Home / Browse projects / Pune, Maharashtra / The Life Park Phase I

Registered No litigation declared Residential / Group Housing project

The Life Park Phase I

By BANDHAN ABHAY TAMBE

RG-MH-60701 · RERA P52100054874 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 24%
16 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

The Life Park Phase I is a Residential / Group Housing project by BANDHAN ABHAY TAMBE in Pune, Maharashtra, registered with MahaRERA as P52100054874 on 15 Feb 2024. Possession is promised by 31 Dec 2027. 0 of the 16 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameThe Life Park Phase I
  • TypeResidential / Group Housing
  • Location
    • Domewadi Road
    • Tambemala 01
    • Otur
    • Junnar
    • Pune
    • 412409
  • Pincode412409
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054874
  • ReraGenie IDRG-MH-60701

Builder

  • NameBANDHAN ABHAY TAMBE
  • Entity typeIndividual
  • GSTIN27AFVPT1210P1ZS

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed74 files

Current status

0%0 of 16 units booked
0.0%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA20707
Wing BNA20909

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 24%.

Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B14%
ActivityProgress
Excavation24%
Basement (if any)0%
Podiums (if any)0%
Plinth24%
Stilt Floor0%
Slabs of Super Structure24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises24%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.24%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes5%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Open Space45
BuildingOpen SpaceTotal
Wing A3030
Wing B1515

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,870 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityTown Planning Authority
Permissible FSI2105.19
Proposed, not sanctioned1,693 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch House No 354/1, Near Pandhari Maruti Temple , A/p - Otur, Tal -Junnar, Dist- Pune 412409
Estimated costRs 3.31 cr
Work done0.0%
BuildingWingEstimatedIncurred
Wing ANARs 1.67 cr-
Wing BNARs 1.34 cr-
-NARs 30.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshish Barshikar
ArchitectAshish Sudhir Barshikar
EngineerPankaj Bhaskar Zaware
EngineerRahul Nivrutti Ghodke
Chartered AccountantAvinash Baban Gaykar
Chartered AccountantKarishama Avinash Gaykar
Chartered AccountantKarishma Avinash Gaykar
PartnerRole in project
BANDHAN ABHAY TAMBE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form01Q1.pdf9 Jul 2026
Form 2File: Form02Q1.pdf9 Jul 2026
Form 3File: Form03Q1.pdf9 Jul 2026
Disclosure of Sold and Booked InventoryFile: SoldandunsoldQ1.pdf9 Jul 2026
Form 1File: Form01Q4.pdf13 Apr 2026
Form 2File: Form02Q4.pdf13 Apr 2026
Form 3File: Form3Q4.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: SoldandunsoldQ4.pdf13 Apr 2026
Form 1File: Form1.pdf17 Jan 2026
Form 2File: Form2.pdf17 Jan 2026
Form 3File: Form3.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: SoldAndunsold.pdf17 Jan 2026
Form 1File: Form1.pdf18 Oct 2025
Form 2File: Form2.pdf18 Oct 2025
Form 3File: Form3F.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: SoldAndunsold.pdf18 Oct 2025
Form 5 (FY 2023-2024)File: Form5FY23-24.pdf28 Sep 2025
Form 5 (FY 2024-2025)File: Form5FY24-25.pdf28 Sep 2025
Form 1File: Form01Q03.pdf28 Jun 2025
Form 2File: Form02Q03N.pdf28 Jun 2025
Form 3File: Form03Q03.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold And Unsold Q 03.pdf28 Jun 2025
Form 1File: Form01Q04.pdf28 Jun 2025
Form 2File: Form02Q04.pdf28 Jun 2025
Form 3File: Form03Q04.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold And Unsold Q 04.pdf28 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form02Q03N.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form01Q03.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form03Q03.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form02Q03.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold And Unsold Q 03.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form01.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form03.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form02.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Soldandunsold.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: NOT Applicable.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: NOT Applicable.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: NOT Applicable.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NOT Applicable.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NOT Applicable.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: NOT Applicable.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold And Unsold.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NOT Applicable.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: NOT Applicable.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: NOT Applicable.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NOT Applicable.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form05.pdf26 Oct 2024
Building plan approvalFile: Clarification.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Clarification.pdf9 Feb 2024
Other - TechnicalFile: Annexure A.pdf5 Feb 2024
Layout approvalFile: LayoutA.pdf25 Jan 2024
Building plan approvalFile: NA Order .pdf25 Jan 2024
Details of encumbrances concerned to FinanceFile: encumbrance letter -finance.pdf25 Jan 2024
Details of encumbrances concerned to FinanceFile: encumbrance letter -legal.pdf25 Jan 2024
Details of encumbrances concerned to LegalFile: encumbrance letter -finance.pdf25 Jan 2024
Details of encumbrances concerned to LegalFile: encumbrance letter -legal.pdf25 Jan 2024
Copy of Layout Approval (in case of layout)File: LayoutA.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order .pdf25 Jan 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf25 Jan 2024
Declaration in FORM BFile: FromB.pdf25 Jan 2024
CERSAI detailsFile: CERSAI Search Report.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: desclosure of interst in other real estate organization.pdf25 Jan 2024
Proforma of Agreement for saleFile: Draft Agreement.pdf25 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT.pdf25 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: decleration about separet bank for real estate project.pdf25 Jan 2024
Deviation Report with respect to Allotment letterFile: deviation report with reports to model from of allotment letter.pdf25 Jan 2024
Deviation Report with respect to model copy of AgreementFile: deviation report with to model from of agreement asper annexure.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order .pdf23 Jan 2024
Layout approvalFile: LayoutB.pdf15 Jan 2024
Copy of the legal title reportFile: Legal Title Report.pdf15 Jan 2024
Copy of Layout Approval (in case of layout)File: LayoutB.pdf15 Jan 2024
PAN CardFile: 4] Bandhan-pan card.PDF15 Dec 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Life Park Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tambemala 0113,700+ in Pune

2 kmThe Life Park Phase ICompleted 2Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: BANDHAN ABHAY TAMBE

BANDHAN ABHAY TAMBE has 1 registration on MahaRERA, including The Life Park Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Life Park Phase I is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Life Park Phase I?

The registered promoter entity is BANDHAN ABHAY TAMBE, an individual as per the filing. Its GSTIN 27AFVPT1210P1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Life Park Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Life Park Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Life Park Phase I?

The professionals named in the filing: Architect: Ashish Barshikar; Architect: Ashish Sudhir Barshikar; Engineer: Pankaj Bhaskar Zaware; Engineer: Rahul Nivrutti Ghodke; Chartered Accountant: Avinash Baban Gaykar; Chartered Accountant: Karishama Avinash Gaykar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Life Park Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Life Park Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Life Park Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.