106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000032513
  • ReraGenie IDRG-MH-92378

Builder

  • NameN R Builders And Developers
  • Entity typePartnership
  • PartnersFarhan Nisar Ali Chaudhary, Farheen Farhan Chaudhary

Key dates

this monthRegisteredJan 2022First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2022
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2025)
  • Buildings2 building records
  • Documents filed68 files

Current status

22%9 of 41 units booked
48.2%Work done, per cost certificate

Figures as on 26 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING CNA5311011
BUILDING DNA9730030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

BUILDING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D24%
ActivityProgress
Excavation90%
Basement (if any)85%
Podiums (if any)0%
Plinth85%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered10
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
BUILDING C325
BUILDING D729

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,513 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025
LandownerVillageDistrict
SUDHAKAR GANPAT JAVATENagothaneRaigarh
UMAKANT DAMODAR JAMBEKARNagothaneRaigarh
TANVEE VINOD SAWANTNagothaneRaigarh

Approvals and building plan

Sanctioning authorityRaigad
Permissible FSI3405.0
Proposed, not sanctioned600 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON
Estimated costRs 4.46 cr
Cost incurredRs 2.15 cr
Work done48.23%
BuildingWingEstimatedIncurred
BUILDING DNARs 3.08 crRs 1.25 cr
BUILDING CNARs 1.13 crRs 45.70 lakh
-NARs 25.00 lakhRs 44.76 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManijit Mohite
ArchitectManajit S Mohite
EngineerR K Randhave & Associate
EngineerNeeraj R Gupta
Chartered AccountantCA Dnyaneshwar Gople
Chartered AccountantCA Vivek Lahoti
Chartered AccountantGanesh sunil Mandlecha
PartnerRole in project
N R Builders And Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25022620006Dec 2025 → Dec 2028

Reason as filed by the promoterThe project “Amba Residency” comprises two buildings, namely Building C and Building D. Building C has been completed successfully through booking receipts and agreement amounts received from purchasers. However, Building D could not be completed within the stipulated time due to the following reasons: • Availability / shortage of materials and labour due to the project being situated in a village-based location at Nagothane. • Inadequate project cash flow • Market absorption lower than anticipated • The project is situated in a village-based location at Nagothane, where demand for residential

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 24-25 (2).pdf26 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf25 Feb 2026
Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf24 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf24 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf24 Feb 2026
Withdrawal Update Form 1File: FORM 1 SCAN 30092025.pdf18 Feb 2026
Withdrawal Update Form 1File: form 1 Q3.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q 2.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q 3.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 Q2 180226.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 18022026 copressed.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf13 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q1.pdf13 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf13 Feb 2026
Form 1File: form 1 Q 4 2024-25.pdf19 Nov 2025
Form 2File: Form 2 Engineer Certificate Q4.pdf19 Nov 2025
Form 3File: form 3 with sign_11zon (1).pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled..pdf19 Nov 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: img20250407_12400372 (1).pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2) Form 1 30 09 2023.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3) Form 1 31 12 2023.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4) Form 1 31 03 2024.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5) Form 1 30 06 2024.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6) Form 1 30 09 2024.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7) Form 1 31 12 2024.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1) Form 1 30 06 2023.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 004) Form 3 31 03 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 007) Form 3 31 12 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 006) Form 3 30 09 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 005) Form 3 30 06 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 003) Form 3 31 12 2023.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 002) Form 3 30 09 2023.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 001) Form 3 30 06 2023.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01) Form 2 30 06 2023.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02) Form 2 30 09 2023.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03) Form 2 31 12 2023.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04) Form 2 31 03 2024.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05) Form 2 30 06 2024.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06) Form 2 30 09 2024.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07) Form 2 31 12 2024.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: old Form 1Amba Residency_compressed.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amba_compressed.pdf20 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 211221.pdf20 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf20 May 2023
Layout approvalFile: IOD_compressed.pdf3 Jan 2022
Layout approvalFile: Plan_compressed.pdf3 Jan 2022
Copy of Layout Approval (in case of layout)File: IOD_compressed.pdf3 Jan 2022
Copy of Layout Approval (in case of layout)File: Plan_compressed.pdf3 Jan 2022
Layout approvalFile: Layout_compressed.pdf25 Dec 2021
Building plan approvalFile: Layout_compressed.pdf25 Dec 2021
Copy of the legal title reportFile: legal title report2648_compressed.pdf25 Dec 2021
Details of encumbrancesFile: Encumbrances.pdf25 Dec 2021
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf25 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Layout_compressed.pdf25 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-1-6_compressed.pdf25 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-7-12_compressed.pdf25 Dec 2021
Declaration about Commencement CertificateFile: Commencement Declaration.pdf25 Dec 2021
Declaration in FORM BFile: Form B_compressed.pdf25 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architct's certificate_compressed.pdf25 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_compressed.pdf25 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200225880849_For_Asset_Based_Search_14_12_2021_17_08_52_258.pdf25 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NR BUILDER_compressed.pdf25 Dec 2021
Proforma of Allotment letterFile: Provisional Allotment letter_compressed.pdf25 Dec 2021
Proforma of Allotment letterFile: Sale Agreement.pdf25 Dec 2021
PAN CardFile: PAN Card.pdf24 Dec 2021

How this compares with Raigarh

22%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMBA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHANTI NAGAR5,900+ in Raigarh

2 kmAMBA RESIDENCYLapsed / revoked 4Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: N R Builders And Developers

N R Builders And Developers has 1 registration on MahaRERA, including AMBA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if AMBA RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMBA RESIDENCY?

The registered promoter entity is N R Builders And Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMBA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMBA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMBA RESIDENCY?

The professionals named in the filing: Architect: Manijit Mohite; Architect: Manajit S Mohite; Engineer: R K Randhave & Associate; Engineer: Neeraj R Gupta; Chartered Accountant: CA Dnyaneshwar Gople; Chartered Accountant: CA Vivek Lahoti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMBA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMBA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMBA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.