ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / VAISHNAVI VIHAR

Registration lapsed No litigation declared Others project

VAISHNAVI VIHAR

By VAISHNAVI CONSTRUCTIONS

RG-MH-25374 · RERA P52100011466 · Last updated on MahaRERA portal: 24 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
15 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 70%
20 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

VAISHNAVI VIHAR is a Others project by VAISHNAVI CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100011466 on 31 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing. 36 of the 56 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.

At a glance

Project

  • NameVAISHNAVI VIHAR
  • TypeOthers
  • Location
    • -
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100011466
  • ReraGenie IDRG-MH-25374

Builder

  • NameVAISHNAVI CONSTRUCTIONS
  • Entity typePartnership
  • PartnersVANDANA VINAYAK BHAMBURE, TEJA RAHUL BORKAR
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

46 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed75 files

Current status

64%36 of 56 units booked

Figures as on 24 May 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VAISHNAVI VIHAR BUILDING BNA5540040
VAISHNAVI VIHAR BUILDING ANA5401616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.

VAISHNAVI VIHAR BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VAISHNAVI VIHAR BUILDING A64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3045.12
Proposed, not sanctioned1,545 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENTS GROUND FLOOR PLOT NO 3 BHANDARKAR ROAD PUNE 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP R NADKARNI
Chartered AccountantSplash and Company
PartnerRole in project
VAISHNAVI CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100010226Jun 2021 → Jun 2022

Reason as filed by the promoterNon availability of labour and scarcity of construction material due to Pandemic of Covid 19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Mar 2023

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Final SRJ.pdf24 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- Vaishnavi vihar 31-12-2022.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate-Vihar 31-03-2023.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech certificate vihar-30 June 2023.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-31-12-2022 _Vihar.pdf17 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold List 31-12-2022.pdf17 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 _ 2021-22.pdf20 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part completion- Vihar 11-10-2021.pdf13 Mar 2023
Details of encumbrancesFile: Encumbrance to Finance and Legal.pdf2 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance to Finance and Legal.pdf2 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance to Finance and Legal.pdf2 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A -2021-22--.pdf2 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf2 Jan 2023
Proforma of Agreement for saleFile: Agreement to Sale Draft_Compress.pdf2 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate- Vihar 30 sept 2022.pdf19 Nov 2022
Disclosure of sold/ booked inventoryFile: vaishnavi vihar wing A.pdf19 Nov 2022
Disclosure of sold/ booked inventoryFile: vaishnavi vihar Wing B.pdf19 Nov 2022
Disclosure of sold/ booked inventoryFile: vaishnavi vihar wing A.pdf19 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate- Vihar_compressed (1).pdf22 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Vaishnavi vihar site engineer certificate vihar.pdf22 Jul 2022
Disclosure of sold/ booked inventoryFile: vaishnavi vihar wing A (1) sold unsold inventory.pdf22 Jul 2022
Disclosure of sold/ booked inventoryFile: Vaishnavi vihar wing B (1) sold unsold inventory_compressed.pdf22 Jul 2022
Layout approvalFile: Layout.PDF5 Jul 2022
Building plan approvalFile: Floor Plan 1.PDF5 Jul 2022
Building plan approvalFile: Floor Plan 2.PDF5 Jul 2022
Building plan approvalFile: Floor Plan 3.PDF5 Jul 2022
Copy of Layout Approval (in case of layout)File: Layout.PDF5 Jul 2022
Building Plan Approval (IOD)File: Floor Plan 1.PDF5 Jul 2022
Building Plan Approval (IOD)File: Floor Plan 2.PDF5 Jul 2022
Building Plan Approval (IOD)File: Floor Plan 3.PDF5 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate vihar 31 march 2022_compressed.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: Inventory sold and unsold Vihar .pdf9 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate vihar 31 March 2022_compressed.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: site supervisor certificate vihar 31 march.pdf31 Mar 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate Vihar.pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf26 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion.pdf18 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan 16 Aug 2021_compressed (1).pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: vihar architect certificate_compressed.pdf5 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vihar engg 31 dec 21.pdf5 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A vihar 31 dec_compressed.pdf5 Jan 2022
Disclosure of sold/ booked inventoryFile: Vihar sold and unsold AB.pdf5 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate vihar_compressed.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate vihar_compressed.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vihar Eng Certificate.pdf20 Aug 2021
Declaration about Commencement CertificateFile: CC VIHAR.pdf5 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vaishnavi Vihar Form 1_compressed.pdf5 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VIHAR Engineer Cert.pdf5 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: VAISHNAVI VIHAR FORM 2A (1)_compressed.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory_compressed.pdf5 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vaishnavi Vihar.pdf22 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Vaishnavi Vihar.pdf22 Nov 2019
Layout approvalFile: ilovepdf_jpg_to_pdf(1).pdf16 Aug 2017
Building plan approvalFile: ilovepdf_jpg_to_pdf(1).pdf16 Aug 2017
Building plan approvalFile: ilovepdf_jpg_to_pdf(2).pdf16 Aug 2017
Building plan approvalFile: ilovepdf_jpg_to_pdf(3).pdf16 Aug 2017
PAN CardFile: vinayak(pan_card).pdf16 Aug 2017
Copy of the legal title reportFile: ilovepdf_jpg_to_pdf-ilovepdf-compressed-1-4.pdf16 Aug 2017
Copy of the legal title reportFile: ilovepdf_jpg_to_pdf-ilovepdf-compressed-5-9.pdf16 Aug 2017
Copy of the legal title reportFile: ilovepdf_jpg_to_pdf-ilovepdf-compressed-10-13.pdf16 Aug 2017
Details of encumbrancesFile: encum vihar.pdf16 Aug 2017
Copy of Layout Approval (in case of layout)File: ilovepdf_jpg_to_pdf(1).pdf16 Aug 2017
Building Plan Approval (IOD)File: ilovepdf_jpg_to_pdf(1).pdf16 Aug 2017
Building Plan Approval (IOD)File: ilovepdf_jpg_to_pdf(2).pdf16 Aug 2017
Building Plan Approval (IOD)File: ilovepdf_jpg_to_pdf(3).pdf16 Aug 2017
Declaration in FORM BFile: VIHAR DECLA-ilovepdf-compressed.pdf16 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_VC_1.pdf16 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_VV.pdf16 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vaishnavi_vihar(EC1).pdf16 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vaishnavi_vihar(EC2).pdf16 Aug 2017
Certificates of CA (Form 3)File: AC_VC_2.pdf16 Aug 2017
Proforma of Allotment letterFile: Final for Scanning ALLOTMENT LETTER and agreement vision.pdf16 Aug 2017

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAISHNAVI VIHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmVAISHNAVI VIHARCompleted 85Lapsed / revoked 34Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 185 registered projects within 2 km.

Builder: VAISHNAVI CONSTRUCTIONS

VAISHNAVI CONSTRUCTIONS has 2 registrations on MahaRERA, including VAISHNAVI COMPLEX and VAISHNAVI VIHAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that VAISHNAVI VIHAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VAISHNAVI VIHAR is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAISHNAVI VIHAR?

The registered promoter entity is VAISHNAVI CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAISHNAVI VIHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAISHNAVI VIHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAISHNAVI VIHAR?

The professionals named in the filing: Architect: P R NADKARNI; Chartered Accountant: Splash and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAISHNAVI VIHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAISHNAVI VIHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAISHNAVI VIHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.