ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Ventila Park

Registration lapsed No litigation declared Others project

Ventila Park

By Krushnarang Builders

RG-MH-15340 · RERA P52100023794 · Last updated on MahaRERA portal: 13 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 11 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2025Possession promised11 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
1Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

Ventila Park is a Others project by Krushnarang Builders in Pune, Maharashtra, registered with MahaRERA as P52100023794 on 6 Jan 2020. Possession was promised by 30 Nov 2025 and is now 11 months past that date. The completion date has moved by 11 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVentila Park
  • TypeOthers
  • Location
    • Colony no 16 Main road
    • Ganeshnagar Bopkhel
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411031
  • Pincode411031
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023794
  • ReraGenie IDRG-MH-15340

Builder

  • NameKrushnarang Builders
  • Entity typePartnership
  • PartnersAmit Tukaram Zapke, Nanda Tukaram Zapke

Key dates

11 months past promisethis monthRegisteredJan 2020First promiseDec 2024Revised toNov 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Jan 2020
  • Promised completion30 Nov 2025
  • Revised completionRevised to 30 Nov 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed135 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Building A: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered38
Open Space2

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,507 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sande Sajidali SirajuddinPimpri Chinchawad (M Corp.)Pune
Murlidhar Somaji Ghule and othersPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI2788.36
Proposed, not sanctioned2,787 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishrantwadi Pune 411015

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Atul Ranpise
EngineerSumit Sakharam Zapke
Chartered AccountantCA Yogesh Kabra and Co
PartnerRole in project
Krushnarang Builders-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025847Dec 2024 → Nov 2025

Reason as filed by the promoter1. Project is 95% completed. 2. 51% consent obtained from allottees. 3. Consent for next 5 months only. 4. Form B uploaded in other tab No.1 and in main Application. 5.PERT Chart for the remaining completion work is uploaded in Other Tab No. 2 and also in Other Technical Tab of Main Application. 6. QPR till date are updated. 7. Explanatory Note for Delay in project Completion Uploaded in Other Tab No. 3

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502918Shivam Kumar SinghKrushnarang Builders20/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Krushnarang Builders Declaration Certificate.pdf13 Jun 2025
Other - TechnicalFile: PERT Chart- Construction Schedule.pdf13 Jun 2025
Other - TechnicalFile: COVERING LETTER.pdf13 Jun 2025
Disclosure of sold/ booked inventoryFile: 0soldunsold31032020.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 1soldunsold31032021.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 2soldunsold31122021.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 3soldunsold30062022.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 4soldunsold30092022.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 5soldunsold31122022.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 6soldunsold31032023.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 7soldunsold30062023.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 8soldunsold30092023.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 9soldunsold31122023.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 10soldunsold31032024.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 11soldunsold30062024.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 12soldunsold30092024.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: 13soldunsold31032025.pdf12 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1FORM531032020.pdf11 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2FORM531032021.pdf11 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 3FORM531032022.pdf11 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 4FORM531032023.pdf11 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5FORM531032024.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2Form131032021.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16Form131032025.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15Form131122024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14Form130092024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13Form130062024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12Form131032024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11Form131122023.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10Form130092023.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8Form131032023.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7Form131122022.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6Form130092022.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5Form130062022.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4Form131032022.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3Form131122021.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1Form131032020.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9Form130062023.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Not Applicability of Form 5.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13Form231122024.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14Form231032025.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A31032020.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Not Applicability of Form 5.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A31032021.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A31032022.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A31032023.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A31032024.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10form330062024.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 0form331032020.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM331032025.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11form330092024.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9form331032024.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8form330122023.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7form330092023.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6form330062023.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5form331032023.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4form331122022.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3form330062022.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2form331122021.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1form331032021.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6FORM231032023.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12FORM230092024.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11FORM230062024.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10FORM231032024.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9FORM231122023.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8FORM230092023.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7FORM230062023.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05FORM230092022.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4FORM230062022.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3FORM231032022.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2FORM231122021.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1FORM231032021.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 0FORM231032020.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5FORM231122022.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: 12FORM230092024.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: 11FORM230062024.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: 10FORM231032024.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: 9FORM231122023.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: 8FORM230092023.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: 7FORM230062023.pdf17 May 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 11 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ventila Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ganeshnagar Bopkhel13,700+ in Pune

2 kmVentila ParkCompleted 116Lapsed / revoked 116Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Krushnarang Builders

Krushnarang Builders has 1 registration on MahaRERA, including Ventila Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Ventila Park shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ventila Park is delayed beyond 30 Nov 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ventila Park?

The registered promoter entity is Krushnarang Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ventila Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ventila Park?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ventila Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ventila Park?

The professionals named in the filing: Architect: Architect Atul Ranpise; Engineer: Sumit Sakharam Zapke; Chartered Accountant: CA Yogesh Kabra and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ventila Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ventila Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ventila Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.