ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / VERDURA

Completed No litigation declared Residential / Group Housing project

VERDURA

By SHUBHASHREE DEVELOPERS

RG-MH-15338 · RERA P52100024065 · Last updated on MahaRERA portal: 12 Mar 2020

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
36 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

VERDURA is a Residential / Group Housing project by SHUBHASHREE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100024065 on 17 Jan 2020. The registration is recorded completed; possession was promised by 9 Mar 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVERDURA
  • TypeResidential / Group Housing
  • Location
    • MOSHI ALANDI ROAD
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024065
  • ReraGenie IDRG-MH-15338

Builder

  • NameSHUBHASHREE DEVELOPERS
  • Entity typePartnership
  • PartnersNILESH SURYAKANT SHELAR, UMESH SURYAKANT SHELAR
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2020PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jan 2020
  • Promised completion9 Mar 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA80000
B BUILDINGNA80000
C BUILDINGNA80000
D BuildingNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes75%

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered65
Open Space59
BuildingClosed/CoveredOpen SpaceTotal
A BUILDING141428
B BUILDING121628
C BUILDING141428
D Building251540

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
UMESH SURYAKANT SHELARPimpale SaudagarPune
NILESH SURYAKANT SHELARPimpale SaudagarPune

Approvals and building plan

Permissible FSI5893.1
Proposed, not sanctioned5,893 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJACHAK CHEMBER GOVIND YASHADA CHOWK PIMPLE SAUDAGAR PUNE 411027

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS K ASSOCIATES
ArchitectVILAS J YELE & ASSOCIATES
EngineerSUBODH MANDAL
Chartered AccountantSARANG RAJHANS & CO
PartnerRole in project
SHUBHASHREE DEVELOPERS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503054Akash BhangareSHUBHASHREE DEVELOPERS31/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Dec 2019

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Copy of the legal title reportFile: RERA SEARCH REPORT 2020.pdf12 Mar 2020
Layout approvalFile: 7yhjkkll; 0001.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0001.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0002.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0003.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0004.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0005.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0006.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0007.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0008.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0009.pdf29 Feb 2020
Building plan approvalFile: 7yhjkkll; 0010.pdf29 Feb 2020
Copy of Layout Approval (in case of layout)File: 7yhjkkll; 0001.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0001.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0002.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0003.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0004.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0005.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0006.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0007.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0008.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0009.pdf29 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7yhjkkll; 0010.pdf29 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: SKM_C224e20022816100.pdf29 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VERDURA - ARCHITECT CERTIFICATE 2.pdf28 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECTURALCOMPLETIONCERTIFICATEVERDURAABC.pdf28 Dec 2019
Details of encumbrancesFile: ENCUMBRANCE2019.pdf18 Dec 2019
Proforma of Allotment letterFile: verdura allotment a sample for rera.pdf14 Dec 2019
Proforma of Allotment letterFile: Verdura allotment B for rera.pdf14 Dec 2019
Proforma of Allotment letterFile: Agreement - Draft - Verdura - RERA.pdf14 Dec 2019
OtherFile: DEED OF TDR.pdf14 Dec 2019
OtherFile: POWER OF ATTERNY TDR.pdf14 Dec 2019
OtherFile: DEVELOPEMENT AGREEMENT.pdf14 Dec 2019
OtherFile: POWER OF ATTERNY.pdf14 Dec 2019
OtherFile: Partnership Deed.pdf14 Dec 2019
Layout approvalFile: 6ttgh 0001.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0001.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0002.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0003.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0004.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0005.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0006.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0007.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0008.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0009.pdf13 Dec 2019
Building plan approvalFile: 6ttgh 0010.pdf13 Dec 2019
Copy of the legal title reportFile: SEARCH TITLE REPORT 1989 TO 2018.pdf13 Dec 2019
Copy of Layout Approval (in case of layout)File: 6ttgh 0001.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0001.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0002.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0003.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0004.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0005.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0006.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0007.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0008.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0009.pdf13 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 6ttgh 0010.pdf13 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENT CERTIFICATE 2018.pdf13 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FOR D.pdf13 Dec 2019
OtherFile: PCMC COMPLETION CERTIFICATE - VERDURA ABC.pdf13 Dec 2019
PAN CardFile: SHUBHASHREEDEVELOPERSPAN.pdf12 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf12 Dec 2019
Declaration in FORM BFile: DECLARATIONFORMB.pdf12 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURALCOMPLETIONCERTIFICATEVERDURAABC.pdf12 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2A.pdf12 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM3.pdf12 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PCMC COMPLETION CERTIFICATE - VERDURA ABC.pdf12 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECTURALCOMPLETIONCERTIFICATEVERDURAABC.pdf12 Dec 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: VERDURA A B C SOCIETY CERTIFICATE.pdf12 Dec 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VERDURA A B CGAT NO 71 MOSHI ALANDI ROAD SAINATH CHOWK DUDULGAON PUNE 41210584CompletedAug 2017May 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VERDURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmVERDURACompleted 54Lapsed / revoked 25Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 159 registered projects within 2 km.

Builder: SHUBHASHREE DEVELOPERS

SHUBHASHREE DEVELOPERS has 1 registration on MahaRERA, including VERDURA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VERDURA is delayed beyond 9 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VERDURA?

The registered promoter entity is SHUBHASHREE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VERDURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VERDURA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VERDURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VERDURA?

The professionals named in the filing: Architect: S K ASSOCIATES; Architect: VILAS J YELE & ASSOCIATES; Engineer: SUBODH MANDAL; Chartered Accountant: SARANG RAJHANS & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VERDURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VERDURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VERDURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.