Home / Browse projects / Pune, Maharashtra / Varad Residency

Registered No litigation declared Residential / Group Housing project

Varad Residency

By Quality Construction

RG-MH-78095 · RERA P52100051529 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Varad Residency is a Residential / Group Housing project by Quality Construction in Pune, Maharashtra, registered with MahaRERA as P52100051529 on 23 Jun 2023. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameVarad Residency
  • TypeResidential / Group Housing
  • Location
    • S No 189/5 Otur Junnar Pune
    • Otur Junnar
    • Otur
    • Junnar
    • Pune
    • 412409
  • Pincode412409
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051529
  • ReraGenie IDRG-MH-78095

Builder

  • NameQuality Construction
  • Entity typePartnership
  • PartnersChandrakant Laxman Dumbre, Rushil Chandrakant Dumbre
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Building 1: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered1
Open Space22

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Suresh Sahadu DumbreJunnar (M Cl)Pune
Sachin Kisan DumbreOturPune
Kamal Kisan DumbreOturPune
Atul Kisan DumbreOturPune
Arun Sahadu DumbreOturPune

Approvals and building plan

Sanctioning authorityJunnar ambegaon sub division pune
Permissible FSI2869.94
Proposed, not sanctioned2,870 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOtur Junnar Pune 412409

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Swapnil C Parashar
EngineerStructural Engineer Prudent Designs Pvt Ltd
Chartered AccountantJ R Mulla and Associates
Chartered AccountantS.B Chavan & Company
PartnerRole in project
Quality Construction-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 upto 31-03-2026.pdf3 Jun 2026
Form 2File: form 2 upto 31-03-2026.pdf3 Jun 2026
Form 3File: form 3 upto 31-03-2026.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory upto 31-03-2026.pdf3 Jun 2026
Form 1File: form 1 upto 31-12-2025.pdf24 Feb 2026
Form 2File: form 2 upto 31-12-2025.pdf24 Feb 2026
Form 3File: form 3 upto 31-12-2025.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory upto 31-12-2025.pdf24 Feb 2026
Form 1File: Form 1 upto 30-09-2025.pdf6 Feb 2026
Form 2File: Form 2 upto 30-09-2025.pdf6 Feb 2026
Form 3File: Form 3 upto 30-09-2025.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: disclosure of Sold unsold inventory upto 30-09-2025.pdf6 Feb 2026
Form 1File: form 1 upto 30-06-2025.pdf23 Nov 2025
Form 2File: form 2 upto 30-06-2025.pdf23 Nov 2025
Form 3File: from 3 upto 30-06-2025.pdf23 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory upro 30-06-2025.pdf23 Nov 2025
Form 5 (FY 2024-2025)File: Varad Residency form 5-(2024-2025).pdf14 Nov 2025
Form 1File: Form 1 upto 30-09-2024.pdf4 Aug 2025
Form 2File: Form 2 upto 30-09-2024.pdf4 Aug 2025
Form 3File: Form 3 upto 30-09-2024.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory upto 30-09-2024.pdf4 Aug 2025
Form 1File: form 1 upto 31-12-2024.pdf4 Aug 2025
Form 2File: form 2 upto 31-12-2024.pdf4 Aug 2025
Form 3File: form 3 upto 31-12-2024.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory upto 31-12-2024.pdf4 Aug 2025
Form 1File: form 1 upto 31-03-2025.pdf4 Aug 2025
Form 2File: form 2 upto 31-03-2025.pdf4 Aug 2025
Form 3File: form 3 upto 31-03-2025.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory upto 31-03-2025.pdf4 Aug 2025
Form 1File: Form 1 upto 30-06-2024.pdf2 Aug 2025
Form 2File: Form 2 upto 30-06-2024.pdf2 Aug 2025
Form 3File: Form 3 upto 30-06-2024.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory upto 30-06-2024.pdf2 Aug 2025
Form 1File: Form 1 upto 31-12-2023.pdf31 Jul 2025
Form 2File: Form 2 upto 31-12-2023.pdf31 Jul 2025
Form 3File: Form 3 upto 31-12-2023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousure of sold and booked inventory upto 31-12-2023.pdf31 Jul 2025
Form 1File: Form 1 upto 30-06-2023.pdf31 Jul 2025
Form 2File: Form 2 upto 30-06-2023.pdf31 Jul 2025
Form 3File: Form 3 upto 30-06-2023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousure of sold and booked inventory upto 30-06-2023.pdf31 Jul 2025
Form 1File: Form 1 upto 30-09-2023.pdf31 Jul 2025
Form 2File: Form 2 upto 30-09-2023.pdf31 Jul 2025
Form 3File: Form 3 upto 30-09-2023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousure of sold and booked inventory upto 30-09-2023.pdf31 Jul 2025
Form 1File: Form 1 upto 31-03-2024.pdf31 Jul 2025
Form 2File: Form 2 upto 31-03-2024.pdf31 Jul 2025
Form 3File: Form 3 upto 31-03-2024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousure of sold and booked inventory upto 31-03-2024.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Varad Residency (form 3).pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Varad Residency (form 5).pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate 30-06-24.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineerscertificate_Varad residency.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Quality Park Disclosure June 24.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Varad Residency 30624_compressed.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 JUNE 2023 Varad Residency.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 SEP 2023 Varad Residency.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December 2023 Quality Royal Park.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MARCH 2024 Quality Royal Park.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 DECEMBER 2023 Varad Residency.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 MARCH 2024 Varad Residency.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 JUNE 2023 Varad Residency.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2, SEP 2023 Varad Residency.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 December 2023 Quality Royal Park.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 , March 2024 Quality Royal Park.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 DECEMBER 2023 Varad Residency.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 MARCH 2024 Varad Residency.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Disclousure of sold JUNE 2023 Varad Residency.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold SEP 2023 Varad Residency.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold December 2023 Quality Royal Park.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold MARCH 2024 Quality Royal Park.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold DECEMBER 2023 Varad Residency.pdf17 May 2024

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Varad Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Otur Junnar13,700+ in Pune

2 kmVarad ResidencyCompleted 3Lapsed / revoked 5Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Quality Construction

Quality Construction has 2 registrations on MahaRERA, including Quality Royal Park and Varad Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Varad Residency is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Varad Residency?

The registered promoter entity is Quality Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Varad Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Varad Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Varad Residency?

The professionals named in the filing: Architect: Architect Swapnil C Parashar; Engineer: Structural Engineer Prudent Designs Pvt Ltd; Chartered Accountant: J R Mulla and Associates; Chartered Accountant: S.B Chavan & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Varad Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Varad Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Varad Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.