Home / Browse projects / Mumbai Suburban, Maharashtra / URBAN WAVES

Registered No litigation declared Residential / Group Housing project

URBAN WAVES

By HAREKRUSHNA DEVELOPERS LLP

RG-MH-28496 · RERA P51800026269 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 25 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 25 months from the original
3 of 11Construction stages donefurthest along: Podiums (if any), 90%
14 of 34Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

URBAN WAVES is a Residential / Group Housing project by HAREKRUSHNA DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026269 on 4 Sep 2020. Possession is promised by 31 Jul 2027. The completion date has moved by 25 months from the original filing. 20 of the 34 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameURBAN WAVES
  • TypeResidential / Group Housing
  • Location
    • Kadeshwari Marg
    • Bandra West
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800026269
  • ReraGenie IDRG-MH-28496

Builder

  • NameHAREKRUSHNA DEVELOPERS LLP
  • Entity typePartnership
  • PartnersPraveen Awate, Vihaan Doshi, Indraneel Roy, Jai Nagwani
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2020First promiseJun 2025Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Sep 2020
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed149 files

Current status

59%20 of 34 units booked
44.1%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Urban wavesNA2252834034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 90%.

Urban waves: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor90%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,910 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Apr 2026

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI10992.98
Proposed, not sanctioned10,993 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPrabhadevi
Estimated costRs 202.40 cr
Cost incurredRs 89.20 cr
Work done44.07%
BuildingWingEstimatedIncurred
Urban wavesNARs 193.00 crRs 85.00 cr
-NARs 9.40 crRs 4.20 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSet Square
EngineerJW Consultants LLP
EngineerManoj Kriplani
Chartered AccountantC.K.Patil
Chartered AccountantC K Patil
Chartered AccountantCHIRAG DOSHI
PartnerRole in project
HAREKRUSHNA DEVELOPERS LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019167Jun 2025 → Jun 2026

Reason as filed by the promoterProject Completion has been delayed due to certain mitigating circumstances beyond the control of the Promoter.

EA06042620564Jun 2025 → Jul 2027

Reason as filed by the promoterdue to mitigating circumstances beyond the control of the developer

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604249Keshav AgarwalHAREKRUSHNA DEVELOPERS LLP07/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Engi Certificate Waves Rera Form 2A.pdf5 Aug 2026
Withdrawal Update Form 1File: Ar Certificate Waves Rera.pdf23 Jul 2026
Withdrawal Update Form 2File: Engi Certificate Waves Rera.pdf23 Jul 2026
Withdrawal Update Form 3File: CA Certificate Waves Rera.pdf23 Jul 2026
Withdrawal Update Form 1File: Ar Certificate Waves Rera.pdf24 Apr 2026
Withdrawal Update Form 2File: Engi Certificate Waves Rera.pdf24 Apr 2026
Withdrawal Update Form 3File: CA Certificate Waves Rera.pdf24 Apr 2026
Withdrawal Update Form 1File: Ar Certificate Waves Rera.pdf6 Apr 2026
Withdrawal Update Form 1File: Ar Certificate Waves Rera.pdf6 Apr 2026
Withdrawal Update Form 2File: Engi Certificate Waves Rera.pdf6 Apr 2026
Withdrawal Update Form 2File: Engi Certificate Waves Rera.pdf6 Apr 2026
Withdrawal Update Form 3File: CA Certificate Waves Rera.pdf6 Apr 2026
Withdrawal Update Form 3File: CA Certificate Waves Rera.pdf6 Apr 2026
Form 1File: Form 1 waves June 25.pdf15 Dec 2025
Form 2File: Form 2 Waves Rera JIne 25.pdf15 Dec 2025
Form 3File: CA Certificate Waves Rera June 25.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Waves Rera June 25.pdf15 Dec 2025
Form 1File: form 1 waves sept 25.pdf15 Dec 2025
Form 2File: form 2 waves sept 25.pdf15 Dec 2025
Form 3File: ca from 3 waves sept 25.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Waves Rera sept 25.pdf15 Dec 2025
Form 5 (FY 2024-2025)File: CA Form 5 Waves Rera.pdf15 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Estimate Cost Details.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Dec 2024.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 2020.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 2020.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 2023_compressed.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 2023.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 jun 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 jun 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 mar 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 jun 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 mar 2022.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 2021.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 2021.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 jun 2021.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 mar 2021.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Dec2024.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Sep2021.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Dec2021.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Sep2021.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Jun2021.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Mar2021.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Dec 2020.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera Mar2022.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jun 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate Waves Rera.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2023_compressed.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sep 2023.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sep 2022.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june 2022.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 mar 2022.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sep 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 mar 2022.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sep 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jun 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jun 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 mar 2021.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2020.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2020.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sep 2020.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Waves Rera.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engi Certificate Waves Rera Form 2A.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate Waves Rera.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate Waves Rera Form 2.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Waves Rera.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engi Certificate Waves Rera Form 2A.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Waves Rera.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Waves Rera.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Waves Rera.pdf10 Oct 2024

How this compares with Mumbai Suburban

59%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 25 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep URBAN WAVES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra West6,700+ in Mumbai Suburban

2 kmURBAN WAVESCompleted 43Lapsed / revoked 14Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: HAREKRUSHNA DEVELOPERS LLP

HAREKRUSHNA DEVELOPERS LLP has 2 registrations on MahaRERA, including URBAN WAVES and Urban Waterfront. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if URBAN WAVES is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of URBAN WAVES?

The registered promoter entity is HAREKRUSHNA DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in URBAN WAVES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against URBAN WAVES?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for URBAN WAVES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at URBAN WAVES?

The professionals named in the filing: Architect: Set Square; Engineer: JW Consultants LLP; Engineer: Manoj Kriplani; Chartered Accountant: C.K.Patil; Chartered Accountant: C K Patil; Chartered Accountant: CHIRAG DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URBAN WAVES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URBAN WAVES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URBAN WAVES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.