Home / Browse projects / Mumbai Suburban, Maharashtra / Verona
Verona
RG-MH-09448 · RERA P51800003040 · Last updated on MahaRERA portal: 26 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- 84 complaints at MahaRERA
- Completion date moved by 53 months
- 2 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Verona is a Residential / Group Housing project by Sahyog Homes Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003040 on 4 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 53 months from the original filing. 199 of the 290 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 84 complaints are on record with the regulator.
At a glance
Project
- NameVerona
- TypeResidential / Group Housing
- Location
- Relief Road
- Oshiwara
- Andheri
- Mumbai Suburban
- 400102
- Pincode400102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003040
- ReraGenie IDRG-MH-09448
Builder
- NameSahyog Homes Limited
- Entity typeCompany
- DirectorsRajiv Goel, Yogesh Jadhav, Rahul Jain
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Jul 2023)
- Buildings1 building record
- Documents filed197 files
Current status
Figures as on 26 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Verona S3-S4 | NA | 42 | 38 | 290 | 0 | 290 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.
Verona S3-S4: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 26 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | - |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed268
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sankalp Siddhi Developers Pvt Ltd | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Verona S3-S4 | NA | Rs 229.19 cr | Rs 155.98 cr |
| - | NA | Rs 8.81 cr | - |
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultants Pvt Ltd |
| Architect | Sagar Gogri |
| Architect | Pradip Deshmukh |
| Architect | Creation TOWN PLANNER & ARCHITECT ENGINEERS |
| Engineer | Rajesh Laxman Patil |
| Engineer | Ramboll India Pvt. Ltd. |
| Engineer | Mohan Khot |
| Engineer | Mohan Khot Project Mangement Cosultant |
| Chartered Accountant | V.P. Agrawal & Co. |
| Chartered Accountant | Shah & Bhosale |
| Partner | Role in project |
|---|---|
| Sahyog Homes Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReasons for delay: The list containing the reasons for delay in completion of project is enclosed herewith and summarised as under: 1) Delay due to reasons beyond the control of promoter viz. delay in getting permissions from the concerned authorities. 2) Covid -19 situation and financial crises due to it 3) Project is supposed to be completed by Sankalp Siddhi Developers Pvt.Ltd. in lieu of consideration as per Development Agreement dated 9.07.2012. Sankalps failed to fulfill its obligation under the Development Agreement dated 9.07.2012.
Reason as filed by the promoterAs per Order No. 40 Dated 27/12/2022 we are applying for Extension without majority consents of the allottees. As per HEARING DATED 3rd March 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/12/2027. The order is Other Tab for your reference
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 965/2014 | High Court Bombay | Ongoing |
| 6437/2015 | High Court Bombay | Ongoing |
| 1213/2011 | City Civil Court Dindoshi | Ongoing |
| 407/2012 | Metropolitan Magistrate Andheri | Not heard |
| 8026, 8027, 8028/2018 | Revenue and Textile Minister Mantralaya | For filing Reply |
| 8026, 8027, 8028/2018 | Revenue and Textile Minister Mantralaya | Ongoing |
Complaints filed with MahaRERA84
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000194046 | MRS. ASIFA MOINUDDIN SHAIKH | SAHYOG HOMES LIMITED | 28/09/2020 |
| CC006000000194806 | Sahyog Homes Limited | Shashi Udhas | 04/11/2020 |
| CC006000000194807 | Sahyog Homes Limited | Eshan Aggarwal Through Guardian Manav Agarwal | 04/11/2020 |
| CC006000000194808 | Sahyog Homes Limited | Shashi Udhas | 04/11/2020 |
| CC006000000194809 | Sahyog Homes Limited | Manav Aggarwal | 04/11/2020 |
| CC006000000194810 | Sahyog Homes Limited | Shirin Agarwal & Anr | 04/11/2020 |
| CC006000000194812 | Sahyog Homes Limited | Manav Aggarwal | 04/11/2020 |
| CC006000000194814 | Sahyog Homes Limited | Shashi Udhas | 04/11/2020 |
| CC006000000194815 | Sahyog Homes Limited | Manav Aggarwal | 04/11/2020 |
| CC006000000197403 | Sahyog Homes Limited | Qaeed Kuwajerwala through CA Husein Kuwajerwala | 24/06/2021 |
| CC006000000197404 | Sahyog Homes Limited | Karimi Nuruddin Mantri & Anr. through CA Husein Kuwajerwala | 24/06/2021 |
| CC006000000197405 | Sahyog Homes Limited | Nazira Hasnain Lala & anr. through Husein Kuwajerwala | 24/06/2021 |
| CC006000000197406 | Sahyog Homes Limited | Husein Kuwajerwala & Anr | 24/06/2021 |
| CC006000000197407 | Sahyog Homes Limited | Husein Kuwajerwala and anr. | 24/06/2021 |
| CC006000000197408 | Sahyog Homes Limited | Karimi Nuruddin Mantri & Anr. through CA Husein Kuwajerwala | 24/06/2021 |
| CC006000000197409 | Sahyog Homes Limited | Nafisa Gulamabbas Kapasi & Anr | 24/06/2021 |
| CC006000000056265 | MR. KRISHNA KISHORE AGARWAL AND VEENA AGARWAL | SAHYOG HOMES LIMITED | 01/10/2018 |
| CC006000000055409 | Mr. Shrivatsa Moraje & Mrs. Nayana Rao | Sahyog Homes Ltd. | 16/12/2019 |
| CC006000000056251 | Arif Ansari | Sahyog Homes Ltd | 19/09/2018 |
| CC006000000057399 | Vishal Jain | Sahyog Homes Limited | 22/12/2018 |
| CC006000000057433 | Viloo Keki Italia | Sahyog Homes Limited | 25/12/2018 |
| CC006000000057751 | Prabhudesai Sulabha | Keshav Porwal | 24/01/2019 |
| CC006000000397946 | sulabha shridhar prabhudesai | Sahyog Homes Ltd | 25/10/2023 |
| CC006000000398028 | sulabha shridhar prabhudesai | Sahyog Homes | 31/10/2023 |
| CC006000000057760 | SHIRIN AGARWAL | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000057761 | ESHAN AGGARWAL | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000057767 | MANAV AGGARWAL | SAHYOG HOMES | 28/01/2019 |
| CC006000000057844 | MANAV AGGARWAL | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000057804 | MANAV AGGARWAL | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000057843 | SHASHI UDHAS | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000057848 | SHASHI UDHAS | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000057849 | SHASHI UDHAS | SAHYOG HOMES LIMITED | 28/01/2019 |
| CC006000000068144 | Nafisa Gulamabbas Kapasi | Sahyog Homes | 03/03/2019 |
| CC006000000058131 | Qaeed Kuwajerwala | Sahyog Homes Limited | 03/03/2019 |
| CC006000000058137 | Husein K Kuwajerwala | Sahyog Homes Limited | 03/03/2019 |
| CC006000000058139 | Tina Kumar Darire | Sahyog Homes Limited | 03/03/2019 |
| CC006000000058140 | Karimi Nuruddin Mantri | Sahyog Homes Limited | 03/03/2019 |
| CC006000000058134 | Hina Karim Mantri | Sahyog Homes Limited | 03/03/2019 |
| CC006000000058136 | Nazira Hasnain Lala | Sahyog Homes Limited | 05/03/2019 |
| CC006000000058142 | Zeenat Z Mantri | Sahyog homes Limited | 05/03/2019 |
| CC006000000068141 | Sonam Kapoor | Sahyog Homes Limited | 03/03/2019 |
| CC006000000068143 | Rhea Kapoor | Sahyoig Homes Limited | 03/03/2019 |
| CC006000000068164 | Narendra Maganlal Upadhyay | M/s Sahyog homes & M/s Sankalp Siddhi Pvt Ltd | 03/05/2019 |
| CC006000000192380 | SUSHIL RAJPAL | SAHYOG HOMES LIMITED | 01/02/2020 |
| CC006000000192464 | Vikas Bhauwala | Sahyog Homes Limited | 19/02/2020 |
| CC006000000197518 | Sahyog Homes Limited | Manav Agarwal | 06/07/2021 |
| CC006000000197519 | Sahyog Homes Limited | Manav Agarwal | 06/07/2021 |
| CC006000000197521 | Sahyog Homes Limited | Shirin Agarwal | 06/07/2021 |
| CC006000000197522 | Sahyog Homes Limited | Manav Agarwal | 06/07/2021 |
| CC006000000197523 | Sahyog Homes Limited | Eshan Agarwal | 06/07/2021 |
| CC006000000197524 | Sahyog Homes Limited | Shashi Udhas | 06/07/2021 |
| CC006000000197525 | Sahyog Homes Limited | Pradeep Udhas | 06/07/2021 |
| CC006000000197526 | Sahyog Homes Limited | Shashi Udhas | 06/07/2021 |
| CC006000000197527 | Sahyog Homes Limited | Sonam Kapoor | 06/07/2021 |
| CC006000000197528 | Sahyog Homes Limited | Rhea Kapoor | 06/07/2021 |
| CC006000000197529 | Sahyog Homes Limited | Zeenat Mantri | 06/07/2021 |
| CC006000000197115 | Hafiza Nisarahmed Tamboli | SAHYOG HOMES LIMITED | 01/06/2021 |
| CC006000000198580 | Rohit Khanna | Sahyog Homes Limited | 07/10/2021 |
| CC006000000198876 | Ramawatar Sharma | Sahyog Homes Limited | 15/11/2021 |
| CC006000000198995 | Santosh Kumar Jain | Sahyog Homes Limited | 07/12/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed197
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 197 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2019-2020)File: Form 2A - 2019 - 2020.pdf | 26 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 2024 - 2025.pdf | 26 Mar 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - 2020 - 2021.pdf | 26 Mar 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - 2021 - 2022.pdf | 26 Mar 2026 |
| Form 2A (FY 2022-2023)File: Form - 2A - 2022 - 2023.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Sep 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Sep 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Jun 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Sep 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Sep 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certi_Verona_30062024.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Sep 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Sep 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Jun 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Sep 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Sep 2025.pdf | 6 Mar 2026 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory VERONA.pdf | 21 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate_30032025.pdf | 16 Apr 2025 |
| Certificates of CA (Form 3)File: Form-3 CA Certificate.pdf | 16 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineer Certificate.pdf | 16 Apr 2025 |
| Declaration in FORM BFile: 6 (1).pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5 18-19.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 Dec 2024.pdf | 19 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 19 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 19 Mar 2025 |
| OtherFile: Order_RC_340 of 2025_Extension_Verona.pdf | 7 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2024.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sept 2024.pdf | 2 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Quantity assurance certificate FY 2023-24.pdf | 2 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - CA Certificate.pdf | 2 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ VERONA_07102024.pdf | 14 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3_ C A Certificate 10102024.pdf | 14 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ VERONA_07102024.pdf | 14 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3_ C A Certificate 10102024.pdf | 14 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certi Verona_30062024.pdf | 6 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certi_Verona_30062024.pdf | 6 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 C A Certificate - Verona.pdf | 6 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect Certificate.pdf | 8 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate.pdf | 8 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3- CA Certificate.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 dt 010424 (VERONA).pdf | 2 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 VERONA_31122023.pdf | 10 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2_Verona_S3_S4.pdf | 10 Jan 2024 |
| Certificates of CA (Form 3)File: CA Cert Form3 VERONA.pdf | 10 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 10 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 10 Oct 2023 |
| Certificates of CA (Form 3)File: CA Certificate_1.pdf | 10 Oct 2023 |
| OtherFile: Declaration_Co-Promoter 10102023.pdf | 10 Oct 2023 |
| Declaration in FORM BFile: Declaration Form B New.pdf | 1 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A.pdf | 1 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: D.pdf | 1 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 7 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 7 Jul 2023 |
| Certificates of CA (Form 3)File: Verona CA Certi.pdf | 7 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VERONA_Form 1 Architect Certificate.pdf | 7 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Verona.pdf | 7 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 - Verona.pdf | 7 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory - Verona.pdf | 18 Jan 2023 |
| Proforma of Agreement for saleFile: Verona-AFS Proforma as on 17-01-2023.pdf | 18 Jan 2023 |
| Proforma of Allotment letterFile: Allotment_VERONA.pdf | 18 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration Commencement Certificate_Verona.pdf | 16 Jan 2023 |
| PAN CardFile: SHL-PAN CARD (1).pdf | 12 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf | 12 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 197 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Verona on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Oshiwara6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 323 registered projects within 2 km.
ROSWALT ZAIDEN
A S HIGHTECH LLP
Dream Signature
Prime Realtors
Sayba Noor
Star Raises
Gurukrupa Ekam
GURUKRUPA REALCON INFRABUILD LLP
The Westpark Phase-1
WESTPARK DEVELOPERS PRIVATE LIMITED
Kalpataru Hrushikesh
Kalpataru Townships Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Sahyog Homes Limited
Sahyog Homes Limited has 2 registrations on MahaRERA, including Oshi and Verona. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Verona is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Verona?
The registered promoter entity is Sahyog Homes Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Verona?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Verona?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Verona?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Verona?
The professionals named in the filing: Architect: Ellora Project Consultants Pvt Ltd; Architect: Sagar Gogri; Architect: Pradip Deshmukh; Architect: Creation TOWN PLANNER & ARCHITECT ENGINEERS; Engineer: Rajesh Laxman Patil; Engineer: Ramboll India Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Verona?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback