VANASHREE
By TRIMITI CONSTRUCTIONS PRIVATE LIMITED
RG-MH-23729 · RERA P99000079041 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VANASHREE is a Residential / Group Housing project by TRIMITI CONSTRUCTIONS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000079041 on 31 Jan 2025. Possession is promised by 31 Dec 2032. 7 of the 135 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.
At a glance
Project
- NameVANASHREE
- TypeResidential / Group Housing
- Location
- MALONDE
- SOMWAR PETH
- VASAI WEST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401201
- Pincode401201
- RERA no.P99000079041
- ReraGenie IDRG-MH-23729
Builder
- NameTRIMITI CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- DirectorsAMOL JANARDAN RAUT, RAJAN JANARDAN RAUT
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jan 2025
- Promised completion31 Dec 2032
- Revised completionNone
- Buildings2 building records
- Documents filed53 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VANASHREE WING -B | NA | 8 | 7 | 67 | 0 | 67 |
| VANASHREE WING -A | NA | 8 | 7 | 57 | 11 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 12%.
VANASHREE WING -B28%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VANASHREE WING -A18%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed146
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| VANASHREE WING -B | 80 | 80 |
| VANASHREE WING -A | 66 | 66 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VANASHREE CHSL | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VANASHREE WING -B | NA | Rs 10.06 cr | Rs 1.03 cr |
| VANASHREE WING -A | NA | Rs 10.06 cr | Rs 1.03 cr |
| - | NA | Rs 1.08 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJAY WADE AND ASSOCIATES |
| Engineer | SS SAVE ENGINEERS AND CONTRACTORS |
| Chartered Accountant | STR AND ASSOCIATES |
| Chartered Accountant | ACG & Associates |
| Partner | Role in project |
|---|---|
| TRIMITI CONSTRUCTIONS PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2032
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_Q1 APRIL - JUNE 2026.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2_Q1 APRIL - JUNE 2026.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: Form 3_Vanashree CHSL Q1 (Apr to June 26)-Signed.pdf | 13 Jul 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_VANASHREE FY 2024-25-SIGNED.pdf | 18 Jun 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A FY_2024-25.pdf | 15 Jun 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A FY_2025-26.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 - MAR 2026.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: FORM 2 - MAR 2026.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: FORM 3_VANASHREE CHSL Q4 MARCH 26-SIGNED.pdf | 1 May 2026 |
| Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_VANASHREE CHSL Q3 DEC 2025-SIGNED.pdf | 29 Jan 2026 |
| Form 1File: FORM 1 Q2 SEP 2025.pdf | 27 Oct 2025 |
| Form 2File: FORM 2 Q2 SEP 2025.pdf | 27 Oct 2025 |
| Form 3File: FORM 3_VANASHREE CHSL Q2 SEP 2025_SIGNED.pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY.pdf | 27 Oct 2025 |
| Form 1File: RERA_Form 1_2025-26_Q1.pdf | 19 Jul 2025 |
| Form 2File: RERA_Form 2_ Engineers Certificate_2025_26_Q1.pdf | 19 Jul 2025 |
| Form 3File: Form 3_Vanashree_Q1 2025-SIGNED.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory_2025_26_Q1.pdf | 19 Jul 2025 |
| Form 1File: RERA_Form 1_2024-25_Q4.pdf | 3 Jun 2025 |
| Form 2File: RERA_Form 2_ Engineers Certificate.pdf | 3 Jun 2025 |
| Form 3File: Form 3_Vanashree_Signed - converted.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 3 Jun 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: DECLARATION OF DISCLOSURE.pdf | 2 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3(REVISED).pdf | 11 Dec 2024 |
| Other - FinanceFile: Decleration_Land_Cost.pdf | 11 Dec 2024 |
| Copy of the legal title reportFile: Title_Search_Report_REVISED.pdf | 10 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: DECLARATION FINANCE REVISED1.pdf | 10 Dec 2024 |
| Proforma of Allotment letterFile: TCPL_Vanashree_Allotment Letter_RERA_Upload_Revised.pdf | 10 Dec 2024 |
| CERSAI detailsFile: CERSAI.pdf | 10 Dec 2024 |
| Details of encumbrances concerned to LegalFile: DECLARATION FINANCE REVISED1.pdf | 10 Dec 2024 |
| Other - TechnicalFile: CC VERIFICATION.pdf | 10 Dec 2024 |
| Proforma of Agreement for saleFile: Vanashree _Model_AFS_V2_RERA_Upload_Revised.pdf | 10 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RERA_Format_B_2.pdf | 10 Dec 2024 |
| Other - TechnicalFile: ANNEXURE A-DECLARATION CUM UNDERTAKING-1.pdf | 19 Nov 2024 |
| Building plan approvalFile: PLAN.pdf | 12 Nov 2024 |
| Layout approvalFile: PLAN.pdf | 12 Nov 2024 |
| PAN CardFile: TCPl_PAN_Card.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCES.pdf | 12 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN.pdf | 12 Nov 2024 |
| Declaration in FORM BFile: FORM B - AFFIDAVIT - converted.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tcpl_Vanashree_RERA_Form_1_Scaned.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tcpl_Vanashree_RERA_Form 2_Final_Signed.pdf | 12 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf | 12 Nov 2024 |
| Declaration about Commencement CertificateFile: FORMAT D CC DECLARATION.pdf | 12 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation_Report_AL.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCES.pdf | 12 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation_Report_Ltr - AFS.pdf | 12 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-AMOL RAUT.pdf | 12 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-RAJAN RAUT.pdf | 12 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VANASHREE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VASAI WEST3,200+ in Palghar
ARIANA
Mansarovar Estate Builders LLP
Sunteck Beach Residences 2
SUNTECK REAL ESTATES PRIVATE LIMITED
SHRIPAL SATTVA BLDG. 2
SHRIPAL SATTVA LLP
Sunteck Beach Residences 1
SUNTECK REAL ESTATES PRIVATE LIMITED
Sunteck Beach Residences 4
SUNTECK REAL ESTATES PRIVATE LIMITED
Milagrace Aura
Milagrace Developers
See every Palghar project, with the district possession charts
Builder: TRIMITI CONSTRUCTIONS PRIVATE LIMITED
TRIMITI CONSTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including VANASHREE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if VANASHREE is delayed beyond 31 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VANASHREE?
The registered promoter entity is TRIMITI CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VANASHREE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VANASHREE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VANASHREE?
The professionals named in the filing: Architect: AJAY WADE AND ASSOCIATES; Engineer: SS SAVE ENGINEERS AND CONTRACTORS; Chartered Accountant: STR AND ASSOCIATES; Chartered Accountant: ACG & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VANASHREE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.