Home / Browse projects / Pune, Maharashtra / URBAN HOMES B WING

Completed No litigation declared Others project

URBAN HOMES B WING

By LOTUS PROPERTIES

RG-MH-68769 · RERA P52100047919 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
32 of 184Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

URBAN HOMES B WING is a Others project by LOTUS PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100047919 on 1 Dec 2022. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 4 months from the original filing. 152 of the 184 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameURBAN HOMES B WING
  • TypeOthers
  • Location
    • -
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100047919
  • ReraGenie IDRG-MH-68769

Builder

  • NameLOTUS PROPERTIES
  • Entity typePartnership
  • GSTIN27ABLFS6667B1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSANTOSH VITHALDAS KARNAWAT, ULHAS SHANKAR SHETTY, Balaji Landmarks Private Limited
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2022First promiseDec 2025Revised toApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Dec 2022
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed136 files

Current status

83%152 of 184 units booked
100.0%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
URBAN HOMES B WINGNA171516618184

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

URBAN HOMES B WING: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes66%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes66%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes66%

Parking filed346

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots346
Closed/Covered317
Open Space29

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,465 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchawad Municiple Corporation
Permissible FSI13622.24
Proposed, not sanctioned13,622 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMALA CROSSROADS, FINOLEX CHOWK UNIT NOS 1 TO 4 AND 26 TO 29, A WING OPP PCMC OFFICE, PIMPRI, PUNE-
Estimated costRs 32.29 cr
Cost incurredRs 32.28 cr
Work done99.96%
BuildingWingEstimatedIncurred
URBAN HOMES B WINGNARs 29.80 crRs 29.78 cr
-NARs 2.50 crRs 2.50 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHASHANK PHADKE
EngineerDINESH LALWANI
Chartered AccountantVaibhav Ram Mayur
PartnerRole in project
LOTUS PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28022620052Dec 2025 → Apr 2026

Reason as filed by the promoterWe hereby submit this application for extension of the project registration period. The Occupancy Certificate for the above project has also been received on 06.01.2026 and was issued with effect from 22.12.2025, which falls within the RERA Registration Completion Date, i.e., 31.12.2025. In order to accurately reflect the correct completion date and FSI parking details as per the latest sanctioned plan, we kindly request an extension to enable us to file a correction application and update the project details accordingly.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601206PRAMOD DILIP YADAVLOTUS PROPERTIES06/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: PCMC TO RERA mail SS.pdf29 May 2026
Withdrawal Update Form 1File: form 1 FY 2025-26 Q4 Final.pdf28 May 2026
Withdrawal Update Form 2File: Form 2 FY 2025-26 Q4 Final.pdf28 May 2026
Withdrawal Update Form 3File: Form 3 FY 2025-26 Q4 Final.pdf28 May 2026
Occupational CertificateFile: Completion Cetificate.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4 B wing final.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 for FY 2025 26- Q4 final.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q4- B Wing.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26 B Wing final.pdf17 Apr 2026
Layout approvalFile: 01- Master Layout.pdf10 Mar 2026
Building plan approvalFile: 02- Upper Lower Basement A wing.pdf10 Mar 2026
Building plan approvalFile: 03- A wing 1st floor.pdf10 Mar 2026
Building plan approvalFile: 04- A wing 2nd To 14 th floor.pdf10 Mar 2026
Building plan approvalFile: 05- A wing 8th 13th Terrace Floor.pdf10 Mar 2026
Building plan approvalFile: 06- A wing Section.pdf10 Mar 2026
Building plan approvalFile: 07- A wing Elevation.pdf10 Mar 2026
Building plan approvalFile: 08- B wing Lower basement.pdf10 Mar 2026
Building plan approvalFile: 09- B wing Upper Basement.pdf10 Mar 2026
Building plan approvalFile: 10- B wing Ground floor.pdf10 Mar 2026
Building plan approvalFile: 11- B wing 1st floor.pdf10 Mar 2026
Building plan approvalFile: 12- B wing 2nd to 12th floor.pdf10 Mar 2026
Building plan approvalFile: 13- B wing 13th 14th floor.pdf10 Mar 2026
Building plan approvalFile: 14- B wing Terrace Floor.pdf10 Mar 2026
Building plan approvalFile: 15- B wing Elevation.pdf10 Mar 2026
Building plan approvalFile: 16- B wing Section.pdf10 Mar 2026
Building plan approvalFile: 17- B wing Upper Lower basement floor.pdf10 Mar 2026
Building plan approvalFile: 18- C wing Ground 1st floor.pdf10 Mar 2026
Building plan approvalFile: 19- C wing 2nd To 14th floor.pdf10 Mar 2026
Building plan approvalFile: 20- C wing 8th 13th Terrace Floor.pdf10 Mar 2026
Building plan approvalFile: 21- C wing Section.pdf10 Mar 2026
Building plan approvalFile: 22- Club House.pdf10 Mar 2026
Building plan approvalFile: 23- Ground upper basement parking.pdf10 Mar 2026
Building plan approvalFile: 24- Lower Basement Parking.pdf10 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf28 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 for FY 2024-25 B Wing.pdf19 Feb 2026
Withdrawal Update Form 1File: Lotus - Form1 - 327.pdf11 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf11 Feb 2026
Withdrawal Update Form 3File: CA Certificate Form 3 for FY 2025-26 Q3.pdf11 Feb 2026
Withdrawal Update Form 1File: Architect Certificate 06-11-25.pdf29 Jan 2026
Withdrawal Update Form 2File: Engineer certificate form 2 FY 25-26 Q2 B WING.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 for FY-2025-26 for Q2-B Wing sign.pdf29 Jan 2026
Withdrawal Update Form 1File: Architect Certificate 06-11-25.pdf28 Jan 2026
Withdrawal Update Form 2File: Engineer certificate form 2 FY 25-26 Q2 B WING.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 for FY-2025-26 for Q2-B Wing sign.pdf28 Jan 2026
Withdrawal Update Form 1File: Form 1 B wing (Architect Certificate).pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 B wing (Architect Certificate).pdf30 Oct 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE (April-June 2024) B wing_compressed.pdf30 Oct 2025
Withdrawal Update Form 2File: FORM 2 (Engineer Certificate) B WING.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 FY 24-25 Q1 Wing B_compressed.pdf30 Oct 2025
Withdrawal Update Form 3File: Revised Form 3 25 sep.pdf30 Oct 2025
Commencement certificateFile: Lotus Charholi (2).pdf9 Jul 2025
Form 1File: Lotus - Form 1 - 06 (1).pdf16 May 2025
Form 2File: Form 2- B wing- FY 24-25 Q4.pdf16 May 2025
Form 3File: VSAP & COMPANY FORM-3 URBAN HOMES WING-B.pdf16 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 2024-25 Q3 B WING.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 B wing.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - B wing (Oct 24 To Dec 24).pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 (2024-25) B wing.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lotus Form 1 Wing B.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 'S CERTIFIATE-B.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lotus Form1 B wing.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (April-June 2024) B wing_compressed.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 Q1 Wing B_compressed.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 FY 2024-25 Q1 B wing.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY-23-24 Q3 Urban homes Wing -B.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 B WING_compressed.pdf13 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lotus - Form1 B WING.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE B-WING.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lotus - Form 1 - 372 - B.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE-2 08-01-2024 - B.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- B.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Form 1) B.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (form 2 ) b.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing- Form3- April- June 23.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1- B wing (April-June 2023).pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate B-Wing (2).pdf15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lotus - Form1 Jan-March 23.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate B-Wing (1).pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B WING Form 3 (Jan-March 23).pdf15 Apr 2023
Other - LegalFile: Reconstitution Of Partnership Deed.pdf27 Jan 2023

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep URBAN HOMES B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: LOTUS PROPERTIES

LOTUS PROPERTIES has 3 registrations on MahaRERA, including URBAN HOMES B WING and URBAN HOMES A WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if URBAN HOMES B WING is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of URBAN HOMES B WING?

The registered promoter entity is LOTUS PROPERTIES, a partnership as per the filing. Its GSTIN 27ABLFS6667B1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in URBAN HOMES B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against URBAN HOMES B WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for URBAN HOMES B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at URBAN HOMES B WING?

The professionals named in the filing: Architect: SHASHANK PHADKE; Engineer: DINESH LALWANI; Chartered Accountant: Vaibhav Ram Mayur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URBAN HOMES B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URBAN HOMES B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URBAN HOMES B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.