Home / Browse projects / Pune, Maharashtra / Urban Village

Completed No litigation declared Residential / Group Housing project

Urban Village

By Girijapati Developers

RG-MH-19816 · RERA P52100004861 · Last updated on MahaRERA portal: 6 Jun 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2021Possession promisedregistration recorded completed
34 of 77Construction stages doneacross 7 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

Urban Village is a Residential / Group Housing project by Girijapati Developers in Pune, Maharashtra, registered with MahaRERA as P52100004861 on 9 Aug 2017. The registration is recorded completed; possession was promised by 22 Jan 2021. The completion date has moved by 18 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameUrban Village
  • TypeResidential / Group Housing
  • Location
    • Phaltan-Baramati Road
    • Tambe Wasti
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004861
  • ReraGenie IDRG-MH-19816

Builder

  • NameGirijapati Developers
  • Entity typePartnership
  • PartnerBharat Dungaram Sutar
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion22 Jan 2021
  • Revised completionRevised to 22 Jan 2021 (originally 23 Jul 2019)
  • Buildings7 building records
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type-1NA20000
Type 2A-2C and Type 2B-2DNA20000
Type-3BNA60000
Type-4C and Type-4DNA60000
RH-01 To RH-04NA20000
RH-05 To RH-08NA20000
RH-09 To RH-12NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 6 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

34 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Podiums (if any), at 0%.

Type-182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Type 2A-2C and Type 2B-2D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Type-3B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Type-4C and Type-4D73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RH-01 To RH-040%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH-05 To RH-080%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH-09 To RH-120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40
BuildingClosed/CoveredTotal
Type-111
Type 2A-2C and Type 2B-2D44
Type-3B1616
Type-4C and Type-4D1616
RH-01 To RH-0411
RH-05 To RH-0811
RH-09 To RH-1211

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,547 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4421.6
Proposed, not sanctioned4,422 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchnear Ajinkya Bazar, Bhigwan road

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGopal Suthar
EngineerHarshavardhan Shinde
PartnerRole in project
Girijapati Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002153Jul 2019 → Jul 2020

Reason as filed by the promoterThe permission for lift is yet to be received. The application dated 29/01/2019 is submitted for part completion with Baramati Municipal Council, Baramati.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000096115Proposed URBAN VILLAGE association through its Representative Somnath GhadgeGIRIJAPATI DEVELOPERS09/10/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Jun 2021

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Girijapati.pdf6 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy_Certificate.pdf1 Jun 2021
Annual Audit Report of Statutory CA (Form 5)File: Form-5.pdf27 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Revised_NA_Order (Commencement).pdf17 May 2018
Building plan approvalFile: TYPE-3B_2BHK_Rev1.pdf13 Mar 2018
Building plan approvalFile: RH-1 to 12_Rev1.pdf13 Mar 2018
Building plan approvalFile: MainLayout_Rev1.pdf13 Mar 2018
Building plan approvalFile: MainLayout_Rev1.pdf13 Mar 2018
Building plan approvalFile: Types-1_Rev1.pdf13 Mar 2018
Building plan approvalFile: TYPE-2(A,B,C,D)_Rev1.pdf13 Mar 2018
Building plan approvalFile: TYPE-2(A,B,C,D)_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: MainLayout_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: MainLayout_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: Types-1_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: TYPE-2(A,B,C,D)_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: TYPE-2(A,B,C,D)_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: TYPE-3B_2BHK_Rev1.pdf13 Mar 2018
Building Plan Approval (IOD)File: RH-1 to 12_Rev1.pdf13 Mar 2018
OtherFile: SiteLayoyt_SketchForReference1.pdf13 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EngineersCertificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf31 Jul 2017
Building plan approvalFile: SiteLayout.pdf30 Jul 2017
Building plan approvalFile: Type1.pdf30 Jul 2017
Building plan approvalFile: Type2.pdf30 Jul 2017
Building plan approvalFile: Type3.pdf30 Jul 2017
Building plan approvalFile: Type4.pdf30 Jul 2017
Copy of the legal title reportFile: Legal Title Report1.pdf30 Jul 2017
Copy of the legal title reportFile: Legal Title Report2.pdf30 Jul 2017
Copy of the legal title reportFile: Legal Title Report3.pdf30 Jul 2017
Details of encumbrancesFile: NoEncumbrancesCertificate.pdf30 Jul 2017
Building Plan Approval (IOD)File: SiteLayout.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type1.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type2.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type3.pdf30 Jul 2017
Building Plan Approval (IOD)File: Type4.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: girijapati Arch.pdf30 Jul 2017
Proforma of Allotment letterFile: model agreement.pdf30 Jul 2017
OtherFile: SiteLayoyt_SketchForReference.pdf30 Jul 2017
OtherFile: ApplicationForPartOccupancy.pdf30 Jul 2017
Layout approvalFile: NAOrder.PDF29 Jul 2017
Copy of Layout Approval (in case of layout)File: NAOrder.PDF29 Jul 2017
Declaration in FORM BFile: Declaration in FORM B.pdf29 Jul 2017
PAN CardFile: Pan Card Girijapati Developers.pdf28 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Urban Village on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tambe Wasti13,700+ in Pune

2 kmUrban VillageCompleted 11Lapsed / revoked 12Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: Girijapati Developers

Girijapati Developers has 2 registrations on MahaRERA, including Urban Village and Urban Village Row Houses. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Urban Village is delayed beyond 22 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Urban Village?

The registered promoter entity is Girijapati Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Urban Village?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Urban Village?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Urban Village?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Urban Village?

The professionals named in the filing: Architect: Gopal Suthar; Engineer: Harshavardhan Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Urban Village?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Urban Village. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Urban Village to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.