Home / Browse projects / Bengaluru Urban, Karnataka / VAISHNAVI SENATE
VAISHNAVI SENATE
By VAISHNAVI INFRASTRUCTURE PVT LTD
RG-KA-81782 · RERA PRM/KA/RERA/1251/446/PR/041023/006299 · Last updated on RERA Karnataka portal: 14 Sep 2023
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
VAISHNAVI SENATE is a Commercial project by VAISHNAVI INFRASTRUCTURE PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/041023/006299 on 4 Oct 2023. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameVAISHNAVI SENATE
- TypeCommercial
- Location
- Bengaluru East
- Bengaluru Urban
- 560076
- Pincode560076
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/041023/006299
- ReraGenie IDRG-KA-81782
Builder
- NameVAISHNAVI INFRASTRUCTURE PVT LTD
- Entity typeCompany
- CINU70102KA2006PTC040918
- GSTIN29AACCV3531A1ZP
- Authorized SignatoryK.R Shoban Babu
- Managing DirectorC.N Govindaraju
- DirectorsC Asha Govindaraju, Darshan Govindaraju, Kishan Govindaraju
- Project HeadRadhakrishna
- Other registrations2 more →
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Oct 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed125 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vaishnavi Senate | - | - | - | 0 | 11 | 11 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
| Others | - |
Progress on shared amenities40
As on 14 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership6
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| B.S MANJUNATH | - | - |
| B. S. RAMESH | - | - |
| B.S NAGARAJ | - | - |
| B. S. RAVI | - | - |
| KATTAMMA | - | - |
| B S BINDU | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 169.45 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DILIP NADIG |
| Engineer | Hareesh Gowda |
| Chartered Accountant | S.P.Krishnamurthy & Co. |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed125
As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/041023/006299 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Updated the Source of funds with the supporting documentsFile: Source of funds with the supporting - com.pdf | 14 Sep 2023 |
| Uploaded Profit and loss and Balance sheet with Schedule - 2019-2020 with CA UDINFile: 1) BS PL 19-20 with UDIN Schedule.pdf | 14 Sep 2023 |
| Uploaded Profit and loss and Balance sheet with Schedule - 2020-2021 with CA UDINFile: 2) BS PL 20-21 with UDIN Schedule.pdf | 14 Sep 2023 |
| Uploaded Profit and loss and Balance sheet with Schedule - 2021-2022 with CA UDINFile: 3) BS PL 21-22 with UDIN Schedule.pdf | 14 Sep 2023 |
| Uploaded RTC for survey No. 178/2File: 5) RTC.pdf | 14 Sep 2023 |
| Uploaded latest EC dated 01-01-2022 - 31-08-2023File: 21) Encumbrance Certificate 01 Jan 2022 - 31 Aug 2023.pdf | 14 Sep 2023 |
| Uploaded advocate search report - updated 04th SepFile: 27) ADVOCATE SEARCH REPORT-REVISED.pdf | 14 Sep 2023 |
| Uploaded CDP map showing the proposed siteFile: 6) CDP.pdf | 14 Sep 2023 |
| Uploaded Village map showing the proposed siteFile: 7) Village Map with Site.pdf | 14 Sep 2023 |
| Uploaded Building LicenseFile: 8) Building Licence.pdf | 14 Sep 2023 |
| Uploaded KSPCB CFEFile: 9) KSPCB CFE Senate.PDF | 14 Sep 2023 |
| Uploaded sanctioned signed/digitally signed drawings,floor plans, sectional drawings and elevationsFile: 10) Approved Sanction plan - floor wise.pdf | 14 Sep 2023 |
| Uploaded the Sel attested copy of the Engineer lincense certificateFile: 11) Self attested Engineer Certificate.pdf | 14 Sep 2023 |
| Updated the Amenities and common area details, uploaded the Amenities and common area calculation shFile: 12) VAISHNAVI SENATE AMENITIES DETAILS.pdf | 14 Sep 2023 |
| Uploaded the Land costcalculation sheet as per the guidance value(self attested copy)File: 20) Guidance Land Value Calculation.pdf | 14 Sep 2023 |
| Uploaded the certificate from the registered Engineer indicating the structural safety for the projeFile: 15) Structural Stability certificate.pdf | 14 Sep 2023 |
| Uploaded brief of Estimated engineering cost certified by the engineerFile: 14) Brief Estimated cost certified by Engg.pdf | 14 Sep 2023 |
| Uploaded the Affidavit - BWSSB NOC, condition marked in the sanction planFile: 19) AFFIDAVIT_BWSSB NOC Condition marked.pdf | 14 Sep 2023 |
| Notarised Affidavit of Sec 3(1) updated with the project name and the addressFile: 16) Affidavit - Sec 3.pdf | 14 Sep 2023 |
| Uploaded the STP design drawing certified by the engineeras per the KSPCB NOCFile: 17) STP Senate certified.pdf | 14 Sep 2023 |
| Uploaded the Proforma Allotment letter in the prescribed formatFile: Allotment - VS.pdf | 14 Sep 2023 |
| Uploaded Proforma of the Agreement for sale as per GOK notifiedFile: AOS - L.pdf | 14 Sep 2023 |
| Uploaded Project specification certified by the EngineerFile: 18) Project specification - certified by Engg.pdf | 14 Sep 2023 |
| Uploaded BESCOM NOC with Fee receiptsFile: BESCOM NOC R.pdf | 14 Sep 2023 |
| RTC, survey 178/2 | - |
| Mutation, survey 178/2 | - |
| Encumbrance Certificate, survey 178/2 | - |
| Conversion/Alienation Order, survey 178/2 | - |
| JDA, survey 178/2 | - |
| Khatha, survey 178/2 | - |
| Registration CertificateFile: Certificate of Incorporation VIPL.pdf | - |
| Organization StructureFile: Org Chart Senate.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form2 - Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 - Engg certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non- litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA certificate.pdf | - |
| Balance Sheet 2021 - 2022File: Balance sheet - 2022.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet-31-3-2021-VIPL.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet-31-3-2020-VIPL.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Profit and loss - 2022.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Profit and Loss Ac as on 31-3-2021-VIPL.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Profit and Loss Ac as on 31-3-2020-VIPL.pdf | - |
| Director's Report 2021 - 2022File: Director Report Mar 2022 com.pdf | - |
| Director's Report 2020 - 2021File: Director Report Mar 21com.pdf | - |
| Director's Report 2019 - 2020File: Director Report Mar 2020VIPL com.pdf | - |
| Cash Flow Statement 2021 - 2022File: Cash flow -2022.pdf | - |
| Cash Flow Statement 2020 - 2021File: Cash Flow Statement-31-3-2021-VIPL.pdf | - |
| Auditor's Report 2021 - 2022File: Auditor Report-31-3-2022.pdf | - |
| Auditor's Report 2020 - 2021File: Auditor Report-31-3-2021-VIPL_compressed.pdf | - |
| Auditor's Report 2019 - 2020File: Auditor Report-31-3-2020-VIPL_compressed.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: VIPL IT Acknow AY 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: VIPL IT Acknow AY 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: VIPL IT Acknow AY 2020-21.pdf | - |
| NA Blank | - |
| BESCOM NOC-V Senate | - |
| BWSSB | - |
| V Senate BBMP Sanctioned plan | - |
| SITE PLAN | - |
| NA Blank | - |
| Section & Elevation | - |
| V Senate BBMP Sanctioned plan | - |
| Project Specification | - |
| Section & Elevation | - |
| NA Blank | - |
| NA Blank | - |
| Advocate search report | - |
| NA Blank | - |
| V Senate - JDA | - |
| Conversion Order - Commercial | - |
| NA Blank | - |
| NA Blank | - |
| V Senate - GPA | - |
| Draft - ATS F | - |
| Allotment letter | - |
| NA Blank | - |
| Form B | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Vaishnavi Tech Park | Plot No. 19/16/1 & 17/2, Ambalipura Village, Varthur Hobli, Ward No. 150, | Completed | - | No date filed |
| Vaishnavi Signature | #77, 1, Marathahalli - Sarjapur Outer Ring Rd, Bellandur, | Completed | - | No date filed |
| Vaishnavi ARS Gardenia | #1, S.M Road, T. Dasarahalli | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep VAISHNAVI SENATE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
NANDI MERAKI
NANDI HOUSING PRIVATE LIMITED
SOBHA MAGNUS
SOBHA LIMITED
SURAKSHA SPRINGS
AUK SURAKSHA PROPERTIES
ADARSH LAKE RESERVA Phase 1
M/s Adarsh Developers
RAJ BAY VISTA
SNN ARJUN BUILDERS LLP
SAIBYA SUNDEW
SAIBYA HOMES LLP
See every Bengaluru Urban project, with the district possession charts
Builder: VAISHNAVI INFRASTRUCTURE PVT LTD
Vaishnavi Infrastructure Pvt Ltd has 3 registrations on RERA Karnataka, including Vaishnavi Tech Square and VAISHNAVI SENATE. Its filings declare 4 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if VAISHNAVI SENATE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of VAISHNAVI SENATE?
The registered promoter entity is VAISHNAVI INFRASTRUCTURE PVT LTD, a company as per the filing. Its CIN U70102KA2006PTC040918 and GSTIN 29AACCV3531A1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in VAISHNAVI SENATE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VAISHNAVI SENATE?
The professionals named in the filing: Architect: DILIP NADIG; Engineer: Hareesh Gowda; Chartered Accountant: S.P.Krishnamurthy & Co.. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VAISHNAVI SENATE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback