Home / Browse projects / Pune, Maharashtra / VASTUSHREE

Registration lapsed No litigation declared Others project

VASTUSHREE

By VASTU CONSTRUCTION

RG-MH-16181 · RERA P52100025388 · Last updated on MahaRERA portal: 15 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 32 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2024Possession promised32 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 50%
1Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

VASTUSHREE is a Others project by VASTU CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100025388 on 15 May 2020. Possession was promised by 12 Feb 2024 and is now 32 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVASTUSHREE
  • TypeOthers
  • Location
    • KATRAJ
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100025388
  • ReraGenie IDRG-MH-16181

Builder

  • NameVASTU CONSTRUCTION
  • Entity typePartnership
  • PartnersRANGRAO VITTHALRAO SAWARE, ANILKUMAR KASHINATH JINDE, NARSING SHRIHARI PATIL, RAHUL MAHESH DARYANANI
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

32 months past promisethis monthRegisteredMay 2020PromisedFeb 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 May 2020
  • Promised completion12 Feb 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VASTUSHRINA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

VASTUSHRI: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes25%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered104

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
VASTU CONSTRUCTIONPune (M Corp.)Pune
RANGRAO VITTHALRAO SAWAREPune (M Corp.)Pune
ANILKUMAR KASHINATH JINDEPune (M Corp.)Pune
GAUTAM SHANKAR KATEPune (M Corp.)Pune
AKSHAY ANILKUMAR JINDEPune (M Corp.)Pune
BHAGYESH SHRIPAD MANEPune (M Corp.)Pune
NARSING SHRIHARI PATILPune (M Corp.)Pune
RAHUL MAHESH DARYANANIPune (M Corp.)Pune
NAMDEO NATTHJI BARAPATREPune (M Corp.)Pune
HEMANT PRABHAKAR DEVDHARPune (M Corp.)Pune
PALAK PRAKASH PATILPune (M Corp.)Pune
RAVINDRA SANDIPAN SHINDEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI13736.15
Proposed, not sanctioned13,370 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRABHALAXMAN , ELITE APARTMENT, PLOT NO-6,VALVEKAR NABAR,PARVATI PUNE-411009

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUSHIKESH MAMARDE
EngineerAMUP BHANDARI
Chartered AccountantCA SACHIN THERADE
PartnerRole in project
VASTU CONSTRUCTION-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500054Ramchandra Sopanrao NimbalkarVASTU CONSTRUCTION06/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Jan 2025

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form_4.pdf15 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY CERTIFICATE.pdf15 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form_4.pdf14 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Annexure_E_Form_4_Vastushree.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM -5 VASTUSGREE- FOR 22-23.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA 31-12-2022.pdf13 Feb 2023
Proforma of Agreement for saleFile: FORM 3 CA 31-12-2022.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CERTIFICATES 25-01-2023.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE25-01-2023.pdf1 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A ENGG CERTIFICATE FOR QUALITY ASSURANCE-25-01-2023.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA 31-12-2022.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA 31-12-2022.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEW CA FORMS 14-03-2022_compressed (3).pdf23 Mar 2022
OtherFile: FORMAT C.pdf3 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: 1 CC-Vastushree-15-3-2021-compressed.pdf19 Jan 2022
Declaration about Commencement CertificateFile: Format D Rera 17-12-2021.pdf19 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf19 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold_inventory-Rera-17-12-2021.pdf19 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 15-05-2020 TO 31-12-2021_compressed.pdf19 Jan 2022
OtherFile: ALLOTEES CONSENT IN FORM C.pdf19 Jan 2022
Building plan approvalFile: 22-Master_Layout_compressed.pdf10 Oct 2021
Building plan approvalFile: 23-Master_Layout_1_compressed (1).pdf10 Oct 2021
Building plan approvalFile: 25-Amalgamation_Layout_compressed.pdf10 Oct 2021
Building plan approvalFile: 19-Building_Floor_Plan_Ground_compressed (1).pdf10 Oct 2021
Building plan approvalFile: 20-Building_Floor_Plan_odd_Floors_compressed.pdf10 Oct 2021
Building plan approvalFile: 21-Building_Floor_Plan_8th_Floor_compressed.pdf10 Oct 2021
Building plan approvalFile: 24-Section___Elevation_plan_compressed.pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 22-Master_Layout_compressed.pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 23-Master_Layout_1_compressed (1).pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 25-Amalgamation_Layout_compressed.pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 19-Building_Floor_Plan_Ground_compressed (1).pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 20-Building_Floor_Plan_odd_Floors_compressed.pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 21-Building_Floor_Plan_8th_Floor_compressed.pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 24-Section___Elevation_plan_compressed.pdf10 Oct 2021
Details of encumbrancesFile: encumbrance_letter.pdf13 May 2020
Declaration in FORM BFile: FORM B WITH DATE OF COMPLETION.pdf13 May 2020
Details of encumbrancesFile: LEGAL REPORT ADV-1.pdf22 Mar 2020
Details of encumbrancesFile: LEGAL REPORT ADV-2.pdf22 Mar 2020
Details of encumbrancesFile: LEGAL REPORT ADV-3.pdf22 Mar 2020
Details of encumbrancesFile: LEGAL REPORT ADV-4.pdf22 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf22 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VASTU RERA_compressed.pdf22 Mar 2020
Declaration in FORM BFile: ALL FORM B_compressed.pdf16 Mar 2020
Layout approvalFile: MASTER PLAN FOR LAYOUT SACT2-2_compressed.pdf13 Mar 2020
Layout approvalFile: LAY OUT 1 -1-2.pdf13 Mar 2020
Building plan approvalFile: GROUND - FIRST FLOOR 2-5compressed.pdf13 Mar 2020
Building plan approvalFile: 2,3,4,5, FLOOR PLAN 3-5compressed.pdf13 Mar 2020
Building plan approvalFile: 6 - T PLAN 4-5compressed.pdf13 Mar 2020
Building plan approvalFile: SECTION ELEVATION PLAN 5-5_compressed.pdf13 Mar 2020
PAN CardFile: VASTU PAN.pdf13 Mar 2020
PAN CardFile: PARTNERSHIP DEED2_compressed.pdf13 Mar 2020
Copy of the legal title reportFile: LEGAL REPORT ADV-1.pdf13 Mar 2020
Copy of the legal title reportFile: LEGAL REPORT ADV-2.pdf13 Mar 2020
Copy of the legal title reportFile: LEGAL REPORT ADV-3.pdf13 Mar 2020
Copy of the legal title reportFile: LEGAL REPORT ADV-4.pdf13 Mar 2020
Copy of the legal title reportFile: 7-12_compressed.pdf13 Mar 2020
Copy of Layout Approval (in case of layout)File: MASTER PLAN FOR LAYOUT SACT2-2_compressed.pdf13 Mar 2020
Copy of Layout Approval (in case of layout)File: LAY OUT 1 -1-2.pdf13 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: GROUND - FIRST FLOOR 2-5compressed.pdf13 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: 2,3,4,5, FLOOR PLAN 3-5compressed.pdf13 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: 6 - T PLAN 4-5compressed.pdf13 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: SECTION ELEVATION PLAN 5-5_compressed.pdf13 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE PMC.pdf13 Mar 2020
Declaration in FORM BFile: FORM B.pdf13 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf13 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A ENGG CERTIFICATE QUALITY ASSURANCE.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-1.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-2.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-3.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-4.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-5.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-6.pdf13 Mar 2020
Proforma of Allotment letterFile: VASTU RERA AGREEMENT_compressed-7.pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-1_compressed.pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-2_compressed.pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-3_compressed.pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-4_compressed.pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-5_compressed (1).pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-6_compressed.pdf13 Mar 2020
OtherFile: DEVELOPMENT DEED-7_compressed.pdf13 Mar 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VASTUSHREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAJ13,700+ in Pune

Builder: VASTU CONSTRUCTION

VASTU CONSTRUCTION has 3 registrations on MahaRERA, including VASTUSHREE and VASTUSHREE PHASE-1. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that VASTUSHREE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VASTUSHREE is delayed beyond 12 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VASTUSHREE?

The registered promoter entity is VASTU CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VASTUSHREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VASTUSHREE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VASTUSHREE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VASTUSHREE?

The professionals named in the filing: Architect: RUSHIKESH MAMARDE; Engineer: AMUP BHANDARI; Chartered Accountant: CA SACHIN THERADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASTUSHREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASTUSHREE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASTUSHREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.