Home / Browse projects / Mumbai Suburban, Maharashtra / Veena Insignia

Registered No litigation declared Mixed project

Veena Insignia

By Veena Infratech LLP

RG-MH-18643 · RERA PM1180002400053 · Last updated on MahaRERA portal: 11 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 50.00 crore secured on the land, in favour of THAR COMMERCIAL FINANCE PRIVATE LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedmoved 24 months from the original
3 of 10Construction stages donefurthest along: Slabs of Super Structure, 10%
177 of 217Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Veena Insignia is a Mixed project by Veena Infratech LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002400053 on 7 Oct 2024. Possession is promised by 31 Mar 2030. The completion date has moved by 24 months from the original filing. 40 of the 217 units on this registration are recorded sold or booked, and 3 of 10 construction stages are filed complete.

At a glance

Project

  • NameVeena Insignia
  • TypeMixed
  • Location
    • New Link Road
    • Adarsh Nagar
    • Others
    • CTSO Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1180002400053
  • ReraGenie IDRG-MH-18643

Builder

  • NameVeena Infratech LLP
  • Entity typeCompany
  • LLPINAAF-3304
  • GSTIN27AAMFN6585H1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHaresh Natwarlal Sanghavi, Veena Haresh Sanghvi, Avni Haresh Sanghvi, VD Infratech Pvt Ltd, Veena Realcon Private Limited, Veena Infratech LLP
  • Designated PartnerNikunj Haresh Sanghavi
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2024First promiseMar 2028Revised toMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Oct 2024
  • Promised completion31 Mar 2030
  • Revised completionRevised to 31 Mar 2030 (originally 31 Mar 2028)
  • Buildings1 building record
  • Documents filed121 files

Current status

18%40 of 217 units booked
21.1%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA36312107217

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Building 1: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed314

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots314
Closed/Covered314

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,740 sq m
Land owned byNot the promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTHAR COMMERCIAL FINANCE PRIVATE LIMITED
Secured amountRs 50.00 crore
Declared on11 Aug 2026

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI22783.3
Proposed, not sanctioned22,783 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE RATNAKAR BANK LTD,NO.006, GROUND FLOOR,GALAXY ARCADE, 10 M.G. ROAD,VILE PARLE (EAST), MUMBAI – 400 057.
Estimated costRs 232.54 cr
Cost incurredRs 49.18 cr
Work done21.15%
BuildingWingEstimatedIncurred
Building 1NARs 208.88 crRs 49.18 cr
-NARs 23.65 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEllora Project Consultants Private Limited
EngineerRajeev Ranjan
Chartered AccountantVivek Thar
Chartered AccountantM/s Bathiya & Associates LLP
PartnerRole in project
Veena Infratech LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07062501453Mar 2028 → Mar 2030

Reason as filed by the promoterSite mobilization delay not involving any government bottleneck

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Sep 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Insignia 30062026.pdf11 Aug 2026
Withdrawal Update Form 1File: Form-1 Insignia 30062026.pdf11 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf11 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf11 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate Insignia.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 June 2026 Insignia 2mb.pdf11 Aug 2026
Withdrawal Update Form 1File: FORM 1 dsc.pdf29 Apr 2026
Withdrawal Update Form 2File: RR insignia DSc form 2.pdf29 Apr 2026
Withdrawal Update Form 3File: Form3DSC.pdf29 Apr 2026
Withdrawal Update Form 1File: Form-1 Veena Insignia Q3 2025-26.pdf3 Feb 2026
Withdrawal Update Form 2File: Form-2 Veena Insignia Q3 2025-26.pdf3 Feb 2026
Withdrawal Update Form 3File: Form-3 Veena Insignia Q3 2025-26.pdf3 Feb 2026
Withdrawal Update Form 1File: Form-1 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 1File: Form-1 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 1File: Form-1 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 2File: Form-2 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 2File: Form-2 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 2File: Form-2 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 3File: Form-3 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 3File: Form-3 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 3File: Form-3 Veena Insignia Q3 2025-26.pdf31 Jan 2026
Withdrawal Update Form 1File: Form1 Oshiwara Vishakha Sept 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2 Q2 Insignia.pdf24 Dec 2025
Withdrawal Update Form 3File: form 3final signed revised.pdf24 Dec 2025
Withdrawal Update Form 1File: Form1.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 Q4compressed.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 InsigniaQ4c.pdf18 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 VILLP 24-25.pdf22 May 2025
Form 1File: Form 1 Insignia.pdf20 May 2025
Form 2File: Form 2 Q4 - Insignia.pdf20 May 2025
Form 3File: Form 3 Insignia compressed.pdf20 May 2025
Form 1File: Form-1 Oshiwara Vishakha.pdf16 May 2025
Form 2File: Form 2.pdf16 May 2025
Form 3File: Form-3.pdf16 May 2025
Disclosure of Sold and Booked InventoryFile: unsold invebtory.pdf16 May 2025
Promoter to upload the certified copy of the Form 3File: Form 3 Veena Insignia_compressed.pdf19 Feb 2025
Engineer's Certificate (Form 2)File: Form 2- Veena insignia.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Feb 2025
Other - TechnicalFile: E deck.pdf30 Sep 2024
Other - TechnicalFile: 5 podium.pdf30 Sep 2024
Other - TechnicalFile: 4podium.pdf30 Sep 2024
Other - TechnicalFile: 3 podium.pdf30 Sep 2024
Other - TechnicalFile: 2podium.pdf30 Sep 2024
Other - TechnicalFile: FORM B society.pdf28 Sep 2024
Other - TechnicalFile: podium.pdf28 Sep 2024
Other - TechnicalFile: 07_VISHAKHA SECTION.pdf28 Sep 2024
Other - TechnicalFile: 05_VISHAKHA 34TH FLOOR.pdf28 Sep 2024
Other - TechnicalFile: 04_VISHAKHA TYPICAL FLOOR.pdf28 Sep 2024
Other - TechnicalFile: 03_VISHAKHA 7TH FLOOR.pdf28 Sep 2024
Other - TechnicalFile: 02_VISHAKHA 1ST FLOOR.pdf28 Sep 2024
Other - TechnicalFile: 06_VISHAKHA 35TH FLOOR.pdf28 Sep 2024
Building plan approvalFile: 01_VISHAKHA GROUND FLOOR.pdf23 Sep 2024
Layout approvalFile: 08_LAYOUT PLAN.pdf21 Sep 2024
Architect's Certificate (Form 1)File: form 1veena insignia.pdf10 Sep 2024
Promoter to upload the certified copy of the Form 3File: V. Infra LLP Form 3 Rehab.pdf10 Sep 2024
Other - FinanceFile: Veena Infratech LLP CA Declaration for RERA.pdf10 Sep 2024
PAN CardFile: PAN.pdf9 Sep 2024
Layout approvalFile: 08_LAYOUT PLAN.pdf4 Sep 2024
Building plan approvalFile: 01_VISHAKHA GROUND FLOOR.pdf4 Sep 2024
Layout ApprovalFile: 08_LAYOUT PLAN.pdf4 Sep 2024
Engineer's Certificate (Form 2)File: Form 2 Signed Q1.pdf4 Sep 2024
Building Plan ApprovalFile: 01_VISHAKHA GROUND FLOOR.pdf4 Sep 2024
Other - LegalFile: Disclosure of Int Veena Realcon.pdf3 Sep 2024
Other - LegalFile: Disclosure of Int Avni.pdf3 Sep 2024
Other - LegalFile: Disclosure of Int Haresh.pdf3 Sep 2024
Other - LegalFile: Disclosure of Int Nikunj.pdf3 Sep 2024
Other - LegalFile: Disclosure of Int VD Infra.pdf3 Sep 2024
Other - LegalFile: Disclosure of Int Veena Infratech LLP.pdf3 Sep 2024
Format A as per order 56/2024File: Format A - LLP.pdf3 Sep 2024
Other - TechnicalFile: Declaration Cum Undertaking order 50.pdf3 Sep 2024
Format B as per order 56/2024File: FORMAT B.pdf3 Sep 2024
Disclosure of Secured/ unsecured Finance availedFile: Secured Unsecured Finance.pdf3 Sep 2024
Legal Title reportFile: TITLE certificate aug 24.pdf2 Sep 2024
Declaration Form BFile: form B promotor.pdf2 Sep 2024
Other - TechnicalFile: form B promotor.pdf2 Sep 2024
Copy of the legal title reportFile: TITLE certificate aug 24.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised form 3compresse.pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance.pdf7 Aug 2024
CERSAI detailsFile: Undertaking Cum Declaration.pdf7 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Letter Format A.pdf7 Aug 2024

How this compares with Mumbai Suburban

18%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veena Insignia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adarsh Nagar6,700+ in Mumbai Suburban

2 kmVeena InsigniaCompleted 124Lapsed / revoked 71Abeyance 1Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 332 registered projects within 2 km.

Builder: Veena Infratech LLP

Veena Infratech LLP has 2 registrations on MahaRERA, including Veena Insignia and Veena Imperia. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Veena Insignia is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veena Insignia?

The registered promoter entity is Veena Infratech LLP, a company as per the filing. Its LLPIN AAF-3304 and GSTIN 27AAMFN6585H1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veena Insignia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Veena Insignia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Veena Insignia?

The professionals named in the filing: Architect: Ellora Project Consultants Private Limited; Engineer: Rajeev Ranjan; Chartered Accountant: Vivek Thar; Chartered Accountant: M/s Bathiya & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Veena Insignia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veena Insignia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veena Insignia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.