Home / Browse projects / Mumbai Suburban, Maharashtra / Vaibhav CHS Ltd
Vaibhav CHS Ltd
RG-MH-12554 · RERA P51800004113 · Last updated on MahaRERA portal: 28 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 90 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vaibhav CHS Ltd is a Residential / Group Housing project by Swastik Realty Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004113 on 8 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 90 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameVaibhav CHS Ltd
- TypeResidential / Group Housing
- Location
- Off. Link road
- Goregaon west
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800004113
- ReraGenie IDRG-MH-12554
Builder
- NameSwastik Realty Pvt Ltd
- Entity typeCompany
- GSTIN27AABCS4042G1ZL
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- ChairpersonRajendra Laxman Wani
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2018)
- Buildings2 building records
- Documents filed130 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vaibhav CHS Ltd - A | NA | 12 | 12 | 0 | 0 | 0 |
| Vaibhav CHS Ltd - B | NA | 12 | 12 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.
Vaibhav CHS Ltd - A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 1% |
| Slabs of Super Structure | 11% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Vaibhav CHS Ltd - B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 1% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 33% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Vaibhav CHS Ltd - A | 12 | 12 |
| Vaibhav CHS Ltd - B | 6 | 6 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Space Moulders |
| Architect | Krishnakumar Laljibhai Gohel |
| Engineer | M G Consultant |
| Chartered Accountant | Shailesh l Kataria |
| Partner | Role in project |
|---|---|
| Swastik Realty Pvt Ltd | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project has been granted registration No is P51800004113 with validity up to 30th June, 2018. The real estate project comprises of ground plus 10 upper floors. Of these, the ground and 1st to 4th Floors have already been granted Occupancy Certificate and the flats situated therein handed over to the society members. Thereafter, these occupants have carried out several illegal additions and alterations to their premises which are contrary to the sanctioned OC Plan thereby causing FSI violations. As a result, though the rest of the building has already been completed, the promoter has been u
Reason as filed by the promoterThe project has been granted registration No.P51800004113 with validity up to 30.06.2019. The real estate project comprises of Ground + 10 upper floors. The said real estate project is completed in all respect upto 10th floors. Of these, the ground and 1st to 4th Floors have already been granted Occupancy Certificate and the flats situated therein handed over to the members and fit-out possession for the remaining members. The promoter has been unable to procure O.C. for the remaining floors, for the following reasons. The occupants have carried out several illegal additions and alterations to
Reason as filed by the promoterThe project has registration No. P51800004113 with validity upto 30.12.2020. Project is of G+10 upper floors. Project is completed in all respect upto 10th floors. OC is granted upto 4th floor and flats situated therein are handed over to members and fit-out possession has been given for the remaining members. Promoter has been unable to procure OC for remaining floors, for following reasons. Occupants have carried out illegal additions and alterations to their premises which are contrary to the sanctioned Plan thereby causing FSI violations. Report dtd.20.05.2018 submitted by EE/MCGM as per H
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 511/2017/2017 | High Court | Place the above Petition for hearing on Fifth February Two Thousand Eighteen subject to numbering |
| CARAP/123/2018/2018 | High Court Bombay | Disposed |
| CARBP/115/2018/2017 | High Court Bombay | Disposed |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000090122 | Jesa G. Patel (HUF) | Swastik Realty Pvt. Ltd. | 22/07/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Feb 2025
Documents filed130
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: MAHARERA Form B Declaration by Promoter.pdf | 28 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vaibhav Form 2A 24-25.pdf | 28 Apr 2025 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q4 FY 24-25.pdf | 26 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 Vaibhav FY 24-25 Jan to Mar.pdf | 26 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 Vaibhav FY 23-24 April to June.pdf | 24 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 Vaibhav FY 23-24 July to Sept.pdf | 24 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 Vaibhav FY 23-24 Oct to Dec.pdf | 24 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 4 23-24 B Wing.pdf | 24 Feb 2025 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q3 FY 24-25.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q2 FY 24-25.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q1 FY 24-25.pdf | 21 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4.pdf | 17 Feb 2025 |
| OtherFile: MYSCAN_20130220_0001.pdf | 15 Feb 2025 |
| OtherFile: MYSCAN_20130220_0002.pdf | 15 Feb 2025 |
| OtherFile: MYSCAN_20130220_0003.pdf | 15 Feb 2025 |
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 18 Jan 2025 |
| OtherFile: Explanatory Note.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 18 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 21-22 Vaibhav.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 22-23 Vaibhav.pdf | 17 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Work completion Certificate.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1 FY 22-23 Vaibhav.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q4 FY 23-24_compressed.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q3 FY 23-24_compressed.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q2 FY 23-24_compressed.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q1 FY 23-24_compressed.pdf | 30 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 Vaibhav FY 23-24.pdf | 30 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vaibhav FY 22-23.pdf | 30 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vaibhav FY 21-22.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q1.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q4 FY 22-23.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q3 FY 22-23.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q2 FY 22-23.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Vaibhav Form -3 - Q1 FY 22-23.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q4.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q3.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q2.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q4.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q3.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q2.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - VAIBHAV Q1.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Q-1 VAIBHAV SCAN.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - Vaibhav Q4.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - Vaibhav Q3.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - Vaibhav Q2.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Form -3 - Vaibhav Q1.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 1 22-23 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 3 22-23 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 3 22-23 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 2 22-23 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 4 22-23 AWing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 3 22-23 AWing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 2 22-23 AWing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MHARERA FORM 2A Qtr 1 22-23 AWing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 4 22-23 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 2 23-24 A Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 3 23-24 A Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 1 23-24 AWing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 4 23-24 A Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 1 23-24 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 2 23-24 B Wing.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MHARERA FORM 2A Qtr 3 23-24 B Wing.pdf | 29 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Vaibhav 23-24.pdf | 29 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Vaibhav 22-23.pdf | 21 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr1 A wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr2 A wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr3 A wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr4 A wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr1 B wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr2 B wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr3 B wing.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Qtr4 B wing.pdf | 21 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.pdf | 20 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-VP.pdf | 15 Oct 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC .pdf | 1 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Vaibhav Form 5.pdf | 1 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 VAIBHAV SCAN.pdf | 1 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate Vaibhav2021.pdf | 29 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A 1.pdf | 29 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A 1b.pdf | 29 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 130 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Vaibhav CHS Ltd on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon west6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 336 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Swastik Realty Pvt Ltd
Swastik Realty Pvt Ltd has 5 registrations on MahaRERA, including Neelgagan CHS Ltd and Matruchaya CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Vaibhav CHS Ltd shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Vaibhav CHS Ltd is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vaibhav CHS Ltd?
The registered promoter entity is Swastik Realty Pvt Ltd, a company as per the filing. Its GSTIN 27AABCS4042G1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vaibhav CHS Ltd?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Vaibhav CHS Ltd?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Vaibhav CHS Ltd?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vaibhav CHS Ltd?
The professionals named in the filing: Architect: Space Moulders; Architect: Krishnakumar Laljibhai Gohel; Engineer: M G Consultant; Chartered Accountant: Shailesh l Kataria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vaibhav CHS Ltd?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback