Completed No litigation declared Others project

Vasavi 4

By Vasavi Developers

RG-MH-03604 · RERA P50900031338 · Last updated on MahaRERA portal: 2 Jan 2024

Source: official MahaRERA filing

Red flags

  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.
Jul 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Vasavi 4 is a Others project by Vasavi Developers in Chandrapur, Maharashtra, registered with MahaRERA as P50900031338 on 23 Oct 2021. The registration is recorded completed; possession was promised by 31 Jul 2022.

At a glance

Project

  • NameVasavi 4
  • TypeOthers
  • Location
    • Bramhapuri Chandgaon Road
    • Bramhapuri
    • Brahmapuri (M Cl)
    • Brahmapuri
    • Chandrapur
    • 441206
  • Pincode441206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50900031338
  • ReraGenie IDRG-MH-03604

Builder

  • NameVasavi Developers
  • Entity typePartnership
  • PartnersSONALI WAMAN ANJIKAR, SEEMA PRAVINRAO UPLANCHIWAR, KIRAN SANJAY GOGULWAR, NILIMA RAJU NARLAWAR, ABHIJIT SURYAKANTRAO WALLALWAR, ATUL DATTATRY GOURSHETTIWAR
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredOct 2021PromisedJul 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2021
  • Promised completion31 Jul 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vasavi 4NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Vasavi 4: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area657 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
Parvez LakhaniBrahmapuri (M Cl)Chandrapur
Munish LakhaniBrahmapuri (M Cl)Chandrapur
Najim LakhaniBrahmapuri (M Cl)Chandrapur
Raziya lakhaniBrahmapuri (M Cl)Chandrapur
Firoz LakhaniBrahmapuri (M Cl)Chandrapur
Ali LakhaniBrahmapuri (M Cl)Chandrapur
Wasim LakhaniBrahmapuri (M Cl)Chandrapur

Approvals and building plan

Permissible FSI1468.54
Proposed, not sanctioned1,469 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPatel Nagar Amori Road Bramhapuri

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitendra Ingulkar
ArchitectShrushti Constructions
EngineerSV Engineers and ConstructionsConst
EngineerJay Bajrang Construction Bramhapuri
Chartered AccountantCA Abhinav Welekar
Chartered AccountantCA Kalash Patni
PartnerRole in project
Vasavi Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50900016538Jul 2022 → Jul 2023

Reason as filed by the promoterWe are waiting for the receipt of occupancy certificate which was applied on 28/06/2022 and we expect to receive it in coming two months. Hence we are applying for Extension till we receive the occupancy certificate.

EXT50900017289Jul 2022 → Jul 2024

Reason as filed by the promoterApplied for Occupancy Certificate with the Appropriate Authority. Waiting for Receipt of the same.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jan 2024

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Vasavi 4 Occupancy Certificate .pdf2 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Vasavi 4 .pdf2 Jan 2024
Building plan approvalFile: Vasavi 4 Revised_Plan.pdf4 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Vasavi 4 Revised_Plan.pdf4 Aug 2023
Declaration about Commencement CertificateFile: Format D.pdf4 Aug 2023
Declaration in FORM BFile: Form B Final.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 23.pdf17 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 23.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 23.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A June 23.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Mar 23.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Promoter Disclosure June 23.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 22_compressed.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 September 22_compressed.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December 22_compressed.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 23_compressed.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 23_compressed.pdf17 Jul 2023
Declaration in FORM BFile: Form B Extention Vasavi 4.pdf24 May 2023
Building plan approvalFile: Format D vasavi 4.pdf12 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Format D vasavi 4.pdf12 May 2023
Declaration about Commencement CertificateFile: Format D vasavi 4.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 21.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 22.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 22.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sept 22.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 22.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 21 v4_compressed.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 22 V4_compressed.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 22 V4_compressed.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 22 V4_compressed.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 22 V4_compressed.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A dec 21 V4.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mar 22 V4.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A June 22 V4.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Sept 22 .pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Dec 22 V4.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: Sold dec 21 V4.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: sold Mar 22.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: Sold june 22.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: Sold sept 22.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: sold dec 22.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 21 v4_compressed.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 22 V4_compressed.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 v4.pdf6 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 7 NA order Revised (1).pdf21 Sep 2022
Building plan approvalFile: 10 Building Plan Approval.pdf11 Oct 2021
PAN CardFile: PAN Card.pdf11 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 10 Building Plan Approval.pdf11 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate (1).pdf11 Oct 2021
OtherFile: 7 NA order Revised (1).pdf11 Oct 2021
Proforma of Allotment letterFile: 9 ATS.pdf9 Oct 2021
Layout approvalFile: 10 Layout Plan.pdf8 Oct 2021
Copy of the legal title reportFile: 4 Search Report.pdf8 Oct 2021
Details of encumbrancesFile: 5 Encumbrance.pdf8 Oct 2021
Copy of Layout Approval (in case of layout)File: 10 Layout Plan.pdf8 Oct 2021
Declaration about Commencement CertificateFile: commencement certificate 32.pdf8 Oct 2021
Declaration in FORM BFile: 6 Form B.pdf8 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Arcitecute Certificate.pdf8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Enginiar Certificate.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: Annexure 29_2018.pdf8 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Ceritificate.pdf8 Oct 2021
Proforma of Allotment letterFile: 8 Allotment letter.pdf8 Oct 2021

How this compares with Chandrapur

10%of Chandrapur projects moved their completion datethis one has not
39%of Chandrapur registrations have lapsed or been cancelledthis one is completed

Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.

Keep Vasavi 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bramhapuri220+ in Chandrapur

2 kmVasavi 4Completed 18Lapsed / revoked 3Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Vasavi Developers

Vasavi Developers has 2 registrations on MahaRERA, including VASAVI DEVELOPERS GAT NO 801 and Vasavi 4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Chandrapur district page.

Frequently asked questions

What are my rights if Vasavi 4 is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vasavi 4?

The registered promoter entity is Vasavi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vasavi 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vasavi 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vasavi 4?

The professionals named in the filing: Architect: Jitendra Ingulkar; Architect: Shrushti Constructions; Engineer: SV Engineers and ConstructionsConst; Engineer: Jay Bajrang Construction Bramhapuri; Chartered Accountant: CA Abhinav Welekar; Chartered Accountant: CA Kalash Patni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vasavi 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vasavi 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vasavi 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.